Fulham Gas Works Imperial Road London

Awaiting decision Hammersmith and Fulham P/2026/01214/DET Details to Meet Conditions Full/Outline

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Details to discharge Condition 16 (Preliminary Risk Assessment) for Development Phases 3a, 4a, 5a, 5b and 6 pursuant to Planning Permission (ref: 2018/02100/COMB) dated 8 February 2019 as varied by (ref: 2024/00961/VAR dated 23 December 2024).

As published by the council, reference P/2026/01214/DET

Application record

Reference
P/2026/01214/DET
Type
Details to Meet Conditions Full/Outline
Status
REGISTERED: Under Assessment
Received
6 May 2026
Validated
12 May 2026
Ward
Parsons Green And Sandford|Sands End

Site history

Applications at this address on the Hammersmith and Fulham register

This site has had 109 applications since 2020: 31 approved, 0 refused.

  • P/2026/02015/DET Awaiting decision

    Fulham Gas Works Imperial Road London

    Details to discharge Condition 62 (Road Safety Audit) for Plot H1 (Phase 4b) pursuant to Planning Permission (ref: 2018/02100/COMB) dated 8 February 2019 as varied by (ref: 2024/00961/VAR dated 23 December 2024).

    Submitted 5 Aug 2026 Conditions
  • P/2026/01772/NMAT Awaiting decision

    Fulham Gas Works,Imperial Road,London

    Non-Material Amendment to Planning Permission (ref: 2018/02100/COMB ) dated 8 February 2019 (as amended by ref: 2024/00961/VAR dated 3 December 2024), in respect of Condition 73 (details and materials). The proposed amendment being the requirement of a mock up to be provided remotely for review by officers rather than on site.

    Submitted 13 Jul 2026 Amendments
  • P/2026/01754/DLBC Awaiting decision

    Fulham Gas Works Imperial Road London

    Details of paint finishes, in compliance with Condition 3 of Listed Building consent 2025/00568/LBC dated 23 July 2026.

    Submitted 10 Jul 2026 Conditions
  • Fulham Gas Works Imperial Road London

    Details to discharge Condition 20 (Verification Report) for Phases 3b, 3c and 3d (Development Plots E1 and E2) pursuant to Planning Permission (ref: 2018/02100/COMB) dated 8 February 2019 as varied by (ref: 2024/00961/VAR dated 23 December 2024).

    Decided 21 Jul 2026 Conditions
  • P/2026/01890/VAR Awaiting decision

    Fulham Gas Works Imperial Road London

    Variation of Condition 1 (Drawings) of reserved matters details relating to the approval of access; appearance; landscaping; layout and scale in respect of Phases 4b, 4c and 4d (Development Plots H1 and H2); for the erection of two buildings comprising residential and non-residential floorspace with associated landscaping approved under 2024/01420/RES granted 17 January 2025 of planning permission 2018/02100/COMB granted 8 February 2019 (as amended by refs 2020/01088/NMAT and 2024/00818/NMAT). As varied by 2024/00961/VAR variation of Condition 4 (Drawings) and Condition 5 (Design Codes and Parameter Plans) of planning permission 2018/02100/COMB granted 8 Feb 2019 (as amended by refs 2020/01088/NMAT and 2024/00818/NMAT). The proposed amendments to Phase 4b Development Plot H1 comprise: (a) revisions to tower and shoulder terrace heights within consented maximum parameter heights (comprising an increase in shoulder height and reduction in tower height); (b) changes to the arrangemen... read more

    Submitted 15 May 2026 Amendments
  • Fulham Gas Works Imperial Road London

    Display of 1no. internally illuminated fascia sign and 2no. non-illuminated projecting signs to Unit 4a, phase 1

    Decided 3 Jul 2026 Advertising
  • P/2026/01024/DET Awaiting decision

    Fulham Gas Works Imperial Road London

    Details to discharge Condition 87 (Materials) for development Development Plot H1 (Phase 4b) pursuant to Planning Permission (ref: 2018/02100/COMB) dated 8 February 2019 as varied by (ref: 2024/00961/VAR dated 23 December 2024).

    Submitted 16 Apr 2026 Conditions
  • P/2026/01008/DET Awaiting decision

    Fulham Gas Works,Imperial Road,London

    Details to discharge Condition 74 (1:20 details) for development Development Plot H1 (Phase 4b) pursuant to Planning Permission (ref: 2018/02100/COMB) dated 8 February 2019 as varied by (ref: 2024/00961/VAR dated 23 December 2024)

    Submitted 14 Apr 2026 Conditions
  • P/2026/01009/DET Awaiting decision

    Fulham Gas Works Imperial Road London

    Details to discharge Condition 89 (Secured by Design - Ground Level) for development Development Plot H1 (Phase 4b) pursuant to Planning Permission (ref: 2018/02100/COMB) dated 8 February 2019 as varied by (ref: 2024/00961/VAR dated 23 December 2024).

    Submitted 14 Apr 2026 Conditions
  • Fulham Gas Works Imperial Road London

    Details to discharge Condition 88 (Secure by Design (Basement)) and Condition 89 (Secure By Design (Above Ground)) for development Development Plot E2 (Phase 3cd) pursuant to Planning Permission (ref: 2018/02100/COMB) dated 8 February 2019 as varied by (ref: 2024/00961/VAR dated 23 December 2024).

    Decided 20 May 2026 Conditions

Timeline

Dates from the published record

  1. 6 May 2026

    Received by Hammersmith and Fulham

  2. 12 May 2026

    Validated

    Checked as complete and ready for consideration.

  3. 24 Jul 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 7 July 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Hammersmith and Fulham took a median of 79 days over the applications it decided in the last year.

Documents

Plans, drawings, consultee responses and the officer's report

6 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What happens while it is decided

This application is with Hammersmith and Fulham for determination, against a statutory target of eight weeks. Over the last year Hammersmith and Fulham decided condition discharge and variation applications in a median of 81 days. More in our guide to how long planning decisions take.

About condition discharge and variation applications

This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.

Nearby applications

Within 500 metres

  • Fulham Gas Works Imperial Road London

    P/2026/00946/DET Submitted 8 Apr 2026 0m away

    Details to discharge Condition 88 (Secure by Design (Basement)) and Condition 89 (Secure By Design (Above Ground)) for development Development Plot E2 (Phase 3cd) pursuant to Planning Permission (ref: 2018/02100/COMB) dated 8 February 2019 as varied by (ref: 2024/00961/VAR dated 23 December 2024).

    Granted Conditions 6 docs
  • Fulham Gas Works Imperial Road London

    P/2026/01473/DET Submitted 9 Jun 2026 0m away

    Details to discharge Condition 20 (Verification Report) for Phases 3b, 3c and 3d (Development Plots E1 and E2) pursuant to Planning Permission (ref: 2018/02100/COMB) dated 8 February 2019 as varied by (ref: 2024/00961/VAR dated 23 December 2024).

    Granted Conditions 12 docs
  • Fulham Gas Works Imperial Road London

    P/2026/00871/DET Submitted 27 Mar 2026 0m away

    95% historically approved · decision due ~26 May

    Details to discharge Condition 40 (Microclimate) for development Development Plot H1 (Phase 4b) pursuant to Planning Permission (ref: 2018/02100/COMB) dated 8 February 2019 as varied by (ref: 2024/00961/VAR dated 23 December 2024).

    Awaiting decision Conditions 4 docs
  • Fulham Gas Works Imperial Road London

    P/2026/00870/DET Submitted 27 Mar 2026 0m away

    95% historically approved · decision due ~27 May

    Details to discharge Condition 73 (a&b), 1:1 details and materials for development Development Plot H1 (Phase 4b) pursuant to Planning Permission (ref: 2018/02100/COMB) dated 8 February 2019 as varied by (ref: 2024/00961/VAR dated 23 December 2024).

    Awaiting decision Conditions 2 docs
  • Fulham Gas Works Imperial Road London

    P/2026/00869/DET Submitted 27 Mar 2026 0m away

    95% historically approved · decision due ~27 May

    Details to discharge Condition 82 (Roof Enclosures) for development Development Plot H1 (Phase 4b) pursuant to Planning Permission (ref: 2018/02100/COMB) dated 8 February 2019 as varied by (ref: 2024/00961/VAR dated 23 December 2024).

    Awaiting decision Conditions 2 docs
  • Fulham Gas Works Imperial Road London

    P/2026/00868/DET Submitted 27 Mar 2026 0m away

    95% historically approved · decision due ~26 May

    Details to discharge Condition 71 (Operational Waste Management Plan) for development Development Plot H1 (Phase 4b) pursuant to Planning Permission (ref: 2018/02100/COMB) dated 8 February 2019 as varied by (ref: 2024/00961/VAR dated 23 December 2024).

    Awaiting decision Conditions 2 docs

In Hammersmith and Fulham

  • 3 Shortlands, London, W6 8DA

    Submission of details of demolition and construction workforce travel plan pursuant to condition 41 of planning permission ref: 2025/01723/FUL granted 1st July 2026.

    7 Jul 2026 Conditions
  • P/2026/02370/DET Awaiting decision

    M&S White City Site 54 Wood Lane London W12 7RQ

    Discharge of Condition 80 (Energy Plant Air Quality Assessment); Condition 81 (CHP and boiler NOx emissions) of Planning Permission (ref: 2023/01965/VAR) dated 21 August 2024.

    14 Sep 2026 Conditions
  • 227 Shepherd'S Bush Road, London, W6 7AS

    Submission of details of external facing materials (including manufacturer's specifications and photographs of the material sample) pursuant to condition 6; detailed drawings in plan, elevation and section (at a scale of 1:20) of the proposed windows and doors (including opening style) pursuant to condition 7 of planning application ref: 2025/01185/PDAA56 granted 31st October 2025.

    15 Jun 2026 Conditions
  • 3 Shortlands, London, W6 8DA

    Submission of details of hard and soft landscaping of all areas external to the building, detailed drawings at a scale of not less than 1:20 to include all planting and paving, seating, fences, gates and other means of enclosure pursuant to condition 46 of planning permission ref: 2025/01723/FUL granted 1st July 2026.

    10 Jul 2026 Conditions
  • P/2026/02360/DET Awaiting decision

    Land at the former Hartopp point and Lannoy Point Aintree Estate, Pellant Road London SW6 7NG

    Details to discharge Condition 48 (Secure by Design) of planning permission (ref: 2022/01346/FR3) dated 9 February 2023 as amended by 2025/03564/NMAT dated 2 February 2026.

    11 Sep 2026 Conditions