Planning application
Fulham Gas Works Imperial Road London
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Details of paint finishes, in compliance with Condition 3 of Listed Building consent 2025/00568/LBC dated 23 July 2026.
As published by the council, reference P/2026/01754/DLBC
Application record
- Reference
- P/2026/01754/DLBC
- Type
- Details to Meet Conditions LBC
- Status
- REGISTERED: Under Consultation
- Received
- 10 Jul 2026
- Validated
- 20 Aug 2026
- Ward
- Parsons Green And Sandford
Comment by 10 September 2026
The council is taking comments on this application until then. Comments go to Hammersmith and Fulham through their own planning portal.
Timeline
Dates from the published record
-
10 Jul 2026
Received by Hammersmith and Fulham
-
20 Aug 2026
Validated
Checked as complete and ready for consideration.
-
22 Aug 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 15 October 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Hammersmith and Fulham took a median of 78 days over the applications it decided in the last year.
Documents
Plans, drawings, consultee responses and the officer's report
3 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat happens while it is decided
The process from here
This application is with Hammersmith and Fulham for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About conditions applications
How this application type works
This type of application deals with conditions attached to an existing permission, either by supplying the details a condition requires, called discharging it, or by asking to vary or remove one. It does not reopen the principle of the permission itself. Building often cannot lawfully start, or continue past a set stage, until the named conditions are discharged.
Nearby applications
Within 500 metres
-
Fulham Gas Works Imperial Road London
Details to discharge Condition 88 (Secure by Design (Basement)) and Condition 89 (Secure By Design (Above Ground)) for development Development Plot E2 (Phase 3cd) pursuant to Planning Permission (ref: 2018/02100/COMB) dated 8 February 2019 as varied by (ref: 2024/00961/VAR dated 23 December 2024).
Granted Conditions 6 docs -
Fulham Gas Works Imperial Road London
Details to discharge Condition 20 (Verification Report) for Phases 3b, 3c and 3d (Development Plots E1 and E2) pursuant to Planning Permission (ref: 2018/02100/COMB) dated 8 February 2019 as varied by (ref: 2024/00961/VAR dated 23 December 2024).
Granted Conditions 12 docs -
Fulham Gas Works Imperial Road London
95% historically approved · decision due ~7 Jul
Details to discharge Condition 16 (Preliminary Risk Assessment) for Development Phases 3a, 4a, 5a, 5b and 6 pursuant to Planning Permission (ref: 2018/02100/COMB) dated 8 February 2019 as varied by (ref: 2024/00961/VAR dated 23 December 2024).
Awaiting decision Conditions 6 docs -
Fulham Gas Works Imperial Road London
95% historically approved · decision due ~26 May
Details to discharge Condition 40 (Microclimate) for development Development Plot H1 (Phase 4b) pursuant to Planning Permission (ref: 2018/02100/COMB) dated 8 February 2019 as varied by (ref: 2024/00961/VAR dated 23 December 2024).
Awaiting decision Conditions 4 docs -
Fulham Gas Works Imperial Road London
95% historically approved · decision due ~27 May
Details to discharge Condition 73 (a&b), 1:1 details and materials for development Development Plot H1 (Phase 4b) pursuant to Planning Permission (ref: 2018/02100/COMB) dated 8 February 2019 as varied by (ref: 2024/00961/VAR dated 23 December 2024).
Awaiting decision Conditions 2 docs -
Fulham Gas Works Imperial Road London
95% historically approved · decision due ~27 May
Details to discharge Condition 82 (Roof Enclosures) for development Development Plot H1 (Phase 4b) pursuant to Planning Permission (ref: 2018/02100/COMB) dated 8 February 2019 as varied by (ref: 2024/00961/VAR dated 23 December 2024).
Awaiting decision Conditions 2 docs
Other conditions applications
In Hammersmith and Fulham
-
P/2026/01837/DLBC Granted
25 St Peter'S Square, London, W6 9NW
Submission of details of Full details, including photographs of physical samples, of materials to be used on the external surfaces of the building, boundary walls and ground surfaces pursuant to condition 3 of planning application ref: 2025/02038/LBC granted 2nd July 2026.
-
P/2026/01565/DET Granted
517-523 Fulham Road, London, SW6 1HD
Submission of details pursuant to Condition 7 (Anti-Vibration) of the planning permission reference: 2024/02201/FUL dated 24th September 2025.
-
P/2026/01717/DET Granted
3 Shortlands, London, W6 8DA
Submission of details of secured by design pursuant to condition 31 of planning permission ref: 2025/01723/FUL granted 1st July 2026.
-
P/2026/01708/DET Granted
11 Farm Lane, London, SW6 1PU
Submission of details of a post installation compliance report of the approved ventilation strategy, pursuant to Condition 17 of the planning permission reference: 2022/03329/FR3 dated 19th July 2023.
-
P/2026/01604/DET Granted
20 Avonmore Road, London, W14 8RR
Submission of details on the use of tall plant/scaffolding, in consultation with TFL Infrastructure Protection, pursuant to Condition 19 of planning permission reference: 2024/01752/FUL dated 10th December 2025.