Skip to content
PlanIndex Get alerts
Menu

Planning application

Offices Chapter House St Paul's Churchyard London EC4M 8AD

Awaiting decision City of London 26/01083/FULL Full applications

Works: Extension Demolition

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Alterations to undercroft of St Paul's Cathedral and minor alterations to Chapter House including (i) Installation of a new passenger lift and associated raised platform within the external contemporary undercroft of St Paul's Cathedral to provide step-free access between the Chapter House and the undercroft (ii) extension of the existing step at the eastern exit of the Chapter House following partial demolition of existing external staircase, landing, and railings to provide level access and replacement of existing security gate (iii) raising the floor level and removal of associated stairs at below-ground level and installation of external, open platform lift in undercroft (No other works to the Cathedral or wider undercroft).

As published by the council, reference 26/01083/FULL

Application record

Reference
26/01083/FULL
Category
Full applications
Status
Under Consideration
Received
29 Jul 2026
Validated
7 Aug 2026
Ward
Bread Street
Decision by
Delegated
Postcode
EC4M 8AD

Timeline

Dates from the published record

  1. 29 Jul 2026

    Received by City of London

  2. 7 Aug 2026

    Validated

    Checked as complete and ready for consideration.

  3. 19 Aug 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 2 October 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    City of London took a median of 84 days over the applications it decided in the last year.

Cases linked to this one on the register

  • Application: 26/01084/LBC (Under Consideration)

Documents

Plans, drawings, consultee responses and the officer's report

28 documents on file for this application

  • COMMENTS - GREATER LONDON ARCHAEOLOGICAL ADVISORY SERVICE (GLAAS) Consultee Comment · 25 Aug 2026
  • COMMENTS - HISTORIC ENGLAND Consultee Comment · 21 Aug 2026
  • EMAIL - AGENT Correspondence In · 18 Aug 2026
  • APPLICATIONFORMREDACTED Application Form · 29 Jul 2026
  • SU-001 - LOCATION PLAN Drawing · 29 Jul 2026
  • PL-001_PROPOSED SITE PLAN Drawing · 29 Jul 2026
  • SU-002_GROUND-FLOOR - EXISTING PLAN Drawing · 29 Jul 2026
  • SU-003_BELOW-GROUND - EXISTING PLAN Drawing · 29 Jul 2026
  • SU-004_EXISTING ELEVATION Drawing · 29 Jul 2026
  • SU-005_EXISTING SECTION B-B Drawing · 29 Jul 2026
  • PL-002_GROUND-FLOOR - DEMOLITION PLAN Drawing · 29 Jul 2026
  • PL-003_GROUND-FLOOR - PROPOSED PLAN Drawing · 29 Jul 2026
  • PL-004_BELOW-GROUND - DEMOLITION PLAN Drawing · 29 Jul 2026
  • PL-005_BELOW-GROUND - PROPOSED PLAN Drawing · 29 Jul 2026
  • PL-006_DEMOLITION ELEVATION Drawing · 29 Jul 2026
  • PL-007_PROPOSED ELEVATION Drawing · 29 Jul 2026
  • PL-008_PROPOSED SECTION A-A Drawing · 29 Jul 2026
  • PL-009_DEMOLITION SECTION B-B Drawing · 29 Jul 2026
  • PL-010_PROPOSED SECTION B-B Drawing · 29 Jul 2026
  • PL-011_SECTIONS C-C Drawing · 29 Jul 2026
  • PL-012_SECTIONS D-D Drawing · 29 Jul 2026
  • PART 1 - DESIGN AND ACCESS STATEMENT Report - Design & Access Statement/Report · 29 Jul 2026
  • PART 2 - DESIGN AND ACCESS STATEMENT Report - Design & Access Statement/Report · 29 Jul 2026
  • PART 1 - HERITAGE IMPACT ASSESSMENT Accompanying report · 29 Jul 2026
  • PART 2 - HERITAGE IMPACT ASSESSMENT Accompanying report · 29 Jul 2026
  • STRUCTURAL STRATEGY STATEMENT Accompanying report · 29 Jul 2026
  • DELIVERY & SERVICING MANAGEMENT PLAN Accompanying report · 29 Jul 2026
  • CIL FORM Other · 29 Jul 2026

Watch members (£5 a month) open the document list from here.

Open the documents

What happens while it is decided

This application is with City of London for determination, against a statutory target of eight weeks. Over the last year City of London decided full applications in a median of 119 days. More in our guide to how long planning decisions take.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • St Paul's Cathedral And Assorted Surrounding Buildings St Paul's Churchyard City Of London London EC4M 8AD

    26/06877/OBS Submitted 8 Oct 2026 50 yards away

    89% historically approved · decision due ~3 Dec

    External lighting scheme to replace and upgrade the lighting on and to St Paul's Cathedral including on buildings adjacent to St Paul's Cathedral (4 St Paul's Churchyard, Juxon House, Chapter House, 1 Paternoster Square, Paternoster House, St Paul's Cathedral School and One Carter Lane), installed on columns and low level lighitng safety lighting to replace floodlights to St Paul's Cathedral Churchyard.

    Decided
  • Chapter House St Paul's Churchyard London EC4M 8AD

    26/01084/LBC Submitted 29 Jul 2026 50 yards away

    100% historically approved · decision due ~2 Oct

    Alterations to undercroft of St Paul's Cathedral and minor alterations to Chapter House including (i) Installation of a new passenger lift and associated raised platform within the external contemporary undercroft of St Paul's Cathedral to provide step-free access between the Chapter House and the undercroft (ii) extension of the existing step at the eastern exit of the Chapter House following partial demolition of existing external staircase, landing, and railings to provide level access and replacement of existing security gate (iii) raising the floor level and removal of associated stairs at below-ground level and installation of external, open platform lift in undercroft (No other works to the Cathedral or wider undercroft).

    Awaiting decision Heritage and listed buildings Extension Demolition 28 docs
  • Paternoster Lodge Paternoster Square London EC4M 7DX

    24/00826/FULL Submitted 1 Aug 2024 50 yards away

    Temporary installation of a London mural art installation on the front facade of the building, to be installed on 25th September 2024 and taken down on or before 30th November 2024.

    Granted Full applications 9 docs
  • 1 Paternoster Square London EC4M 7DX

    21/00513/FULL Submitted 15 Jun 2021 50 yards away

    Temporary placement of 7 tables, 14 chairs and 4 planters in an area contained within the building line in connection with the existing ground floor unit for a 12month period.

    Granted Full applications 7 docs
  • Retail Unit 7A 1 Paternoster Square London EC4M 7DX

    26/01260/FULL Submitted 8 Sep 2026 50 yards away

    99% historically approved · decision due ~25 Nov

    Alterations to shopfront comprising the replacement of 1no. set of existing entrance doors, the installation of 1no. new doorway, and associated alterations.

    Awaiting decision Full applications Windows or glazing
  • Retail Unit 7A 1 Paternoster Square London EC4M 7DX

    26/01261/ADVT Submitted 8 Sep 2026 50 yards away

    99% historically approved · decision due ~25 Nov

    Installation and display of 4no. advertisements, comprising (i) 2no. internally illuminated projecting signs, measuring 580mm (w) x 580mm (h) displayed at a height of 3040mm above ground level, (ii) 1no. halo illuminated sign made up of individual letters measuring 1044mm (w) x 259mm (h) displayed at a height of 2500mm above ground level, and (iii) 1no. non-illuminated information sign measuring 750mm (w) x 750mm (h) displayed at a height of 1107mm above ground level.

    Awaiting decision

In City of London

  • 25/01794/FULL Granted

    50 Cannon Street London EC4N 6JJ

    Refurbishment of existing office building with works including: creation of roof terraces, extension of existing lift shaft, replacement and relocation of existing rooftop plant and associated structures, changes to internal car and cycle parking arrangements, and improvements to the building's facade.

    Received 22 Dec, published by the council 24 Jul 2026 Full applications
  • 26/00865/FULL Granted

    9 Newbury Street London EC1A 7HU

    Extensions and alterations to the rear and interior of the existing office building (Use Class E) to provide (i) upgraded office space at lower ground and ground floors; (ii) conversion from office to one studio flat and one 1-bed dwelling (Use Class C3) at 1st to 3rd floors; and (iii) provision of a 1-bed dwelling within a newly created two storey roof extension at 4th and 5th floors with a roof terrace at 4th floor.

    Received 16 Jun, published by the council 24 Jul 2026 Full applications
  • 26/01110/FULL Granted

    200 Aldersgate Street London EC1A 4HD

    Retrospective application for the installation of 2no. condenser units to fifth floor roof.

    Received 3 Aug, published by the council 20 Aug 2026 Full applications
  • 26/01109/FULL Granted

    100 Bishopsgate London EC2N 4AA

    Installation of artwork along the junction of the landscaped space and the walls of St Ethelburga's Centre of Reconciliation and Peace: Continuum by Halima Cassell.

    Received 3 Aug, published by the council 21 Aug 2026 Full applications
  • 26/01053/FULL Granted

    49 Cheapside London EC2V 6AT

    Shopfront alteration at Unit 1A to replace existing solid blanking panel with clear glass

    Received 27 Jul, published by the council 20 Sep 2026 Full applications