Planning application
Fulham Gas Works Imperial Road London
Works: Demolition
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Non-Material Amendment to Planning Permission (ref: 2018/02100/COMB) dated 8 February 2019 (as amended by ref: 2024/00961/VAR dated 3 December 2024), in respect of the description of development to change it from "Planning Application (part-detailed, part-outline) for demolition of existing buildings and structures (excl. No.2 Gasholder, 1856 Chief Engineer's Office, 1927 Research Laboratory, 1920 WWI War Memorial and WW2 War Memorial) and redevelopment to provide a residential-led mixed use development comprising the erection of new buildings" to "Planning Application (part-detailed, part-outline) for demolition of selected existing buildings and structures and redevelopment to provide a residential-led mixed use development comprising the erection of new buildings", specifically allowing the insertion of "selected" and the deletion of "(excl. No.2 Gasholder, 1856 Chief Engineer's Office, 1927 Research Laboratory, 1920 WWI War Memorial and WW2 War Memorial)"
As published by the council, reference P/2026/02356/NMAT
Application record
- Reference
- P/2026/02356/NMAT
- Type
- Non-Material Amendment Submission
- Status
- Pending As published: REGISTERED: Under Consultation
- Received
- 11 Sep 2026
- Validated
- 24 Sep 2026
- Ward
- Parsons Green And Sandford|Sands End
Site history
Applications at this address on the Hammersmith and Fulham register
This site has had 118 applications since 2017: 39 approved, 0 refused.
-
P/2026/02015/DET Awaiting decision
Fulham Gas Works Imperial Road London
Details to discharge Condition 62 (Road Safety Audit) for Plot H1 (Phase 4b) pursuant to Planning Permission (ref: 2018/02100/COMB) dated 8 February 2019 as varied by (ref: 2024/00961/VAR dated 23 December 2024).
-
P/2026/01772/NMAT Awaiting decision
Fulham Gas Works,Imperial Road,London
Non-Material Amendment to Planning Permission (ref: 2018/02100/COMB ) dated 8 February 2019 (as amended by ref: 2024/00961/VAR dated 3 December 2024), in respect of Condition 73 (details and materials). The proposed amendment being the requirement of a mock up to be provided remotely for review by officers rather than on site.
-
P/2026/01754/DLBC Granted
Fulham Gas Works Imperial Road London
Details of paint finishes, in compliance with Condition 3 of Listed Building Consent (ref: 2025/00568/LBC) dated 23 July 2026.
-
P/2026/01473/DET Granted
Fulham Gas Works Imperial Road London
Details to discharge Condition 20 (Verification Report) for Phases 3b, 3c and 3d (Development Plots E1 and E2) pursuant to Planning Permission (ref: 2018/02100/COMB) dated 8 February 2019 as varied by (ref: 2024/00961/VAR dated 23 December 2024).
-
P/2026/01890/VAR Awaiting decision
Fulham Gas Works Imperial Road London
Variation of Condition 1 (Drawings) of reserved matters details relating to the approval of access; appearance; landscaping; layout and scale in respect of Phases 4b, 4c and 4d (Development Plots H1 and H2); for the erection of two buildings comprising residential and non-residential floorspace with associated landscaping approved under 2024/01420/RES granted 17 January 2025 of planning permission 2018/02100/COMB granted 8 February 2019 (as amended by refs 2020/01088/NMAT and 2024/00818/NMAT). As varied by 2024/00961/VAR variation of Condition 4 (Drawings) and Condition 5 (Design Codes and Parameter Plans) of planning permission 2018/02100/COMB granted 8 Feb 2019 (as amended by refs 2020/01088/NMAT and 2024/00818/NMAT). The proposed amendments to Phase 4b Development Plot H1 comprise: (a) revisions to tower and shoulder terrace heights within consented maximum parameter heights (comprising an increase in shoulder height and reduction in tower height); (b) changes to the arrangemen... read more
-
P/2026/01214/DET Awaiting decision
Fulham Gas Works Imperial Road London
Details to discharge Condition 16 (Preliminary Risk Assessment) for Development Phases 3a, 4a, 5a, 5b and 6 pursuant to Planning Permission (ref: 2018/02100/COMB) dated 8 February 2019 as varied by (ref: 2024/00961/VAR dated 23 December 2024).
-
P/2026/01125/ADV Granted
Fulham Gas Works Imperial Road London
Display of 1no. internally illuminated fascia sign and 2no. non-illuminated projecting signs to Unit 4a, phase 1
-
P/2026/01024/DET Awaiting decision
Fulham Gas Works Imperial Road London
Details to discharge Condition 87 (Materials) for development Development Plot H1 (Phase 4b) pursuant to Planning Permission (ref: 2018/02100/COMB) dated 8 February 2019 as varied by (ref: 2024/00961/VAR dated 23 December 2024).
-
P/2026/01008/DET Awaiting decision
Fulham Gas Works,Imperial Road,London
Details to discharge Condition 74 (1:20 details) for development Development Plot H1 (Phase 4b) pursuant to Planning Permission (ref: 2018/02100/COMB) dated 8 February 2019 as varied by (ref: 2024/00961/VAR dated 23 December 2024)
-
P/2026/01009/DET Awaiting decision
Fulham Gas Works Imperial Road London
Details to discharge Condition 89 (Secured by Design - Ground Level) for development Development Plot H1 (Phase 4b) pursuant to Planning Permission (ref: 2018/02100/COMB) dated 8 February 2019 as varied by (ref: 2024/00961/VAR dated 23 December 2024).
Timeline
Dates from the published record
-
11 Sep 2026
Received by Hammersmith and Fulham
-
24 Sep 2026
Validated
Checked as complete and ready for consideration.
-
1 Oct 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 19 November 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Hammersmith and Fulham took a median of 80 days over the applications it decided in the last year.
Documents
Plans, drawings, consultee responses and the officer's report
4 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat happens while it is decided
This application is with Hammersmith and Fulham for determination, against a statutory target of eight weeks. Over the last year Hammersmith and Fulham decided amendment applications in a median of 61 days. More in our guide to how long planning decisions take.
About amendment applications
An amendment application makes limited changes to a permission that already exists; anything beyond modest adjustment needs a fresh application. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Fulham Gas Works Imperial Road London
Works to Gasholder No.2 comprising: (i) bell and tank wall stabilisation works including concrete pours; (ii) the recording of the existing structure, the dismantling and off-site refurbishment and restoration of part of the existing structure, (iii) the permanent removal of roof sheeting, metal tank walls and infilling of existing void, (iv) the incorporation of replacement components where the original components are degraded beyond repair, and (v) the repainting and erection of the restored and replacement components of the gasholder in a new configuration with required alterations to facilitate the use of the salvaged elements of the gasholder as an integrated feature of the wider landscaped park, including introduction of a water feature and new seating and other associated works.
Granted Full applications 73 docs -
Gas Holder Imperial Road, London
Details to discharge Condition 105 (Gasholder No.2 Proposals) of Planning Permission (ref. 2018/02100/COMB) dated 8 February 2019 (as amended by 2024/00961/VAR dated 3 December 2024).
Granted Conditions 51 docs -
Fulham Gas Works Imperial Road London
95% historically approved · decision due ~12 Mar
Details to discharge Condition 73 (Details and Materials); Condition 74 (1:20 details) in relation to Phases 3e, 3f of Development Plots G1 of Planning Permission 2018/02100/COMB dated 8 February 2019 (as amended by 2024/00961/VAR dated 3 December 2024).
Awaiting decision Conditions 4 docs -
Fulham Gas Works Imperial Road London
95% historically approved · decision due ~17 Mar
Details to discharge Condition 3 (Method Statement) and Condition 4 (External Materials) of Listed Building Consent 2023/01147/LBC dated 30 May 2024.
Awaiting decision Conditions 3 docs -
Fulham Gas Works Imperial Road London
95% historically approved · decision due ~12 Mar
Details to discharge Condition 82 (Roof Enclosure) in relation to Phases 3e, 3f of Development Plots G1 of Planning Permission 2018/02100/COMB dated 8 February 2019 (as amended by 2024/00961/VAR dated 3 December 2024).
Awaiting decision Conditions 3 docs -
Fulham Gas Works Imperial Road London
Details to discharge Condition 88 (Secure by Design (Basement)) and Condition 89 (Secure By Design (Above Ground)) for development Development Plot E1 (Phase 3b) pursuant to Planning Permission (ref: 2018/02100/COMB) dated 8 February 2019 as varied by (ref: 2024/00961/VAR dated 23 December 2024). KRP - Phase 3 - Block E1 - Planning Note C88 and C89
Granted Conditions 6 docs
Other amendment applications
In Hammersmith and Fulham
-
P/2026/02232/NMAT Granted
30 Davisville Road, London, W12 9SJ
Non-material amendment to planning permission reference: 2018/03932/FUL dated 28 May 2019 for the Erection of a rear roof extension; erection of rear extensions at ground, first and second floor level; excavation of the front and rear garden to form lightwells in connection with the enlargement of the existing basement; installation of 1no rooflight in the front roofslope; conversion of the existing building into 1 x 3 bedroom and 2 x 2 bedroom self-contained flats. Amendments sought to the repositioning and increased number of kitchen rooflights, and internal alterations to the basement, ground and top floor.
-
P/2026/02553/NMAT Awaiting decision
M&S White City Site 54 Wood Lane London W12 7RQ
Non-material amendment to vary Condition 2 (Drawings) of planning permission ref. 2024/02570/FUL granted on 1 April 2026 for: Erection of a 30-storey building (plus plant) with single storey basement for residential (C3) use with ancillary uses at the ground floor level and including associated landscaping, access, car and cycle parking and other engineering works. The amendments relate to changes to: reconfiguration of the ground floor and basement layouts; an increase to the GEA of ancillary residential (non-residential) floorspace at ground level (7sqm) and basement level (61sqm); landscape amendments including an enlarged water feature and larger terraces; minor adjustments to the access and servicing strategy; and ground floor façade and fenestration amendments.
-
P/2026/02544/NMAT Awaiting decision
260 - 262 North End Road, London, SW6 1NJ
Non-material amendment to planning permission ref: 2022/03651/FUL granted 11th June 2025 for the 'Demolition of existing buildings at 260-262 North End Road; erection of a replacement part one, part three, part four storey, part five storey building comprising of one retail unit (Class E(a)), 394sqm office floorspace (Class E(g)) and 9 self-contained residential units (Class C3)' to allow amendments to the approved drawings to include: alterations to the main residential stair core to accommodate an evacuation lift, reconfiguration of access to the flats to enable the installation of a single smoke ventilated corridor at each floor level, increasing the size of the plantroom, re-configuration of the ground floor, re-configuration of Flat 5, increasing the size of the studio flats and external walls have been set out to brick dimensions.
-
P/2026/01868/VAR Granted
4 Goldhawk Mews, London, W12 8PA
Removal of conditions 2, 3 and 4 (parking permits) of planning application ref: 2014/05430/PD56 granted 7th January 2015 for the 'Change of use of the property from office (Class B1) into a single family dwellinghouse (Class C3)'.
-
P/2026/02497/VAR Awaiting decision
4 Southerton Road, London, W6 0PH
Removal of condition 11 of planning permission ref: 1988/01014/FUL granted 1st August 1988 for the 'Erection of a replacement rear extension at first floor level and conversion to use as two cluster flats each providing three bedsitting rooms with communal facilities'.