Skip to content
PlanIndex Get alerts
Menu

Planning application

Fulham Gasworks Imperial Road London

Granted Hammersmith and Fulham 2019/00755/RES Submission of Reserved Matters

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Reserved Matters Application (access, appearance, landscaping, layout and scale) in respect of Phase 2a (Development Plot B1) for the erection of a single storey pavilion-style building comprising 205sqm of flexible floorspace (Use Classes A1, A2, A3, A4 and B1) with associated landscaping pursuant to planning application 2018/02100/COMB granted 8 February 2019 (comprehensive residential led mixed use redevelopment of the former Gasworks Site).

As published by the council, reference 2019/00755/RES

Application record

Reference
2019/00755/RES
Type
Submission of Reserved Matters
Status
Application Approved
Decision
Application Approved
Received
14 Mar 2019
Validated
14 Mar 2019
Decided
3 Jul 2019
Ward
Parsons Green And Walham
Decision by
Delegated Decision

Site history

Applications at this address on the Hammersmith and Fulham register

This site has had 24 applications since 2019: 15 approved, 0 refused.

  • 2020/01850/DET Awaiting decision

    Fulham Gasworks Imperial Road London

    Details of temporary fencing and/or enclosure, in compliance with Condition 8 of planning permission (ref. 2018/02100/COMB) dated 8 February 2019.

    Submitted 20 Jul 2020 Conditions
  • 2020/01185/ADV Awaiting decision

    Fulham Gasworks Imperial Road London

    Display of externally illuminated advertisement on dibond panels; affixed to hoardings along Michael Road, Sands End Lane.

    Submitted 12 May 2020 Advertising
  • 2020/01088/NMAT Awaiting decision

    Fulham Gasworks Imperial Road London

    Non-material amendment to permission 2018/02100/COMB, 8 Feb 2019, to remove figures / unit numbers from description; amend ground floor of Phases 1a 1b 1c; amend Condition 10 (Floorspace) to increase ancillary residential by 1,622 sqm to 3,420 sqm and reduce D1/D2 use by 1,622 sqm to 2,710 sqm. Planning Application for demolition of existing buildings and structures (excluding No.2 Gasholder, 1856 Chief Engineer's Office, 1927 Former Research Laboratory, 1920 WW1 War Memorial and WW2 War Memorial) and redevelopment to provide a residential-led mixed use development comprising the erection of new buildings ranging from 1 to 37 storeys to provide residential units and ancillary residential facilities (C3 Use) and non-residential floorspace in Use Classes A1, A2, A3, A4, B1, D1 and D2, the provision of a new publicly accessible open space, new pedestrian and vehicle routes, accesses and amenity areas, basement level car park with integral servicing areas, interim works and other associated works: 1) Detailed planning application for residential floorspace together with ancillary residential facilities (C3 Use); flexible commercial floorspace (A1, A2, A3, A4 Uses); community and leisure floorspace (D1/D2 Use); provision of a basement; new pedestrian and vehicular access; provision of amenity space, landscaping, car/cycle parking, refuse storage, energy centre, servicing area, and other associated infrastructure works.2) Outline planning application (with all matters reserved) for residential floorspace and ancillary residential facilities (C3 Use); non-residential floorspace comprising flexible commercial retail (A1, A2, A3, A4 Uses), office (B1 Use), community (D1 Use) and leisure (D2 Use) floorspace; provision of new basement level; new pedestrian and vehicular access; and associated amenity space, publicly accessible open space, landscaping, car/cycle parking, refuse storage, energy centres, servicing area, and other associated infrastructure works.

    Submitted 30 Apr 2020 Amendments
  • 2020/00523/DET Awaiting decision

    Fulham Gasworks Imperial Road London

    Details of green infrastructure - air quality, in compliance with condition 46 in relation to Development Plots A1, A2, and A3 (Phases 1a, 1b, and 1c) of planning permission 2018/02100/COMB dated 8 Febraury 2019.

    Submitted 21 Feb 2020 Conditions
  • 2020/00524/DET Awaiting decision

    Fulham Gasworks Imperial Road London

    Details to discharge condition 33 (green/brown/blue roofs); condition 61 (roads, footways, footpaths and cycleways); condition 81 (urban greening strategy); condition 90 (floodlights, security lights and decorative external lights); condition 92 (soft and hard landscaping); condition 96 (outdoor play spaces) and condition 102 (urban realm strategy) in relation to Development Plots A1, A2, and A3 (Phases 1a, 1b, and 1c) of planning permission 2018/02100/COMB dated 8 February 2019.

    Submitted 21 Feb 2020 Conditions
  • 2020/00525/DET Awaiting decision

    Fulham Gasworks Imperial Road London

    Details of ventilation strategy, in compliance with condition 42 (a) & (b); details of combustion plant, in compliance with condition 45 (a) & (b) in relation to Development Plots A1, A2 & A3 (Phase 1a, 1b & 1c) of planning permission 2018/02100/COMB dated 8 February 2019.

    Submitted 21 Feb 2020 Conditions
  • 2020/00184/LBC Awaiting decision

    Fulham Gasworks Imperial Road London

    Proposed works to Gasholder No.2 (Grade II* listed) located within Phase 4a of planning permission 2018/02100/COMB granted 8 February 2019. Works would comprise of intrusive works to facilitate access to de-water, remove sludge, decontaminate, investigate, assess and record the condition of Gasholder No.2.

    Submitted 22 Jan 2020 Heritage and listed buildings
  • 2019/03747/DET Awaiting decision

    Fulham Gasworks Imperial Road London

    Details of Intrusive Condition Survey Methodology, in compliance with condition 104 dated 8 February 2019.

    Submitted 17 Dec 2019 Conditions
  • 2019/02313/DET Awaiting decision

    Fulham Gasworks Imperial Road London

    Details of Air Quality Assessment, in compliance with condition 41 of planning permission 2018/02100/COMB dated 8th February 2019.

    Submitted 2 Aug 2019 Conditions
  • 2019/01792/DET Granted

    Fulham Gasworks Imperial Road London

    Details to partially discharge Conditions 18 (Detailed Quantitative Risk Assessment Report) and 19 (Remediation Method Statement) to allow Enabling Works as defined by this application for Phases 1a, 1b, 1c and 2a of planning permission (ref: 2018/02100/COMB) dated 8 February 2019.Enabling Works for this application is limited to building foundation removal (Phases 1a, 1b, 1c); installation of attenuation tank (Phases 1a, 1b, 1c); ground levelling (Phases 1a, 1b, 1c); excavations for the placement of piling mats (Phases 1a, 1b, 1c, 2a); piling (Phases 1a, 1b, 1c, 2a); landscaping (Phase 2a) and remediation of contamination encountered during these works. The works do not include the main excavation of Phases 1a, 1b and 1c basement.

    Decided 9 Sep 2019 Conditions

Timeline

Dates from the published record

  1. 14 Mar 2019

    Received by Hammersmith and Fulham

  2. 3 Jul 2019

    Decision issued: Application Approved

  3. 11 Sep 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Quod Ltd Agent

959 applications on PlanIndex · across 130 councils · 97% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

31 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What this grant of permission means

Hammersmith and Fulham granted permission on 3 July 2019, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About reserved matters applications

A reserved matters application fills in the detail held back from an earlier outline permission, judged against that permission rather than the principle of development. More in our guide to planning application types.

Nearby applications

Within 500 metres

  • Fulham Gas Works Imperial Road London

    2020/03251/DET Submitted 7 Dec 2020 0m away

    Details to construct a single storey temporary show apartment within Phase 1b (Development Plot A3) for a period of 18 months; in compliance with Condition 11 (Temporary Land Uses) of planning permission (ref: 2018/02100/COMB) dated 8 February 2019.

    Granted Conditions 8 docs
    Small domestic
  • Fulham Gas Works Imperial Road London

    2021/00320/DET Submitted 1 Feb 2021 0m away

    95% historically approved · decision due ~30 Mar

    Details to discharge conditions 74 (1:20 Details) and condition 75 (A1/A3 1:20 Details) of planning permission 2018/02100/COMB dated

    Awaiting decision Conditions 14 docs
  • 30 - 32 Bradmore Park Road London W6 0DT

    2019/00715/DET Submitted 11 Mar 2019 0m away

    Details of demolition notice, in compliance with condition 3 of planning permission (ref: 2017/03836/FUL) dated 22nd December 2017.

    Granted Conditions Demolition 13 docs
  • Fulham Gasworks Imperial Road London

    2019/02313/DET Submitted 2 Aug 2019 0m away

    95% historically approved · decision due ~30 Sep

    Details of Air Quality Assessment, in compliance with condition 41 of planning permission 2018/02100/COMB dated 8th February 2019.

    Awaiting decision Conditions 5 docs
  • Fulham Gas Works Imperial Road London

    2021/00210/DET Submitted 22 Jan 2021 0m away

    95% historically approved · decision due ~22 Mar

    Details to partially discharge condition 11 (Temporary land uses - Temporary Welfare Drawing Package), of planning permission 2018/02100/COMB dated 8 February 2019.

    Awaiting decision Conditions 4 docs
  • Fulham Gasworks Imperial Road London

    2019/01608/DET Submitted 27 May 2019 0m away

    Details to discharge Condition 27 (Flood Risk Assessment); Condition 28i (Outline Drainage Strategy); and Condition 32 (Site Wide Drainage Strategy) for all Phases; plus details to discharge Condition 28ii (Detailed Drainage Strategy) for Phases 1a, 1b, 1c and Phase 2a of planning permission 2018/02100/COMB dated 8 February 2019.

    Granted Conditions 20 docs

In Hammersmith and Fulham

  • 2025/03523/RES Granted

    Former Dairy Crest Site Land Beneath And Bounded By Westway And West London Railway Line And Adjoining 58 Wood Lane London W12

    Reserved Matters Application (seeking the approval of all reserved matters including access, appearance, landscaping, layout and scale) pursuant to the amended Outline Planning Permission (ref: 2025/02724/VAR dated 9 September 2026); for the development of Development Zone 3 South ('DZ3S'); comprising the construction of a ground plus 12 storeys (plus plant) building with terraces; comprising academic uses (former Use Class D1) and active uses (within former Use Class A and D); together with landscaping and associated works (part of a comprehensive mixed use redevelopment of the former industrial site).

    19 Dec 2025 Reserved matters
  • 2025/03506/RES Granted

    Former Dairy Crest Site Land Beneath And Bounded By Westway And West London Railway Line And Adjoining 58 Wood Lane London W12

    Reserved Matters Application (seeking the approval of all reserved matters including access, appearance, landscaping, layout, and scale) pursuant to to the amended outline planning permission (ref: 2025/02724/VAR) dated 9 September 2026; for the "Western Access Road" (part of a comprehensive mixed-use redevelopment of the former industrial site).

    17 Dec 2025 Reserved matters
  • P/2026/00805/RES Awaiting decision

    Fulham Gas Works Imperial Road London

    Reserved Matters Approval for access; appearance; landscaping; layout and scale in respect of Phases 5a and 5b (Development Plots F1 and F2); for the erection of two buildings comprising residential and non-residential floorspace in compliance with Condition 1 (Reserved Matters Details), Condition 4 (Outline Component Drawings) and Condition 5 (Design Codes, Development Specification and Parameter Plans); of hybrid planning permission (ref. 2024/00961/VAR dated 3 December 2024) (a comprehensive residential-led mixed use redevelopment of the former Fulham Gasworks Site).

    20 Mar 2026 Reserved matters
  • 2025/03393/RES Awaiting decision

    Former Dairy Crest Site Land Beneath And Bounded By Westway And West London Railway Line And Adjoining 58 Wood Lane London W12

    Reserved Matters Application (seeking the approval of all reserved matters including access, appearance, landscaping, layout, and scale) pursuant to Outline Planning Permission (ref. 2018/00267/OUT) dated 21 April 2021 (as amended by pending planning application ref: 2025/02724/VAR); for public realm and landscaping works to "Arrival Square" (part of a comprehensive mixed use redevelopment of the former industrial site).

    5 Dec 2025 Reserved matters
  • 2019/03563/RES Granted

    The Gateway Site White City Place 201 Wood Lane London W12

    Reserved Matters Application relating to the approval of access, appearance, layout, scale and landscaping in respect of Phase 1 (Gateway Central building), for the construction of a 12 storey building with basement comprising Retail (Class A1) and a Hair Dressing and Beauty Training Academy at ground floor level with Offices (B1 Use) above, together with landscaping and associated works; and approval of basement only in respect of Phase 2 (Gateway West building), all pursuant to condition 2 (Reserved Matters Details) of the outline element of planning permission (2016/04452/COMB) dated 26 March 2018, as revised by planning permission (2019/02792/VAR) dated 11 June 2020. This application also seeks to discharge conditions 12 (Retail Amalgamation), 29 (Sustainability), 30 (Energy Strategy) and 56 (Townscape and Visual Impact Assessment) in respect of Phase 1 (Gateway Central building) of the development.

    29 Nov 2019 Reserved matters