Planning application
Fulham Gas Works Imperial Road London
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Display of 1no. internally illuminated fascia sign and 2no. non-illuminated projecting signs to Unit 4a, phase 1
As published by the council, reference P/2026/01125/ADV
Application record
- Reference
- P/2026/01125/ADV
- Type
- Advertisement
- Status
- Decided: APPLICATION APPROVED
- Decision
- APPLICATION APPROVED
- Received
- 27 Apr 2026
- Validated
- 1 May 2026
- Decided
- 3 Jul 2026
- Ward
- Parsons Green And Sandford
Site history
Applications at this address on the Hammersmith and Fulham register
This site has had 109 applications since 2020: 31 approved, 0 refused.
-
P/2026/02015/DET Awaiting decision
Fulham Gas Works Imperial Road London
Details to discharge Condition 62 (Road Safety Audit) for Plot H1 (Phase 4b) pursuant to Planning Permission (ref: 2018/02100/COMB) dated 8 February 2019 as varied by (ref: 2024/00961/VAR dated 23 December 2024).
-
P/2026/01772/NMAT Awaiting decision
Fulham Gas Works,Imperial Road,London
Non-Material Amendment to Planning Permission (ref: 2018/02100/COMB ) dated 8 February 2019 (as amended by ref: 2024/00961/VAR dated 3 December 2024), in respect of Condition 73 (details and materials). The proposed amendment being the requirement of a mock up to be provided remotely for review by officers rather than on site.
-
P/2026/01754/DLBC Awaiting decision
Fulham Gas Works Imperial Road London
Details of paint finishes, in compliance with Condition 3 of Listed Building consent 2025/00568/LBC dated 23 July 2026.
-
P/2026/01473/DET Granted
Fulham Gas Works Imperial Road London
Details to discharge Condition 20 (Verification Report) for Phases 3b, 3c and 3d (Development Plots E1 and E2) pursuant to Planning Permission (ref: 2018/02100/COMB) dated 8 February 2019 as varied by (ref: 2024/00961/VAR dated 23 December 2024).
-
P/2026/01890/VAR Awaiting decision
Fulham Gas Works Imperial Road London
Variation of Condition 1 (Drawings) of reserved matters details relating to the approval of access; appearance; landscaping; layout and scale in respect of Phases 4b, 4c and 4d (Development Plots H1 and H2); for the erection of two buildings comprising residential and non-residential floorspace with associated landscaping approved under 2024/01420/RES granted 17 January 2025 of planning permission 2018/02100/COMB granted 8 February 2019 (as amended by refs 2020/01088/NMAT and 2024/00818/NMAT). As varied by 2024/00961/VAR variation of Condition 4 (Drawings) and Condition 5 (Design Codes and Parameter Plans) of planning permission 2018/02100/COMB granted 8 Feb 2019 (as amended by refs 2020/01088/NMAT and 2024/00818/NMAT). The proposed amendments to Phase 4b Development Plot H1 comprise: (a) revisions to tower and shoulder terrace heights within consented maximum parameter heights (comprising an increase in shoulder height and reduction in tower height); (b) changes to the arrangemen... read more
-
P/2026/01214/DET Awaiting decision
Fulham Gas Works Imperial Road London
Details to discharge Condition 16 (Preliminary Risk Assessment) for Development Phases 3a, 4a, 5a, 5b and 6 pursuant to Planning Permission (ref: 2018/02100/COMB) dated 8 February 2019 as varied by (ref: 2024/00961/VAR dated 23 December 2024).
-
P/2026/01024/DET Awaiting decision
Fulham Gas Works Imperial Road London
Details to discharge Condition 87 (Materials) for development Development Plot H1 (Phase 4b) pursuant to Planning Permission (ref: 2018/02100/COMB) dated 8 February 2019 as varied by (ref: 2024/00961/VAR dated 23 December 2024).
-
P/2026/01008/DET Awaiting decision
Fulham Gas Works,Imperial Road,London
Details to discharge Condition 74 (1:20 details) for development Development Plot H1 (Phase 4b) pursuant to Planning Permission (ref: 2018/02100/COMB) dated 8 February 2019 as varied by (ref: 2024/00961/VAR dated 23 December 2024)
-
P/2026/01009/DET Awaiting decision
Fulham Gas Works Imperial Road London
Details to discharge Condition 89 (Secured by Design - Ground Level) for development Development Plot H1 (Phase 4b) pursuant to Planning Permission (ref: 2018/02100/COMB) dated 8 February 2019 as varied by (ref: 2024/00961/VAR dated 23 December 2024).
-
P/2026/00946/DET Granted
Fulham Gas Works Imperial Road London
Details to discharge Condition 88 (Secure by Design (Basement)) and Condition 89 (Secure By Design (Above Ground)) for development Development Plot E2 (Phase 3cd) pursuant to Planning Permission (ref: 2018/02100/COMB) dated 8 February 2019 as varied by (ref: 2024/00961/VAR dated 23 December 2024).
Timeline
Dates from the published record
-
27 Apr 2026
Received by Hammersmith and Fulham
-
1 May 2026
Validated
Checked as complete and ready for consideration.
-
3 Jul 2026
Decision issued: APPLICATION APPROVED
-
24 Jul 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
11 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat this grant of permission means
Hammersmith and Fulham granted permission on 3 July 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About advertisement consent applications
Advertisement consent is judged on two things only: amenity and public safety, not competition or other planning considerations. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
Fulham Gas Works Imperial Road London
Details to discharge Condition 88 (Secure by Design (Basement)) and Condition 89 (Secure By Design (Above Ground)) for development Development Plot E2 (Phase 3cd) pursuant to Planning Permission (ref: 2018/02100/COMB) dated 8 February 2019 as varied by (ref: 2024/00961/VAR dated 23 December 2024).
Granted Conditions 6 docs -
Fulham Gas Works Imperial Road London
Details to discharge Condition 20 (Verification Report) for Phases 3b, 3c and 3d (Development Plots E1 and E2) pursuant to Planning Permission (ref: 2018/02100/COMB) dated 8 February 2019 as varied by (ref: 2024/00961/VAR dated 23 December 2024).
Granted Conditions 12 docs -
Fulham Gas Works Imperial Road London
95% historically approved · decision due ~7 Jul
Details to discharge Condition 16 (Preliminary Risk Assessment) for Development Phases 3a, 4a, 5a, 5b and 6 pursuant to Planning Permission (ref: 2018/02100/COMB) dated 8 February 2019 as varied by (ref: 2024/00961/VAR dated 23 December 2024).
Awaiting decision Conditions 6 docs -
Fulham Gas Works Imperial Road London
95% historically approved · decision due ~26 May
Details to discharge Condition 40 (Microclimate) for development Development Plot H1 (Phase 4b) pursuant to Planning Permission (ref: 2018/02100/COMB) dated 8 February 2019 as varied by (ref: 2024/00961/VAR dated 23 December 2024).
Awaiting decision Conditions 4 docs -
Fulham Gas Works Imperial Road London
95% historically approved · decision due ~27 May
Details to discharge Condition 73 (a&b), 1:1 details and materials for development Development Plot H1 (Phase 4b) pursuant to Planning Permission (ref: 2018/02100/COMB) dated 8 February 2019 as varied by (ref: 2024/00961/VAR dated 23 December 2024).
Awaiting decision Conditions 2 docs -
Fulham Gas Works Imperial Road London
95% historically approved · decision due ~27 May
Details to discharge Condition 82 (Roof Enclosures) for development Development Plot H1 (Phase 4b) pursuant to Planning Permission (ref: 2018/02100/COMB) dated 8 February 2019 as varied by (ref: 2024/00961/VAR dated 23 December 2024).
Awaiting decision Conditions 2 docs
Other advertisement consent applications
In Hammersmith and Fulham
-
P/2026/01087/ADV Granted
Fulham Town Hall 553- 561 Fulham Road London SW6 1ER
Display of an externally illuminated shroud advertisement screen onto the proposed scaffold to Fulham Road elevation of the building measuring 7m (Height) x 10m (Width) for a temporary period of 18 months.
-
P/2026/01631/ADV Granted
Ground Floor, 72 Uxbridge Road, London, W12 8LP
Display of 1no. double sided internally illuminated projecting box sign, to the front elevation of existing shopfront.
-
P/2026/01126/ADV Granted
Queen Adelaide, 412 Uxbridge Road, London, W12 0NR
Replacement of existing projecting sign with new double sided externally illuminated projecting sign to southern elevation of the building; re-lamping of 3 lanterns.
-
P/2026/01671/ADV Granted
184 Uxbridge Road, London, W12 7JP
Display of 1no. non-illuminated lettering fascia sign, and 1no. non-illuminated logo sign applied to the glazing to the front elevation fronting Hopgood Street.
-
2025/03051/ADV Withdrawn
Pavement Outside 1B Shepherd's Bush Road London W6 7NA
Display of an internally illuminated digital LED screen to one side of a new free standing multifunctional hub unit, showing static and animated displays in sequence comprising commercial and community messages.