Planning application
Fulham Gas Works Imperial Road London
Works: Demolition
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Planning Application (part-detailed, part-outline) for demolition of existing buildings and structures (excluding No.2 Gasholder, 1856 Chief Engineer's Office, 1927 Former Research Laboratory, 1920 WW1 War Memorial and WW2 War Memorial) and redevelopment to provide a residential-led mixed use development comprising the erection of new buildings ranging from 1 to 37 storeys to provide up to 1,843 (including 646 Affordable Housing) residential units and ancillary residential facilities (C3 Use) and non-residential floorspace in Use Classes A1, A2, A3, A4, B1, D1 and D2, the provision of a new publicly accessible open space, new pedestrian and vehicle routes, accesses and amenity areas, basement level car park with integral servicing areas, interim works and other associated works: 1) Detailed planning application for 37,774sqm (GEA) residential floorspace together with 712sqm (GEA) ancillary residential facilities (C3 Use); 982sqm (GEA) flexible commercial floorspace (A1, A2, A3, A4 Uses); 3,432sqm (GEA) community and leisure floorspace (D1/D2 Use); provision of a 10,365sqm (GEA) basement; new pedestrian and vehicular access; provision of amenity space, landscaping, car and cycle parking, refuse storage, energy centre, servicing area, and other associated infrastructure works. 2) Outline planning application (with all matters reserved) for up to 166,560sqm (GEA) residential floorspace and ancillary residential facilities (C3 Use); up to 6,895sqm non-residential floorspace comprising flexible commercial retail (A1, A2, A3, A4 Uses), office (B1 Use), community (D1 Use) and leisure (D2 Use) floorspace; provision of up to 30,573sqm (GEA) new basement level; new pedestrian and vehicular access; and associated amenity space, publicly accessible open space, landscaping, car and cycle parking, refuse storage, energy centres, servicing area, and other associated infrastructure works.
As published by the council, reference 2018/02100/COMB
Application record
- Reference
- 2018/02100/COMB
- Type
- Combined Full and Outline Application
- Status
- Application Approved
- Decision
- Granted As published: Application Approved
- Received
- 14 Jun 2018
- Validated
- 14 Jun 2018
- Decided
- 8 Feb 2019
- Ward
- Parsons Green And Walham
- Decision by
- Committee Decision
Site history
Applications at this address on the Hammersmith and Fulham register
This site has had 118 applications since 2017: 39 approved, 0 refused.
-
P/2026/02356/NMAT Awaiting decision
Fulham Gas Works Imperial Road London
Non-Material Amendment to Planning Permission (ref: 2018/02100/COMB) dated 8 February 2019 (as amended by ref: 2024/00961/VAR dated 3 December 2024), in respect of the description of development to change it from "Planning Application (part-detailed, part-outline) for demolition of existing buildings and structures (excl. No.2 Gasholder, 1856 Chief Engineer's Office, 1927 Research Laboratory, 1920 WWI War Memorial and WW2 War Memorial) and redevelopment to provide a residential-led mixed use development comprising the erection of new buildings" to "Planning Application (part-detailed, part-outline) for demolition of selected existing buildings and structures and redevelopment to provide a residential-led mixed use development comprising the erection of new buildings", specifically allowing the insertion of "selected" and the deletion of "(excl. No.2 Gasholder, 1856 Chief Engineer's Office, 1927 Research Laboratory, 1920 WWI War Memorial and WW2 War Memorial)"
-
P/2026/02015/DET Awaiting decision
Fulham Gas Works Imperial Road London
Details to discharge Condition 62 (Road Safety Audit) for Plot H1 (Phase 4b) pursuant to Planning Permission (ref: 2018/02100/COMB) dated 8 February 2019 as varied by (ref: 2024/00961/VAR dated 23 December 2024).
-
P/2026/01772/NMAT Awaiting decision
Fulham Gas Works,Imperial Road,London
Non-Material Amendment to Planning Permission (ref: 2018/02100/COMB ) dated 8 February 2019 (as amended by ref: 2024/00961/VAR dated 3 December 2024), in respect of Condition 73 (details and materials). The proposed amendment being the requirement of a mock up to be provided remotely for review by officers rather than on site.
-
P/2026/01754/DLBC Granted
Fulham Gas Works Imperial Road London
Details of paint finishes, in compliance with Condition 3 of Listed Building Consent (ref: 2025/00568/LBC) dated 23 July 2026.
-
P/2026/01473/DET Granted
Fulham Gas Works Imperial Road London
Details to discharge Condition 20 (Verification Report) for Phases 3b, 3c and 3d (Development Plots E1 and E2) pursuant to Planning Permission (ref: 2018/02100/COMB) dated 8 February 2019 as varied by (ref: 2024/00961/VAR dated 23 December 2024).
-
P/2026/01890/VAR Awaiting decision
Fulham Gas Works Imperial Road London
Variation of Condition 1 (Drawings) of reserved matters details relating to the approval of access; appearance; landscaping; layout and scale in respect of Phases 4b, 4c and 4d (Development Plots H1 and H2); for the erection of two buildings comprising residential and non-residential floorspace with associated landscaping approved under 2024/01420/RES granted 17 January 2025 of planning permission 2018/02100/COMB granted 8 February 2019 (as amended by refs 2020/01088/NMAT and 2024/00818/NMAT). As varied by 2024/00961/VAR variation of Condition 4 (Drawings) and Condition 5 (Design Codes and Parameter Plans) of planning permission 2018/02100/COMB granted 8 Feb 2019 (as amended by refs 2020/01088/NMAT and 2024/00818/NMAT). The proposed amendments to Phase 4b Development Plot H1 comprise: (a) revisions to tower and shoulder terrace heights within consented maximum parameter heights (comprising an increase in shoulder height and reduction in tower height); (b) changes to the arrangemen... read more
-
P/2026/01214/DET Awaiting decision
Fulham Gas Works Imperial Road London
Details to discharge Condition 16 (Preliminary Risk Assessment) for Development Phases 3a, 4a, 5a, 5b and 6 pursuant to Planning Permission (ref: 2018/02100/COMB) dated 8 February 2019 as varied by (ref: 2024/00961/VAR dated 23 December 2024).
-
P/2026/01125/ADV Granted
Fulham Gas Works Imperial Road London
Display of 1no. internally illuminated fascia sign and 2no. non-illuminated projecting signs to Unit 4a, phase 1
-
P/2026/01024/DET Awaiting decision
Fulham Gas Works Imperial Road London
Details to discharge Condition 87 (Materials) for development Development Plot H1 (Phase 4b) pursuant to Planning Permission (ref: 2018/02100/COMB) dated 8 February 2019 as varied by (ref: 2024/00961/VAR dated 23 December 2024).
-
P/2026/01008/DET Awaiting decision
Fulham Gas Works,Imperial Road,London
Details to discharge Condition 74 (1:20 details) for development Development Plot H1 (Phase 4b) pursuant to Planning Permission (ref: 2018/02100/COMB) dated 8 February 2019 as varied by (ref: 2024/00961/VAR dated 23 December 2024)
Timeline
Dates from the published record
-
14 Jun 2018
Received by Hammersmith and Fulham
-
8 Feb 2019
Decision issued: Application Approved
-
9 Oct 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Quod Ltd Agent
1,109 applications on PlanIndex · across 131 councils · 97% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
265 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Hammersmith and Fulham granted permission on 8 February 2019, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About outline applications
An outline application tests the principle of developing a site, holding back details such as appearance and landscaping as reserved matters for later approval. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Fulham Gas Works Imperial Road London
Details to construct a single storey temporary show apartment within Phase 1b (Development Plot A3) for a period of 18 months; in compliance with Condition 11 (Temporary Land Uses) of planning permission (ref: 2018/02100/COMB) dated 8 February 2019.
Granted Conditions 8 docsSmall domestic -
Fulham Gas Works Imperial Road London
95% historically approved · decision due ~30 Mar
Details to discharge conditions 74 (1:20 Details) and condition 75 (A1/A3 1:20 Details) of planning permission 2018/02100/COMB dated
Awaiting decision Conditions 14 docs -
Fulham Gasworks Imperial Road London
Reserved Matters Application (access, appearance, landscaping, layout and scale) in respect of Phase 2a (Development Plot B1) for the erection of a single storey pavilion-style building comprising 205sqm of flexible floorspace (Use Classes A1, A2, A3, A4 and B1) with associated landscaping pursuant to planning application 2018/02100/COMB granted 8 February 2019 (comprehensive residential led mixed use redevelopment of the former Gasworks Site).
Granted Reserved matters 31 docsSmall domestic -
30 - 32 Bradmore Park Road London W6 0DT
Details of demolition notice, in compliance with condition 3 of planning permission (ref: 2017/03836/FUL) dated 22nd December 2017.
Granted Conditions Demolition 13 docs -
Fulham Gasworks Imperial Road London
Details of Air Quality Assessment, in compliance with condition 41 of planning permission 2018/02100/COMB dated 8th February 2019.
Awaiting decision Conditions 5 docs -
Fulham Gas Works Imperial Road London
95% historically approved · decision due ~22 Mar
Details to partially discharge condition 11 (Temporary land uses - Temporary Welfare Drawing Package), of planning permission 2018/02100/COMB dated 8 February 2019.
Awaiting decision Conditions 4 docs
Other outline applications
In Hammersmith and Fulham
-
2025/02524/SCREIA Decided
74 - 86 Carnwath Road London SW6 3JX
Request for an Environmental Impact Assessment (EIA) screening opinion pursuant to Regulation 6 of the Town and Country Planning (Environmental Impact Assessment) Regulations 20171 (hereafter referred to as the EIA Regulations) in relation to the proposed redevelopment of 74-86 Carnwath Road, Fulham, London (hereafter referred to as the Site). The Applicant intends to submit a full planning application for the construction of a ground + six-storey building for co-living use with approximately 310-330 co-living beds, 5,000 sqft of Class E/F (nonresidential use) space at ground level and c.550 sqm of public realm (hereafter referred to as the Proposed Development). It is anticipated that five blue badge parking spaces will be the only car parking provision for the scheme. Whilst the design of the Development is not yet fixed for the purposes of the full planning application, the information provided to Waterman by the Applicant and their consultant team, and contained herein, is cons... read more
-
2025/01842/SCREIA Decided
74 - 86 Carnwath Road London SW6 3JX
2025/01842/SCREIARequest for an Environmental Impact Assessment (EIA) screening opinion pursuant to Regulation 6 of the Town and Country Planning (Environmental Impact Assessment) Regulations, 2017, in relation to the proposed redevelopment of 74 - 86 Carnwath Road, Fulham, London. The Applicant intends to submit a full planning application for the Demolition of existing buildings and structures on site and erection of a new building comprising 6 storeys plus plant at rooftop level, to comprise co living accommodation at part ground to upper floors, and mixed flexible Class E F use at ground level plus external amenity spaces, new public realm, pedestrian cycle highway access works and associated works.
-
2025/00975/SCREIA Decided
Chelsea Creek Highways Depot Lots Road London SW10 0RN
Environmental Impact Assessment (EIA) request for a Screening Opinion made pursuant to Regulation 6(1) of the Town and Country Planning (EIA) Regulations 2017 (as amended) relating to a proposed development comprising a) the demolition of the existing buildings on the site; b) erection of three buildings comprising five blocks of up to 13 storeys plus basement, providing approximately 280 dwellings (including affordable extra care housing, affordable general needs housing and market housing) (Use Class C3) and approximately 2,100m2 commercial floor space (Use Classes E, F2 and Sui Generis) together with associated servicing, blue badge parking, bicycle storage and public realm; and c) works to the Chelsea Creek wall including construction of a new retaining wall, raising of the river defences to a height of up to 6.4m AOD and the provision of associated landscaping within Chelsea Creek.
-
2024/03003/SCOEIA Decided
Ph nix Academy The Curve London W12 0RQ
This letter requests a formal Scoping Opinion from the London Borough of Hammersmith and Fulham (LBHF) with respect to the scope and methodology of the Environmental Impact Assessment (EIA) undertaken for an upgraded replacement school and residential development on approximately 3.8 hectares (ha) of land at the Phoenix Academy, Shepherds Bush. The findings of the EIA will be reported in an Environmental Statement (ES) which will accompany the detailed planning application. School Component Retention and modernisation of the existing school buildings on the eastern portion of the Site, providing state of the art classrooms, technology and energy efficient designs. Delivery of two of the following new school buildings up to 3 storeys in height: Teaching Block approximately 3,500 sqm GIA. An additional education space to accommodate new students, including an early childhood education centre and vocational training facilities. Sports Hall Block approximately 1,000 sqm GIA. A new... read more
-
2020/01516/DEM Awaiting decision
104 King Street London W6 0QW
Application as to whether prior approval is required under Class B Part 11 of Schedule 2 of the Town and Country Planning (General Permitted Development) (England) Order 2015 for the demolition of Timber open side storage building and Timber processing building.