Planning application
Land To The East Of Alwalton Hill Fletton Parkway Peterborough
Relates to 09/01369/OUT
Decided. The decision notice on the council portal carries the outcome in full, including any conditions.
Proposal
Discharge of Condition C25 (J17/A1(M) of planning application 09/01369/OUT - Development of up to 65 hectares of employment land (B1, B2 and B8 including safeguarding of a site for a household recycling centre/park and ride). Associated highway infrastructure (including pedestrian, bridleway and cycle routes), and car parking for all uses. Foul and surface water drainage networks (including SuDS and lakes)
As published by the council, reference 12/01006/DISCHG
Application record
- Reference
- 12/01006/DISCHG
- Type
- Compliance with Planning Condition(s)
- Status
- Decided
- Decision
- Determined
- Received
- 26 Nov 2009
- Validated
- 17 Jul 2012
- Decided
- 9 Oct 2012
- Ward
- Orton With Hampton
- Parish
- Peterborough
- Decision by
- Delegated Decision (Officer)
Site history
Applications at this address on the Peterborough register
This site has had 28 applications since 2009: 12 approved, 0 refused.
-
22/01169/MDOBL Granted
Land To The East Of Alwalton Hill Fletton Parkway Peterborough
Modifications to the Great Haddon S106 Agreement associated with 15/01672/WCPP
-
19/01651/NONMAT Decided
Land To The East Of Alwalton Hill Fletton Parkway Peterborough
Non material amendment ( additional process specific external plan and external storage) to planning permission 17/01759/REM
-
13/01428/DISCHG Decided
Land To The East Of Alwalton Hill Fletton Parkway Peterborough
Discharge of condition C2 (drainage) of planning permission 11/00943/REM - Landscaping of plot OS2
-
13/01387/DISCHG Decided
Land To The East Of Alwalton Hill Fletton Parkway Peterborough
Discharge of condition 3 (Archaeology) and condition 4 (Construction Management Plan) of planning permission 13/00713/FUL Construction of a Primary Electricity Sub Station and Foul Water Pumping Station
-
13/01118/WCPP Granted
Land To The East Of Alwalton Hill Fletton Parkway Peterborough
Variation of conditions 22 and 26 of planning approval 12/01334/WCPP (original conditions 21 and 25 of outline planning permission 09/01369/OUT) to change the timing of works to junction 17 of the A1(M) and junction1 of the Fletton Parkway to allow no more than 54 two way vehicle trips from the Great Haddon employment area between 8am and 9am
-
13/00713/FUL Granted
Land To The East Of Alwalton Hill Fletton Parkway Peterborough
Construction of a primary electricity supply station and foul water pumping station
-
12/01334/WCPP Granted
Land To The East Of Alwalton Hill Fletton Parkway Peterborough
Variation of condition 5 of outline planning permission 09/01369/OUT to allow a higher building (not exceeding 35m) to be built on plot E2.1 to meet the requirements of an occupier. The first sentence of condition 5 would read - Building heights shall not exceed a maximum height of 15 m except on plot E7 where the maximum height shall not exceed 17 m and on plot E2.1 where the maximum height shall not exceed 35 m
-
12/01309/FUL Granted
Land To The East Of Alwalton Hill Fletton Parkway Peterborough
Temporary drainage works
-
12/01213/REM Granted
Land To The East Of Alwalton Hill Fletton Parkway Peterborough
Construction of access road, south part, with attenuation pond
-
12/00984/DISCHG Decided
Land To The East Of Alwalton Hill Fletton Parkway Peterborough
Discharge of conditions C4 (Drainage) and C7 (Arboricultural impacts) of Planning Permission 11/02049/REM (Construction of initial section of the internal access road from Junction 1 of the Fletton Parkway)
Timeline
Dates from the published record
-
26 Nov 2009
Received by Peterborough
-
17 Jul 2012
Validated
Checked as complete and ready for consideration.
-
9 Oct 2012
Decision issued: Determined
-
23 Jul 2026
Added to PlanIndex
Related applications
Cases linked to this one on the register
-
09/01369/OUT Granted
Land To The East Of Alwalton Hill Fletton Parkway Peterborough
Development of up to 65 hectares of employment land (B1, B2 and B8 including safeguarding of a site for a household recycling centre/park and ride). Associated highway infrastructure (including pedestrian, bridleway and cycle routes), and car parking for all uses. Foul and surface water drainage networks (including SuDS and lakes)
Documents
Plans, drawings, consultee responses and the officer's report
32 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsAfter the decision
Peterborough has decided this application; the outcome above is the register's own wording and the decision notice on the council portal carries the detail. More in our guide to what happens after a planning decision.
About condition discharge and variation applications
This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Land To The East Of Alwalton Hill Fletton Parkway Peterborough
Discharge of conditions C11 (Great Crested Newt Stategy) and C12 (Biodiversity Strategy) of planning permission 09/01369/OUT - Development of up to 65 hectares of employment land (B1, B2 and B8 including safeguarding of a site for a household recycling centre/park and ride). Associated highway infrastructure (including pedestrian, bridleway and cycle routes), and car parking for all uses. Foul and surface water drainage networks (including SuDS and lakes)
Decided Conditions 6 docs -
Land To The East Of Alwalton Hill Fletton Parkway Peterborough
Development of up to 65 hectares of employment land (B1, B2 and B8 including safeguarding of a site for a household recycling centre/park and ride). Associated highway infrastructure (including pedestrian, bridleway and cycle routes), and car parking for all uses. Foul and surface water drainage networks (including SuDS and lakes)
Granted Outline 236 docs -
Land To The East Of Alwalton Hill Fletton Parkway Peterborough
Discharge of conditions 28(construction management plan) and 33(archaeological investigation) of planning permission 09/01369/OUT - Development of up to 65 hectares of employment land (B1, B2 and B8 including safeguarding of a site for a household recycling centre/park and ride). Associated highway infrastructure (including pedestrian, bridleway and cycle routes), and car parking for all uses. Foul and surface water drainage networks (including SuDS and lakes)
Decided Conditions 9 docs -
Land To The East Of Alwalton Hill Fletton Parkway Peterborough
Discharge of condition C11( Great Crested Newt Strategy) and C12 ( Biodiversity Strategy) of planning permission 09/01369/OUT - Development of up to 65 hectares of employment land (B1, B2 and B8 including safeguarding of a site for a household recycling centre/park and ride). Associated highway infrastructure (including pedestrian, bridleway and cycle routes), and car parking for all uses. Foul and surface water drainage networks (including SuDS and lakes)
Decided Conditions 9 docs -
Land To The East Of Alwalton Hill Fletton Parkway Peterborough
Discharge of condition 8 (Drainage) of Planning Permission 09/01369/OUT - (Development of up to 65 hectares of employment land (B1, B2 and B8 including safeguarding of a site for a household recycling centre/park and ride). Associated highway infrastructure (including pedestrian, bridleway and cycle routes), and car parking for all uses. Foul and surface water drainage networks (including SuDS and lakes))
Decided Conditions 35 docs -
Land To The East Of Alwalton Hill Fletton Parkway Peterborough
Variation of condition 5 of outline planning permission 09/01369/OUT to allow a higher building (not exceeding 35m) to be built on plot E2.1 to meet the requirements of an occupier. The first sentence of condition 5 would read - Building heights shall not exceed a maximum height of 15 m except on plot E7 where the maximum height shall not exceed 17 m and on plot E2.1 where the maximum height shall not exceed 35 m
Granted Full applications 130 docs
Other condition discharge and variation applications
In Peterborough
-
26/002981/DISCHG Status unknown
Land Adjacent to Unit B1, Club Way, Cygnet Park, Hampton, Peterborough, PE7 8JA
Discharge of Statutory BNG condition and part discharge of condition C4 (validat
-
26/002978/DISCHG Awaiting decision
Land West of Newborough Road, Paston Reserve, Newborough Road
23/01102/REM - Part discharge of condition C17 (validation report)
-
26/002729/DISCHG Decided
17A, Old Leicester Road, Wansford, Peterborough, PE8 6JR
25/01335/HHFUL - Discharge of condition C3 (materials) of planning permission 25
-
26/002969/DISCHG Awaiting decision
Aqua Drive Hampton Leys, Phorpres Way, Cygnet Park, Hampton Peterborough PE7 8TR
25/00529/REM - Discharge of condition C10 (EV charging points details) of reserv
-
26/002967/DISCHG Awaiting decision
Unit A Brotherhood Shopping Park Brotherhood Close Walton Peterborough PE4 6ZR
25/00827/FUL- Discharge of conditions C4 (Construction Traffic Management Plan),