Planning application
14-21 Holborn Viaduct 32-33 & 34-35 Farringdon Street London EC1A 2AT
Relates to 24/00228/NMA, 23/00148/NMA, 23/00877/NMA
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Application under Section 73 of the Town and Country Planning Act 1990 (as amended) to vary condition 22(p)(further details) and condition 63 (approved drawings) of planning permission ref. 21/00755/FULMAJ (dated 07.02.2022) (as amended by 22/00677/NMA (dated 19.08.2022), 23/00148/NMA (dated 31.03.2023), 23/00877/NMA (dated 10.07.2024) and 24/00228/NMA (dated 11.11.2024)), to facilitate amendments to the approved scheme including but not limited to: (i) alterations to ground floor facades on Holborn Viaduct and Farringdon Street to omit digital art screens and incorporate a vitrine to display archaeological artefacts, a historic interpretation plaque and ceramic printed glass artwork; (ii) omission of green wall to north-east corner of Holborn Viaduct facade and replacement with new artwork panel; (iii) alterations to Farringdon Street pu realm; and (iv) alterations to the roof plan to omit louvres.
As published by the council, reference 25/00975/FULMAJ
Application record
- Reference
- 25/00975/FULMAJ
- Type
- Full Major Application
- Status
- Under Consideration
- Received
- 24 Jul 2025
- Validated
- 24 Jul 2025
- Ward
- Farringdon Within
- Decision by
- Delegated
- Postcode
- EC1A 2AT
Site history
Applications at this address on the City of London register
This site has had 37 applications since 2022: 29 approved, 0 refused.
-
26/01577/PODC Awaiting decision
14-21 Holborn Viaduct 32-33 & 34-35 Farringdon Street London EC1A 2AT
Submission of the Carbon Offset Assessment pursuant to Schedule 3 Paragraph 15.2 of the Section 106 Agreement dated 07 February 2022 (Planning Application Reference: 21/00755/FULMAJ) as amended by the Deed of Variation dated 14 March 2024 (Planning Application Reference: 21/0755/FULMAJ/DOV).
-
26/01227/MDC Awaiting decision
14-21 Holborn Viaduct 32-33 & 34-35 Farringdon Street London EC1A 2AT
Submission of post-installation Noise Impact Assessment and details of anti-vibration mounts pursuant to conditions 33 and 36 of planning permission 21/00755/FULMAJ (dated 07.02.2022).
-
26/01135/MDC Granted
14-21 Holborn Viaduct 32-33 & 34-35 Farringdon Street London EC1A 2AT
Submission of Air Quality Statement pursuant to condition 32 of planning permission 21/00755/FULMAJ dated 07.02.2022.
-
26/01105/MDC Awaiting decision
14-21 Holborn Viaduct 32-33 & 34-35 Farringdon Street London EC1A 2AT
Submission of details of artwork and heritage interpretation panels and signage pursuant to condition 30 of planning permission 21/00755/FULMAJ dated 07.02.2022.
-
26/01090/MDC Granted
14-21 Holborn Viaduct 32-33 & 34-35 Farringdon Street London EC1A 2AT
Submission of post Condition survey of LU/TfL Assets pursuant to condition 58 (part 4) of planning permission 21/00755/FULMAJ dated 07/02/2022.
-
26/01072/MDC Awaiting decision
14-21 Holborn Viaduct 32-33 & 34-35 Farringdon Street London EC1A 2AT
Submission of details of the SuDS infrastructure and its lifetime maintenance, pursuant to condition 19 of planning permission 21/00755/FULMAJ dated 07/02/2022.
-
26/00586/PODC Granted
14-21 Holborn Viaduct 32-33 & 34-35 Farringdon Street London EC1A 2AT
Submission of the Local Procurement Strategy Final Report pursuant to Schedule 3 Paragraph 2.8 of the S106 Agreement dated 07 February 2022 (Planning Application Reference: 21/00755/FULMAJ) as amended by the Deed of Variation dated 14 March 2024 (Planning Application Reference: 21/0755/FULMAJ/DOV.
-
26/00356/MDC Granted
14-21 Holborn Viaduct 32-33 & 34-35 Farringdon Street London EC1A 2AT
Submission of details of proposed PV panels and technical specification pursuant to condition 29 of Planning Permission 21/00755/FULMAJ dated 07.02.2022.
-
26/00141/MDC Awaiting decision
14-21 Holborn Viaduct 32-33 & 34-35 Farringdon Street London EC1A 2AT
Submission of details of green and blue roofs pursuant to condition 23 of Planning Permission 21/00755/FULMAJ dated 07.02.2022.
-
26/00143/MDC Granted
14-21 Holborn Viaduct 32-33 & 34-35 Farringdon Street London EC1A 2AT
Submission of details of green walls, planting selections and method of irrigation and ongoing maintenance pursuant to conditions 22(part O) and condition 31 (part L) of planning permission 21/00755/FULMAJ dated 07.02.2022.
Timeline
Dates from the published record
-
24 Jul 2025
Received by City of London
-
24 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 23 October 2025, 13 weeks from validation under the statutory target. Extensions of time are common and are agreed case by case.
City of London took a median of 84 days over the applications it decided in the last year.
Related applications
Cases linked to this one on the register
-
24/00228/NMA Granted
Development Site 14 - 21 Holborn Viaduct London EC1A 2AT
Application under Section 96A of the Town and Country Planning Act 1990 (as amended) for non-material amendments to planning permission 21/00755/FULMAJ (dated 07.02.2022) including: (a) Revised Farringdon Street public realm arrangement, including a reduction in short stay cycle parking spaces and revised planter/bench arrangement; (b) Revised entrance door arrangement on Farringdon Street; (c) Realignment of the Northwest Corner Green Wall; (d) Revised entrance door arrangement on Holborn Viaduct; (e) Facade realignment along Newcastle close to remove stepped set out as approved; (f) Revised location of doors along Newcastle Close to coordinate with street levels; (g) Introduction of shadow box glazing to respond to internal UKPN requirements along Newcastle Close; (h) Amendments to the proposed glazing along Newcastle Close to respond to revised internal layouts; (i) Re-alignment of Level 11 North East corner to provide a smoother transition between facades; (j) Re-alignment of Level 13 North East corner panel realigned to respond to levels below; (k) Amendment to climbers from green walls at upper levels, to respond to maintenance and fire safety requirements; (l) Minor adjustments to the roof plan to accommodate design development on balustrades and fire requirements; (m) Minor adjustments to the eastern boundary to address buildability and party wall access requirements; (n) Revised materiality to the south facade of Farringdon St service yard to improve buildability and minimise maintenance requirements; and (o) Amendment to condition 63 (approved drawings) to incorporate the proposed changes.
-
23/00148/NMA Granted
14 - 21 Holborn Viaduct London
Non-material amendment under Section 96A of the Town and Country Planning Act 1990 (as amended) to planning permission 21/00755/FULMAJ dated 07 Feb 2022 to vary the wording of Condition 18 (Drainage) to exclude piling as a form of construction work.
-
23/00877/NMA Granted
14 - 21 Holborn Viaduct London EC1A 2AT
Application for non-material amendment under Section 96A of the Town and Country Planning Act 1990 (as amended) to change the wording of condition 18 (SuDS) to allow for amended surface water flow rates pursuant to planning permission 21/00755/FULMAJ (dated 07.02.2022).
- Application: 21/00755/FULMAJ (Decided)
Who's behind it
Company information only, from the register and Companies House
DP9 Ltd Agent
Active · incorporated 2004
2,662 applications on PlanIndex · across 36 councils · 98% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
51 documents on file for this application
- PROPOSED ROOF PLAN
- PROPOSED EAST ELEVATION
- PROPOSED WEST ELEVATION FARRINGDON STREET
- PROPOSED NORTH ELEVATION HOLBORN VIADUCT
- PROPOSED SOUTH ELEVATION
- PROPOSED GATEHOUSE FLANK ELEVATIONS
- PROPOSED NEWCASTLE CLOSE ELEVATIONS
- VITRINE SELECTION OPTIONS
- CULTURAL MANAGEMENT PLAN
- FACADE DETAILED ELEVATIONS AND SECTIONS
- PROPOSED GROUND FLOOR PLAN FARRINGDON STREET
- PROPOSED MEZZANINE PLAN FARRINGDON STREET
- PROPOSED LEVEL 03 PLAN
- PROPOSED LEVEL 04 PLAN
- PROPOSED LEVEL 05 PLAN
- PROPOSED LEVEL 06 PLAN
- PROPOSED LEVEL 07 PLAN
- PROPOSED LEVEL 08 PLAN
- PROPOSED LEVEL 09 PLAN
- PROPOSED LEVEL 10 PLAN
- PROPOSED LEVEL 01 PLAN FARRINGDON STREET
- PROPOSED LEVEL 02 PLAN (HOLBORN VIADUCT GROUND)
- PROPOSED LEVEL 11 PLAN
- PROPOSED LEVEL 12 PLAN
- PROPOSED LEVEL 13 PLAN
- COMMENTS - HACKNEY COUNCIL
- COMMENTS - LONDON BOROUGH OF RICHMOND UPON THAMES
- COMMENTS-TRANSPORT FOR LONDON
- COMMENTS - HAMMERSMITH & FULHAM COUNCIL
- COMMENTS - LONDON UNDERGROUND
- COMMENTS - SURVEYOR TO THE FABRIC OF ST PAUL?S CATHEDRAL
- CONSULTEE COMMENTS - TOWER HAMLETS
- CONSULTEE COMMENTS - GREENWICH
- COMMENTS - WESTMINSTER CITY COUNCIL
- COMMENTS - LAMBETH COUNCIL
- COMMENTS - HISTORIC ENGLAND
- COMMENTS - HISTORIC ENGLAND
- COMMENTS-LONDON BOROUGH OF CAMDEN
- APPLICATIONFORMREDACTED
- 14-21 HOLBORN VIADUCT - S73 - COVER LETTER
- 14-21 HOLBORN VIADUCT - ENERGY WLC AND CES DESIGN NOTE
- 14-21 HOLBORN VIADUCT- THVIA ADDENDUM - JUNE 2025
- 14-21 HOLBORN VIADUCT - S73 - CULTURAL MANAGEMENT PLAN (2)
- 1395_HV_PLANNING S73_REGISTER DRAWINGS LIST
- 1395_HV_PLANNING S73_DAS AD REPORT_PART 2_
- 1395_HV_PLANNING S73_DAS AD REPORT_PART 3_
- 1395_HV_PLANNING S73_DAS AD REPORT_PART 4_
- 1395_HV_PLANNING S73_DAS AD REPORT_PART 1_
- 1395_HV_PLANNING S73_ DRAWINGS_PART 2_
- 1395_HV_PLANNING S73_ DRAWINGS_PART 3_
- 1395_HV_PLANNING S73_ DRAWINGS_PART 1_
Watch members (£5 a month) open the document list from here.
Open the documentsWhat happens while it is decided
This application is with City of London for determination, against a statutory target of thirteen weeks. Over the last year City of London decided full applications in a median of 121 days. More in our guide to how long planning decisions take.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Development Site 14 - 21 Holborn Viaduct London EC1A 2AT
Application under Section 96A of the Town and Country Planning Act 1990 (as amended) for non-material amendments to planning permission 21/00755/FULMAJ (dated 07.02.2022) including: (a) Revised Farringdon Street public realm arrangement, including a reduction in short stay cycle parking spaces and revised planter/bench arrangement; (b) Revised entrance door arrangement on Farringdon Street; (c) Realignment of the Northwest Corner Green Wall; (d) Revised entrance door arrangement on Holborn Viaduct; (e) Facade realignment along Newcastle close to remove stepped set out as approved; (f) Revised location of doors along Newcastle Close to coordinate with street levels; (g) Introduction of shadow box glazing to respond to internal UKPN requirements along Newcastle Close; (h) Amendments to the proposed glazing along Newcastle Close to respond to revised internal layouts; (i) Re-alignment of Level 11 North East corner to provide a smoother transition between facades; (j) Re-alignment of Level 13 North East corner panel realigned to respond to levels below; (k) Amendment to climbers from green walls at upper levels, to respond to maintenance and fire safety requirements; (l) Minor adjustments to the roof plan to accommodate design development on balustrades and fire requirements; (m) Minor adjustments to the eastern boundary to address buildability and party wall access requirements; (n) Revised materiality to the south facade of Farringdon St service yard to improve buildability and minimise maintenance requirements; and (o) Amendment to condition 63 (approved drawings) to incorporate the proposed changes.
Granted Amendments Windows or glazing 38 docs -
14 - 21 Holborn Viaduct London
Non-material amendment under Section 96A of the Town and Country Planning Act 1990 (as amended) to planning permission 21/00755/FULMAJ dated 07 Feb 2022 to vary the wording of Condition 18 (Drainage) to exclude piling as a form of construction work.
Granted Amendments 4 docs -
14-21 Holborn Viaduct 32-33 & 34-35 Farringdon Street London EC1A 2AT
Submission of Local Procurement monitoring report pursuant to Schedule 3 Paragraph 2.7 of the S106 Agreement dated 07 February 2022 (Planning Application Reference: 21/00755/FULMAJ) as amended by the Deed of Variation dated 14 March 2024 (Planning Application Reference: 21/0755/FULMAJ/DOV
Granted 3 docs -
14-21 Holborn Viaduct 32-33 & 34-35 Farringdon Street London EC1A 2AT
100% historically approved · decision due ~19 Sep
Submission of plans, details, schedules and specifications pursuant to discharge of condition 28 and condition 31 (a) the position, size and types of planting of the green roof, its method of irrigation; (d) Soil including details of the type and depths of soil and substrates; (e) Species and selection of trees including details of its their age, growing habit, girth of trunk, how many times transplanted, root development; (f) Planting pit size and construction, tree guards; (g) Details of all soft landscaping including species and contribution to enhance biodiversity; (h) Seating; (i) Paving materials; (j) Maintenance plans for all proposed landscaping; (k) Planters; (m) Contribution to biodiversity enhancement of all landscaping including greening, green walls and green roof; of planning permission 21/00755/FULMAJ dated 07.02.2022.
Awaiting decision Conditions Trees 41 docs -
14 - 21 Holborn Viaduct London EC1A 2AT
Application for non-material amendment under Section 96A of the Town and Country Planning Act 1990 (as amended) to change the wording of condition 18 (SuDS) to allow for amended surface water flow rates pursuant to planning permission 21/00755/FULMAJ (dated 07.02.2022).
Granted Amendments 11 docs -
14-21 Holborn Viaduct 32-33 & 34-35 Farringdon Street London EC1A 2AT
100% historically approved · decision due ~27 Mar
Submission of details of green and blue roofs pursuant to condition 23 of Planning Permission 21/00755/FULMAJ dated 07.02.2022.
Awaiting decision Conditions 29 docs
Other full applications
In City of London
-
26/01083/FULL Granted
Offices Chapter House St Paul's Churchyard London EC4M 8AD
Alterations to undercroft of St Paul's Cathedral and minor alterations to Chapter House including (i) Installation of a new passenger lift and associated raised platform within the external contemporary undercroft of St Paul's Cathedral to provide step-free access between the Chapter House and the undercroft (ii) extension of the existing step at the eastern exit of the Chapter House following partial demolition of existing external staircase, landing, and railings to provide level access and replacement of existing security gate (iii) raising the floor level and removal of associated stairs at below-ground level and installation of external, open platform lift in undercroft (No other works to the Cathedral or wider undercroft).
-
26/01051/FULL Granted
55 Mark Lane London EC3R 7NE
Application under S73 of the Town and Country Planning Act 1990 (as amended) to allow the removal of condition 2 (refuse collection) of planning permission 15/00931/FULL dated 29/10/2015.
-
24/00544/FULL Granted
6 -7 New Street London EC2M 4TP
Conversion of two dwelling houses into eight studio flats and one two bedroom flat (ii) external alterations to windows on rear elevation of number 7 and mansard roof of number 6.
-
26/00858/FULL Granted
Condor House 10 St Paul's Churchyard London EC4M 8AL
Replacement of existing vertical sash window frames and glazing on north, east and northwestern facades with fixed glazing units.
-
26/01104/FULL Granted
30 - 34 Moorgate London EC2R 6DA
Refurbishment and alterations comprising, (i) alterations to plant equipment at roof level, (ii) installation of CCTV cameras, (iii) alterations to ground floor entrances, and (iv) removal of 2no. ground floor doors and installation of glazing, and associated works.