Planning application
14-21 Holborn Viaduct 32-33 & 34-35 Farringdon Street London EC1A 2AT
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Submission of post-installation Noise Impact Assessment and details of anti-vibration mounts pursuant to conditions 33 and 36 of planning permission 21/00755/FULMAJ (dated 07.02.2022).
As published by the council, reference 26/01227/MDC
Application record
- Reference
- 26/01227/MDC
- Status
- Under Consideration
- Received
- 28 Aug 2026
- Validated
- 28 Aug 2026
- Postcode
- EC1A 2AT
Site history
Applications at this address on the City of London register
This site has had 30 applications since 2022: 19 approved, 0 refused.
-
26/01135/MDC Awaiting decision
14-21 Holborn Viaduct 32-33 & 34-35 Farringdon Street London EC1A 2AT
Submission of Air Quality Statement pursuant to condition 32 of planning permission 21/00755/FULMAJ dated 07.02.2022.
-
26/01105/MDC Awaiting decision
14-21 Holborn Viaduct 32-33 & 34-35 Farringdon Street London EC1A 2AT
Submission of details of artwork and heritage interpretation panels and signage pursuant to condition 30 of planning permission 21/00755/FULMAJ dated 07.02.2022.
-
26/01090/MDC Decided
14-21 Holborn Viaduct 32-33 & 34-35 Farringdon Street London EC1A 2AT
Submission of post Condition survey of LU/TfL Assets pursuant to condition 58 (part 4) of planning permission 21/00755/FULMAJ dated 07/02/2022.
-
26/01072/MDC Awaiting decision
14-21 Holborn Viaduct 32-33 & 34-35 Farringdon Street London EC1A 2AT
Submission of details of the SuDS infrastructure and its lifetime maintenance, pursuant to condition 19 of planning permission 21/00755/FULMAJ dated 07/02/2022.
-
26/00586/PODC Granted
14-21 Holborn Viaduct 32-33 & 34-35 Farringdon Street London EC1A 2AT
Submission of the Local Procurement Strategy Final Report pursuant to Schedule 3 Paragraph 2.8 of the S106 Agreement dated 07 February 2022 (Planning Application Reference: 21/00755/FULMAJ) as amended by the Deed of Variation dated 14 March 2024 (Planning Application Reference: 21/0755/FULMAJ/DOV.
-
26/00356/MDC Awaiting decision
14-21 Holborn Viaduct 32-33 & 34-35 Farringdon Street London EC1A 2AT
Submission of details of proposed PV panels and technical specification pursuant to condition 29 of Planning Permission 21/00755/FULMAJ dated 07.02.2022.
-
26/00141/MDC Awaiting decision
14-21 Holborn Viaduct 32-33 & 34-35 Farringdon Street London EC1A 2AT
Submission of details of green and blue roofs pursuant to condition 23 of Planning Permission 21/00755/FULMAJ dated 07.02.2022.
-
26/00143/MDC Awaiting decision
14-21 Holborn Viaduct 32-33 & 34-35 Farringdon Street London EC1A 2AT
Submission of details of: particulars and samples of (i) green walls including supporting structure (ii) type and volume of growing medium, (iii) planting, including species and varieties, (iv) method of irrigation, (v)maintenance regime, (vi) junctions with adjacent vertical surfaces; (vii) vertical greening including species, (vii) supporting structure, (viii) method of fixing, (ix) growing medium and (x) method of irrigation pursuant to condition 22(part O) and condition 31 (part L) of planning permission 21/00755/FULMAJ dated 07.02.2022.
-
26/00092/PODC Granted
14-21 Holborn Viaduct 32-33 & 34-35 Farringdon Street London EC1A 2AT
Submission of Local Procurement monitoring report pursuant to Schedule 3 Paragraph 2.7 of the S106 Agreement dated 07 February 2022 (Planning Application Reference: 21/00755/FULMAJ) as amended by the Deed of Variation dated 14 March 2024 (Planning Application Reference: 21/0755/FULMAJ/DOV
-
25/00982/MDC Awaiting decision
14-21 Holborn Viaduct 32-33 & 34-35 Farringdon Street London EC1A 2AT
Submission of plans, details, schedules and specifications pursuant to discharge of condition 28 and condition 31 (a) the position, size and types of planting of the green roof, its method of irrigation; (d) Soil including details of the type and depths of soil and substrates; (e) Species and selection of trees including details of its their age, growing habit, girth of trunk, how many times transplanted, root development; (f) Planting pit size and construction, tree guards; (g) Details of all soft landscaping including species and contribution to enhance biodiversity; (h) Seating; (i) Paving materials; (j) Maintenance plans for all proposed landscaping; (k) Planters; (m) Contribution to biodiversity enhancement of all landscaping including greening, green walls and green roof; of planning permission 21/00755/FULMAJ dated 07.02.2022.
Timeline
Dates from the published record
-
28 Aug 2026
Received by City of London
-
20 Sep 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 23 October 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
City of London took a median of 80 days over the applications it decided in the last year.
What happens while it is decided
This application is with City of London for determination, against a statutory target of eight weeks. Over the last year City of London's median decision took 80 days. More in our guide to how long planning decisions take.
About this record
The published feed does not state which type of application this is; the register entry on City of London's portal will say. Our guide explains the common types.
Nearby applications
Within 0.3 miles
-
14-21 Holborn Viaduct 32-33 & 34-35 Farringdon Street London EC1A 2AT
99% historically approved · decision due ~1 Oct
Submission of Air Quality Statement pursuant to condition 32 of planning permission 21/00755/FULMAJ dated 07.02.2022.
Awaiting decision 3 docs -
14-21 Holborn Viaduct 32-33 & 34-35 Farringdon Street London EC1A 2AT
99% historically approved · decision due ~25 Sep
Submission of details of artwork and heritage interpretation panels and signage pursuant to condition 30 of planning permission 21/00755/FULMAJ dated 07.02.2022.
Awaiting decision 3 docs -
14-21 Holborn Viaduct 32-33 & 34-35 Farringdon Street London EC1A 2AT
99% historically approved · decision due ~24 Sep
Submission of post Condition survey of LU/TfL Assets pursuant to condition 58 (part 4) of planning permission 21/00755/FULMAJ dated 07/02/2022.
Decided 6 docs -
14-21 Holborn Viaduct 32-33 & 34-35 Farringdon Street London EC1A 2AT
99% historically approved · decision due ~22 Sep
Submission of details of the SuDS infrastructure and its lifetime maintenance, pursuant to condition 19 of planning permission 21/00755/FULMAJ dated 07/02/2022.
Awaiting decision 5 docs -
14-21 Holborn Viaduct 32-33 & 34-35 Farringdon Street London EC1A 2AT
Submission of the draft Cultural Management Plan pursuant to Schedule 3, Paragraph 6.1.1 of the Section 106 agreement dated 7th February 2022 (Planning Application Reference 21/00755/FULMAJ, as amended by the Deed of Variation dated 14 March 2024.
Withdrawn 2 docs -
14-21 Holborn Viaduct 32-33 & 34-35 Farringdon Street London EC1A 2AT
Submission of details of entrances; details of a typical bay of the development; details of glazing and fenestration; details of fins and solar shading; details of ground floor facades; details of the Farringdon Street facade; details of the Holborn Viaduct facade; details of the Newcastle Close facades; details of parapets, balustrades, BMU cradles and other excrescences at roof level; details of external plant enclosures and plant; details of external ducts, vents, louvres and extracts; details of photovoltaic panels; and details, samples and particulars of external facing materials pursuant to condition 22 (parts A, B, C, D, E, F, G, H, I, J, K, L and Q) of planning permission 21/00755/FULMAJ dated 07/02/2022.
Granted Windows or glazing 24 docs