For plumbers
New bathrooms and kitchens show up on the register first
Extensions and conversions all need first fix. The council publishes the proposal long before anyone is on site.
An extension application is a new bathroom, a relocated kitchen or an extra en suite months before anyone is asked to quote for it. Conversions are stronger still: turning one house into flats multiplies the bathrooms, kitchens and boilers on a single address, and the whole intention is public on the register from day one.
Descriptions do a lot of the qualifying for you. "Two storey side extension" is heating and first fix; "conversion to four self-contained flats" is four of everything; "annexe" is a full small dwelling. The application page here gives you the address and the description at a glance, with dates that tell you how far along the project is, so you can time a call for when the budget is real rather than hopeful.
Watch your working area with a daily alert and the register becomes a lead list that maintains itself. On the Trade plan you can watch five areas and hear about decisions as well as new applications; the day a conversion is granted is a good day to be the first plumber to make contact. For reading the timetable between submission and start on site, see how long decisions take.
One that has already been approved
A real record from the index, relevant to plumbers
-
29/26/00005 Granted
St Edwards Church, Goathurst, Bridgwater, TA5 2DE
Erection of single storey extension to North elevation of the nave, partially on site of existing boiler room (to be demolished), and new external path/paving.
Published by Somerset. An alert for that area would have put this in your inbox on 5 September 2026.
Not sure how many jobs your patch actually produces? Ask us before you pay and we will tell you what the register shows.