Skip to content
PlanIndex Get alerts
Menu

Planning application

Fulham Gas Works Imperial Road London

Granted Hammersmith and Fulham P/2026/01125/ADV Advertisement

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Display of 1no. internally illuminated fascia sign and 2no. non-illuminated projecting signs to Unit 4a, phase 1

As published by the council, reference P/2026/01125/ADV

Application record

Reference
P/2026/01125/ADV
Type
Advertisement
Status
Decided: APPLICATION APPROVED
Decision
APPLICATION APPROVED
Received
27 Apr 2026
Validated
1 May 2026
Decided
3 Jul 2026
Ward
Parsons Green And Sandford

Site history

Applications at this address on the Hammersmith and Fulham register

This site has had 109 applications since 2020: 31 approved, 0 refused.

  • P/2026/02015/DET Awaiting decision

    Fulham Gas Works Imperial Road London

    Details to discharge Condition 62 (Road Safety Audit) for Plot H1 (Phase 4b) pursuant to Planning Permission (ref: 2018/02100/COMB) dated 8 February 2019 as varied by (ref: 2024/00961/VAR dated 23 December 2024).

    Submitted 5 Aug 2026 Conditions
  • P/2026/01772/NMAT Awaiting decision

    Fulham Gas Works,Imperial Road,London

    Non-Material Amendment to Planning Permission (ref: 2018/02100/COMB ) dated 8 February 2019 (as amended by ref: 2024/00961/VAR dated 3 December 2024), in respect of Condition 73 (details and materials). The proposed amendment being the requirement of a mock up to be provided remotely for review by officers rather than on site.

    Submitted 13 Jul 2026 Amendments
  • P/2026/01754/DLBC Awaiting decision

    Fulham Gas Works Imperial Road London

    Details of paint finishes, in compliance with Condition 3 of Listed Building consent 2025/00568/LBC dated 23 July 2026.

    Submitted 10 Jul 2026 Conditions
  • Fulham Gas Works Imperial Road London

    Details to discharge Condition 20 (Verification Report) for Phases 3b, 3c and 3d (Development Plots E1 and E2) pursuant to Planning Permission (ref: 2018/02100/COMB) dated 8 February 2019 as varied by (ref: 2024/00961/VAR dated 23 December 2024).

    Decided 21 Jul 2026 Conditions
  • P/2026/01890/VAR Awaiting decision

    Fulham Gas Works Imperial Road London

    Variation of Condition 1 (Drawings) of reserved matters details relating to the approval of access; appearance; landscaping; layout and scale in respect of Phases 4b, 4c and 4d (Development Plots H1 and H2); for the erection of two buildings comprising residential and non-residential floorspace with associated landscaping approved under 2024/01420/RES granted 17 January 2025 of planning permission 2018/02100/COMB granted 8 February 2019 (as amended by refs 2020/01088/NMAT and 2024/00818/NMAT). As varied by 2024/00961/VAR variation of Condition 4 (Drawings) and Condition 5 (Design Codes and Parameter Plans) of planning permission 2018/02100/COMB granted 8 Feb 2019 (as amended by refs 2020/01088/NMAT and 2024/00818/NMAT). The proposed amendments to Phase 4b Development Plot H1 comprise: (a) revisions to tower and shoulder terrace heights within consented maximum parameter heights (comprising an increase in shoulder height and reduction in tower height); (b) changes to the arrangemen... read more

    Submitted 15 May 2026 Amendments
  • P/2026/01214/DET Awaiting decision

    Fulham Gas Works Imperial Road London

    Details to discharge Condition 16 (Preliminary Risk Assessment) for Development Phases 3a, 4a, 5a, 5b and 6 pursuant to Planning Permission (ref: 2018/02100/COMB) dated 8 February 2019 as varied by (ref: 2024/00961/VAR dated 23 December 2024).

    Submitted 6 May 2026 Conditions
  • P/2026/01024/DET Awaiting decision

    Fulham Gas Works Imperial Road London

    Details to discharge Condition 87 (Materials) for development Development Plot H1 (Phase 4b) pursuant to Planning Permission (ref: 2018/02100/COMB) dated 8 February 2019 as varied by (ref: 2024/00961/VAR dated 23 December 2024).

    Submitted 16 Apr 2026 Conditions
  • P/2026/01008/DET Awaiting decision

    Fulham Gas Works,Imperial Road,London

    Details to discharge Condition 74 (1:20 details) for development Development Plot H1 (Phase 4b) pursuant to Planning Permission (ref: 2018/02100/COMB) dated 8 February 2019 as varied by (ref: 2024/00961/VAR dated 23 December 2024)

    Submitted 14 Apr 2026 Conditions
  • P/2026/01009/DET Awaiting decision

    Fulham Gas Works Imperial Road London

    Details to discharge Condition 89 (Secured by Design - Ground Level) for development Development Plot H1 (Phase 4b) pursuant to Planning Permission (ref: 2018/02100/COMB) dated 8 February 2019 as varied by (ref: 2024/00961/VAR dated 23 December 2024).

    Submitted 14 Apr 2026 Conditions
  • Fulham Gas Works Imperial Road London

    Details to discharge Condition 88 (Secure by Design (Basement)) and Condition 89 (Secure By Design (Above Ground)) for development Development Plot E2 (Phase 3cd) pursuant to Planning Permission (ref: 2018/02100/COMB) dated 8 February 2019 as varied by (ref: 2024/00961/VAR dated 23 December 2024).

    Decided 20 May 2026 Conditions

Timeline

Dates from the published record

  1. 27 Apr 2026

    Received by Hammersmith and Fulham

  2. 1 May 2026

    Validated

    Checked as complete and ready for consideration.

  3. 3 Jul 2026

    Decision issued: APPLICATION APPROVED

  4. 24 Jul 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

11 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What this grant of permission means

Hammersmith and Fulham granted permission on 3 July 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About advertisement consent applications

Advertisement consent is judged on two things only: amenity and public safety, not competition or other planning considerations. More in our guide to planning application types.

Nearby applications

Within 500 metres

  • Fulham Gas Works Imperial Road London

    P/2026/00946/DET Submitted 8 Apr 2026 0m away

    Details to discharge Condition 88 (Secure by Design (Basement)) and Condition 89 (Secure By Design (Above Ground)) for development Development Plot E2 (Phase 3cd) pursuant to Planning Permission (ref: 2018/02100/COMB) dated 8 February 2019 as varied by (ref: 2024/00961/VAR dated 23 December 2024).

    Granted Conditions 6 docs
  • Fulham Gas Works Imperial Road London

    P/2026/01473/DET Submitted 9 Jun 2026 0m away

    Details to discharge Condition 20 (Verification Report) for Phases 3b, 3c and 3d (Development Plots E1 and E2) pursuant to Planning Permission (ref: 2018/02100/COMB) dated 8 February 2019 as varied by (ref: 2024/00961/VAR dated 23 December 2024).

    Granted Conditions 12 docs
  • Fulham Gas Works Imperial Road London

    P/2026/01214/DET Submitted 6 May 2026 0m away

    95% historically approved · decision due ~7 Jul

    Details to discharge Condition 16 (Preliminary Risk Assessment) for Development Phases 3a, 4a, 5a, 5b and 6 pursuant to Planning Permission (ref: 2018/02100/COMB) dated 8 February 2019 as varied by (ref: 2024/00961/VAR dated 23 December 2024).

    Awaiting decision Conditions 6 docs
  • Fulham Gas Works Imperial Road London

    P/2026/00871/DET Submitted 27 Mar 2026 0m away

    95% historically approved · decision due ~26 May

    Details to discharge Condition 40 (Microclimate) for development Development Plot H1 (Phase 4b) pursuant to Planning Permission (ref: 2018/02100/COMB) dated 8 February 2019 as varied by (ref: 2024/00961/VAR dated 23 December 2024).

    Awaiting decision Conditions 4 docs
  • Fulham Gas Works Imperial Road London

    P/2026/00870/DET Submitted 27 Mar 2026 0m away

    95% historically approved · decision due ~27 May

    Details to discharge Condition 73 (a&b), 1:1 details and materials for development Development Plot H1 (Phase 4b) pursuant to Planning Permission (ref: 2018/02100/COMB) dated 8 February 2019 as varied by (ref: 2024/00961/VAR dated 23 December 2024).

    Awaiting decision Conditions 2 docs
  • Fulham Gas Works Imperial Road London

    P/2026/00869/DET Submitted 27 Mar 2026 0m away

    95% historically approved · decision due ~27 May

    Details to discharge Condition 82 (Roof Enclosures) for development Development Plot H1 (Phase 4b) pursuant to Planning Permission (ref: 2018/02100/COMB) dated 8 February 2019 as varied by (ref: 2024/00961/VAR dated 23 December 2024).

    Awaiting decision Conditions 2 docs

In Hammersmith and Fulham

  • Fulham Town Hall 553- 561 Fulham Road London SW6 1ER

    Display of an externally illuminated shroud advertisement screen onto the proposed scaffold to Fulham Road elevation of the building measuring 7m (Height) x 10m (Width) for a temporary period of 18 months.

    22 Apr 2026 Advertising
  • Ground Floor, 72 Uxbridge Road, London, W12 8LP

    Display of 1no. double sided internally illuminated projecting box sign, to the front elevation of existing shopfront.

    26 Jun 2026 Advertising
  • Queen Adelaide, 412 Uxbridge Road, London, W12 0NR

    Replacement of existing projecting sign with new double sided externally illuminated projecting sign to southern elevation of the building; re-lamping of 3 lanterns.

    27 Apr 2026 Advertising
  • 184 Uxbridge Road, London, W12 7JP

    Display of 1no. non-illuminated lettering fascia sign, and 1no. non-illuminated logo sign applied to the glazing to the front elevation fronting Hopgood Street.

    1 Jul 2026 Advertising
  • 2025/03051/ADV Withdrawn

    Pavement Outside 1B Shepherd's Bush Road London W6 7NA

    Display of an internally illuminated digital LED screen to one side of a new free standing multifunctional hub unit, showing static and animated displays in sequence comprising commercial and community messages.

    31 Oct 2025 Advertising