Planning application
Fulham Gas Works Imperial Road London
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Details to discharge Condition 16 (Preliminary Risk Assessment) for Development Phases 3a, 4a, 5a, 5b and 6 pursuant to Planning Permission (ref: 2018/02100/COMB) dated 8 February 2019 as varied by (ref: 2024/00961/VAR dated 23 December 2024).
As published by the council, reference P/2026/01214/DET
Application record
- Reference
- P/2026/01214/DET
- Type
- Details to Meet Conditions Full/Outline
- Status
- REGISTERED: Under Assessment
- Received
- 6 May 2026
- Validated
- 12 May 2026
- Ward
- Parsons Green And Sandford|Sands End
Site history
Applications at this address on the Hammersmith and Fulham register
This site has had 109 applications since 2020: 31 approved, 0 refused.
-
P/2026/02015/DET Awaiting decision
Fulham Gas Works Imperial Road London
Details to discharge Condition 62 (Road Safety Audit) for Plot H1 (Phase 4b) pursuant to Planning Permission (ref: 2018/02100/COMB) dated 8 February 2019 as varied by (ref: 2024/00961/VAR dated 23 December 2024).
-
P/2026/01772/NMAT Awaiting decision
Fulham Gas Works,Imperial Road,London
Non-Material Amendment to Planning Permission (ref: 2018/02100/COMB ) dated 8 February 2019 (as amended by ref: 2024/00961/VAR dated 3 December 2024), in respect of Condition 73 (details and materials). The proposed amendment being the requirement of a mock up to be provided remotely for review by officers rather than on site.
-
P/2026/01754/DLBC Awaiting decision
Fulham Gas Works Imperial Road London
Details of paint finishes, in compliance with Condition 3 of Listed Building consent 2025/00568/LBC dated 23 July 2026.
-
P/2026/01473/DET Granted
Fulham Gas Works Imperial Road London
Details to discharge Condition 20 (Verification Report) for Phases 3b, 3c and 3d (Development Plots E1 and E2) pursuant to Planning Permission (ref: 2018/02100/COMB) dated 8 February 2019 as varied by (ref: 2024/00961/VAR dated 23 December 2024).
-
P/2026/01890/VAR Awaiting decision
Fulham Gas Works Imperial Road London
Variation of Condition 1 (Drawings) of reserved matters details relating to the approval of access; appearance; landscaping; layout and scale in respect of Phases 4b, 4c and 4d (Development Plots H1 and H2); for the erection of two buildings comprising residential and non-residential floorspace with associated landscaping approved under 2024/01420/RES granted 17 January 2025 of planning permission 2018/02100/COMB granted 8 February 2019 (as amended by refs 2020/01088/NMAT and 2024/00818/NMAT). As varied by 2024/00961/VAR variation of Condition 4 (Drawings) and Condition 5 (Design Codes and Parameter Plans) of planning permission 2018/02100/COMB granted 8 Feb 2019 (as amended by refs 2020/01088/NMAT and 2024/00818/NMAT). The proposed amendments to Phase 4b Development Plot H1 comprise: (a) revisions to tower and shoulder terrace heights within consented maximum parameter heights (comprising an increase in shoulder height and reduction in tower height); (b) changes to the arrangemen... read more
-
P/2026/01125/ADV Granted
Fulham Gas Works Imperial Road London
Display of 1no. internally illuminated fascia sign and 2no. non-illuminated projecting signs to Unit 4a, phase 1
-
P/2026/01024/DET Awaiting decision
Fulham Gas Works Imperial Road London
Details to discharge Condition 87 (Materials) for development Development Plot H1 (Phase 4b) pursuant to Planning Permission (ref: 2018/02100/COMB) dated 8 February 2019 as varied by (ref: 2024/00961/VAR dated 23 December 2024).
-
P/2026/01008/DET Awaiting decision
Fulham Gas Works,Imperial Road,London
Details to discharge Condition 74 (1:20 details) for development Development Plot H1 (Phase 4b) pursuant to Planning Permission (ref: 2018/02100/COMB) dated 8 February 2019 as varied by (ref: 2024/00961/VAR dated 23 December 2024)
-
P/2026/01009/DET Awaiting decision
Fulham Gas Works Imperial Road London
Details to discharge Condition 89 (Secured by Design - Ground Level) for development Development Plot H1 (Phase 4b) pursuant to Planning Permission (ref: 2018/02100/COMB) dated 8 February 2019 as varied by (ref: 2024/00961/VAR dated 23 December 2024).
-
P/2026/00946/DET Granted
Fulham Gas Works Imperial Road London
Details to discharge Condition 88 (Secure by Design (Basement)) and Condition 89 (Secure By Design (Above Ground)) for development Development Plot E2 (Phase 3cd) pursuant to Planning Permission (ref: 2018/02100/COMB) dated 8 February 2019 as varied by (ref: 2024/00961/VAR dated 23 December 2024).
Timeline
Dates from the published record
-
6 May 2026
Received by Hammersmith and Fulham
-
12 May 2026
Validated
Checked as complete and ready for consideration.
-
24 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 7 July 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Hammersmith and Fulham took a median of 79 days over the applications it decided in the last year.
Documents
Plans, drawings, consultee responses and the officer's report
6 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat happens while it is decided
This application is with Hammersmith and Fulham for determination, against a statutory target of eight weeks. Over the last year Hammersmith and Fulham decided condition discharge and variation applications in a median of 81 days. More in our guide to how long planning decisions take.
About condition discharge and variation applications
This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
Fulham Gas Works Imperial Road London
Details to discharge Condition 88 (Secure by Design (Basement)) and Condition 89 (Secure By Design (Above Ground)) for development Development Plot E2 (Phase 3cd) pursuant to Planning Permission (ref: 2018/02100/COMB) dated 8 February 2019 as varied by (ref: 2024/00961/VAR dated 23 December 2024).
Granted Conditions 6 docs -
Fulham Gas Works Imperial Road London
Details to discharge Condition 20 (Verification Report) for Phases 3b, 3c and 3d (Development Plots E1 and E2) pursuant to Planning Permission (ref: 2018/02100/COMB) dated 8 February 2019 as varied by (ref: 2024/00961/VAR dated 23 December 2024).
Granted Conditions 12 docs -
Fulham Gas Works Imperial Road London
95% historically approved · decision due ~26 May
Details to discharge Condition 40 (Microclimate) for development Development Plot H1 (Phase 4b) pursuant to Planning Permission (ref: 2018/02100/COMB) dated 8 February 2019 as varied by (ref: 2024/00961/VAR dated 23 December 2024).
Awaiting decision Conditions 4 docs -
Fulham Gas Works Imperial Road London
95% historically approved · decision due ~27 May
Details to discharge Condition 73 (a&b), 1:1 details and materials for development Development Plot H1 (Phase 4b) pursuant to Planning Permission (ref: 2018/02100/COMB) dated 8 February 2019 as varied by (ref: 2024/00961/VAR dated 23 December 2024).
Awaiting decision Conditions 2 docs -
Fulham Gas Works Imperial Road London
95% historically approved · decision due ~27 May
Details to discharge Condition 82 (Roof Enclosures) for development Development Plot H1 (Phase 4b) pursuant to Planning Permission (ref: 2018/02100/COMB) dated 8 February 2019 as varied by (ref: 2024/00961/VAR dated 23 December 2024).
Awaiting decision Conditions 2 docs -
Fulham Gas Works Imperial Road London
95% historically approved · decision due ~26 May
Details to discharge Condition 71 (Operational Waste Management Plan) for development Development Plot H1 (Phase 4b) pursuant to Planning Permission (ref: 2018/02100/COMB) dated 8 February 2019 as varied by (ref: 2024/00961/VAR dated 23 December 2024).
Awaiting decision Conditions 2 docs
Other condition discharge and variation applications
In Hammersmith and Fulham
-
P/2026/01716/DET Granted
3 Shortlands, London, W6 8DA
Submission of details of demolition and construction workforce travel plan pursuant to condition 41 of planning permission ref: 2025/01723/FUL granted 1st July 2026.
-
P/2026/02370/DET Awaiting decision
M&S White City Site 54 Wood Lane London W12 7RQ
Discharge of Condition 80 (Energy Plant Air Quality Assessment); Condition 81 (CHP and boiler NOx emissions) of Planning Permission (ref: 2023/01965/VAR) dated 21 August 2024.
-
P/2026/01530/DET Granted
227 Shepherd'S Bush Road, London, W6 7AS
Submission of details of external facing materials (including manufacturer's specifications and photographs of the material sample) pursuant to condition 6; detailed drawings in plan, elevation and section (at a scale of 1:20) of the proposed windows and doors (including opening style) pursuant to condition 7 of planning application ref: 2025/01185/PDAA56 granted 31st October 2025.
-
P/2026/01758/DET Granted
3 Shortlands, London, W6 8DA
Submission of details of hard and soft landscaping of all areas external to the building, detailed drawings at a scale of not less than 1:20 to include all planting and paving, seating, fences, gates and other means of enclosure pursuant to condition 46 of planning permission ref: 2025/01723/FUL granted 1st July 2026.
-
P/2026/02360/DET Awaiting decision
Land at the former Hartopp point and Lannoy Point Aintree Estate, Pellant Road London SW6 7NG
Details to discharge Condition 48 (Secure by Design) of planning permission (ref: 2022/01346/FR3) dated 9 February 2023 as amended by 2025/03564/NMAT dated 2 February 2026.