Skip to content
PlanIndex Get alerts
Menu

Planning application

Land To The East Of Alwalton Hill Fletton Parkway Peterborough

Granted Peterborough 12/01334/WCPP Without Compliance (Planning Permission)

Relates to 09/01369/OUT

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Variation of condition 5 of outline planning permission 09/01369/OUT to allow a higher building (not exceeding 35m) to be built on plot E2.1 to meet the requirements of an occupier. The first sentence of condition 5 would read - Building heights shall not exceed a maximum height of 15 m except on plot E7 where the maximum height shall not exceed 17 m and on plot E2.1 where the maximum height shall not exceed 35 m

As published by the council, reference 12/01334/WCPP

Application record

Reference
12/01334/WCPP
Type
Without Compliance (Planning Permission)
Status
Decided
Decision
Granted As published: Permitted
Received
24 Aug 2012
Validated
3 Sep 2012
Decided
7 Mar 2013
Ward
Orton With Hampton
Parish
Peterborough
Decision by
Committee Decision

Site history

Applications at this address on the Peterborough register

This site has had 28 applications since 2009: 12 approved, 0 refused.

  • 22/01169/MDOBL Granted

    Land To The East Of Alwalton Hill Fletton Parkway Peterborough

    Modifications to the Great Haddon S106 Agreement associated with 15/01672/WCPP

    Decided 14 Feb 2023 Conditions
  • 19/01651/NONMAT Decided

    Land To The East Of Alwalton Hill Fletton Parkway Peterborough

    Non material amendment ( additional process specific external plan and external storage) to planning permission 17/01759/REM

    Decided 28 Nov 2019 Amendments
  • 13/01428/DISCHG Decided

    Land To The East Of Alwalton Hill Fletton Parkway Peterborough

    Discharge of condition C2 (drainage) of planning permission 11/00943/REM - Landscaping of plot OS2

    Decided 1 Nov 2013 Conditions
  • 13/01387/DISCHG Decided

    Land To The East Of Alwalton Hill Fletton Parkway Peterborough

    Discharge of condition 3 (Archaeology) and condition 4 (Construction Management Plan) of planning permission 13/00713/FUL Construction of a Primary Electricity Sub Station and Foul Water Pumping Station

    Decided 25 Nov 2013 Conditions
  • 13/01118/WCPP Granted

    Land To The East Of Alwalton Hill Fletton Parkway Peterborough

    Variation of conditions 22 and 26 of planning approval 12/01334/WCPP (original conditions 21 and 25 of outline planning permission 09/01369/OUT) to change the timing of works to junction 17 of the A1(M) and junction1 of the Fletton Parkway to allow no more than 54 two way vehicle trips from the Great Haddon employment area between 8am and 9am

    Decided 17 Oct 2013 Full applications
  • 13/00713/FUL Granted

    Land To The East Of Alwalton Hill Fletton Parkway Peterborough

    Construction of a primary electricity supply station and foul water pumping station

    Decided 29 Aug 2013 Full applications
  • 12/01309/FUL Granted

    Land To The East Of Alwalton Hill Fletton Parkway Peterborough

    Temporary drainage works

    Decided 12 Oct 2012 Full applications
  • 12/01213/REM Granted

    Land To The East Of Alwalton Hill Fletton Parkway Peterborough

    Construction of access road, south part, with attenuation pond

    Decided 3 Jan 2013 Reserved matters
  • 12/00984/DISCHG Decided

    Land To The East Of Alwalton Hill Fletton Parkway Peterborough

    Discharge of conditions C4 (Drainage) and C7 (Arboricultural impacts) of Planning Permission 11/02049/REM (Construction of initial section of the internal access road from Junction 1 of the Fletton Parkway)

    Decided 16 Aug 2012 Conditions
  • 12/00957/DISCHG Decided

    Land To The East Of Alwalton Hill Fletton Parkway Peterborough

    Discharge of condition 14 (updated survey work) of planning permission 09/01369/OUT - Development of up to 65 hectares of employment land (B1, B2 and B8 including safeguarding of a site for a household recycling centre/park and ride). Associated highway infrastructure (including pedestrian, bridleway and cycle routes), and car parking for all uses. Foul and surface water drainage networks (including SuDS and lakes)

    Decided 24 Jul 2012 Conditions

Timeline

Dates from the published record

  1. 24 Aug 2012

    Received by Peterborough

  2. 3 Sep 2012

    Validated

    Checked as complete and ready for consideration.

  3. 7 Mar 2013

    Decision issued: Permitted

  4. 23 Jul 2026

    Added to PlanIndex

Cases linked to this one on the register

  • 09/01369/OUT Granted

    Land To The East Of Alwalton Hill Fletton Parkway Peterborough

    Development of up to 65 hectares of employment land (B1, B2 and B8 including safeguarding of a site for a household recycling centre/park and ride). Associated highway infrastructure (including pedestrian, bridleway and cycle routes), and car parking for all uses. Foul and surface water drainage networks (including SuDS and lakes)

    Decided 31 May 2011 Outline

1 later application on the register refers to this one:

  • 13/01118/WCPP Granted

    Land To The East Of Alwalton Hill Fletton Parkway Peterborough

    Variation of conditions 22 and 26 of planning approval 12/01334/WCPP (original conditions 21 and 25 of outline planning permission 09/01369/OUT) to change the timing of works to junction 17 of the A1(M) and junction1 of the Fletton Parkway to allow no more than 54 two way vehicle trips from the Great Haddon employment area between 8am and 9am

    Decided 17 Oct 2013 Full applications

Documents

Plans, drawings, consultee responses and the officer's report

130 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

Peterborough granted permission on 7 March 2013, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • Land To The East Of Alwalton Hill Fletton Parkway Peterborough

    11/01204/DISCHG Submitted 1 Aug 2011 50 yards away

    Discharge of conditions C11 (Great Crested Newt Stategy) and C12 (Biodiversity Strategy) of planning permission 09/01369/OUT - Development of up to 65 hectares of employment land (B1, B2 and B8 including safeguarding of a site for a household recycling centre/park and ride). Associated highway infrastructure (including pedestrian, bridleway and cycle routes), and car parking for all uses. Foul and surface water drainage networks (including SuDS and lakes)

    Decided Conditions 6 docs
  • Land To The East Of Alwalton Hill Fletton Parkway Peterborough

    09/01369/OUT Submitted 2 Dec 2009 50 yards away

    Development of up to 65 hectares of employment land (B1, B2 and B8 including safeguarding of a site for a household recycling centre/park and ride). Associated highway infrastructure (including pedestrian, bridleway and cycle routes), and car parking for all uses. Foul and surface water drainage networks (including SuDS and lakes)

    Granted Outline 236 docs
  • Land To The East Of Alwalton Hill Fletton Parkway Peterborough

    11/01349/DISCHG Submitted 25 Aug 2011 50 yards away

    Discharge of conditions 28(construction management plan) and 33(archaeological investigation) of planning permission 09/01369/OUT - Development of up to 65 hectares of employment land (B1, B2 and B8 including safeguarding of a site for a household recycling centre/park and ride). Associated highway infrastructure (including pedestrian, bridleway and cycle routes), and car parking for all uses. Foul and surface water drainage networks (including SuDS and lakes)

    Decided Conditions 9 docs
  • Land To The East Of Alwalton Hill Fletton Parkway Peterborough

    11/00925/DISCHG Submitted 17 Jun 2011 50 yards away

    Discharge of condition C11( Great Crested Newt Strategy) and C12 ( Biodiversity Strategy) of planning permission 09/01369/OUT - Development of up to 65 hectares of employment land (B1, B2 and B8 including safeguarding of a site for a household recycling centre/park and ride). Associated highway infrastructure (including pedestrian, bridleway and cycle routes), and car parking for all uses. Foul and surface water drainage networks (including SuDS and lakes)

    Decided Conditions 9 docs
  • Land To The East Of Alwalton Hill Fletton Parkway Peterborough

    12/00258/DISCHG Submitted 27 Feb 2012 50 yards away

    Discharge of condition 8 (Drainage) of Planning Permission 09/01369/OUT - (Development of up to 65 hectares of employment land (B1, B2 and B8 including safeguarding of a site for a household recycling centre/park and ride). Associated highway infrastructure (including pedestrian, bridleway and cycle routes), and car parking for all uses. Foul and surface water drainage networks (including SuDS and lakes))

    Decided Conditions 35 docs
  • Land To The East Of Alwalton Hill Fletton Parkway Peterborough

    12/00270/DISCHG Submitted 22 Feb 2012 50 yards away

    Discharge of condition C21 ( Junction 1 works) of planning permission 09/01369/OUT - Development of up to 65 hectares of employment land (B1, B2 and B8 including safeguarding of a site for a household recycling centre/park and ride). Associated highway infrastructure (including pedestrian, bridleway and cycle routes), and car parking for all uses. Foul and surface water drainage networks (including SuDS and lakes)

    Decided Conditions 49 docs

In Peterborough

  • 26/002920/FUL Awaiting decision

    400, Eastfield Road, Peterborough, PE1 4RE

    Proposed new dwelling and associated access

    22 Sep 2026 Full applications
  • 26/002904/FUL Awaiting decision

    Land Adjacent to 16 Russell Hill, Thornhaugh, Peterborough, PE8 6HL

    Change of use of land to provide a small-scale glamping development, comprising

    Received 21 Sep, published by the council 22 Sep 2026 Full applications
  • 26/002562/FUL Granted

    16 Commerce Road Lynch Wood Peterborough PE2 6LR

    External alterations comprising the recladding of the main entrance, the erectio

    Received 3 Jul, published by the council 23 Jul 2026 Full applications
  • 26/002898/FUL Status unknown

    2 Peterborough Road Eye Peterborough PE6 7YB

    Replacement of existing enclosed pergola with a single storey extension

    17 Sep 2026 Full applications
  • 26/002901/FUL Status unknown

    Amazon EUK1 Flaxley Road, Peterborough, PE2 9EN

    Minor external alterations and associated works to the existing B8 warehouse an

    17 Sep 2026 Full applications