Skip to content
PlanIndex Get alerts
Menu

Planning application

Phase 4, M Land,Land To The North Of Norman Cross London Road Peterborough

Awaiting decision Peterborough 26/002921/DISCHG Compliance with Planning Condition(s)

Relates to 09/01368/OUT

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

09/01368/OUT - Discharge of conditions C23 (site specific construction management plan) and C38 (existing and proposed site levels)

As published by the council, reference 26/002921/DISCHG

Application record

Reference
26/002921/DISCHG
Type
Compliance with Planning Condition(s)
Status
Under Consultation
Received
18 Sep 2026
Validated
21 Sep 2026

Site history

Applications at this address on the Peterborough register

This site has had 4 applications since 2025: 1 approved, 0 refused.

  • 26/003121/DISCHG Awaiting decision

    Phase 4, M Land,Land To The North Of Norman Cross London Road Peterborough

    25/01457/REM - Discharge of condition C4 (materials) of reserved matters consent 25/01457/REM

    Submitted 2 Nov 2026 Conditions
  • 26/002899/DISCHG Awaiting decision

    Phase 4, M Land, Land To The North Of Norman Cross, London Road, Peterborough

    25/01457/REM - Discharge of conditions C2 (western SUDs pond)

    Submitted 16 Sep 2026 Conditions
  • 25/01457/REM Granted

    Phase 4 M Land Land To The North Of Norman Cross London Road Peterborough

    Reserved matters approval (appearance, access, landscaping, layout and scale) for the erection of 172 dwellings and associated infrastructure for Phase 4 of M-Land pursuant to outline planning permission 09/01368/OUT

    Decided 5 Jun 2026 Reserved matters

Timeline

Dates from the published record

  1. 18 Sep 2026

    Received by Peterborough

  2. 21 Sep 2026

    Validated

    Checked as complete and ready for consideration.

  3. 22 Sep 2026

    Added to PlanIndex

  4. 15 Nov 2026

    Status changed to Under Consultation

    Previously Awaiting Allocation.

  5. Decision

    Awaiting decision

    Decision expected by 16 November 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Peterborough took a median of 54 days over the applications it decided in the last year.

Cases linked to this one on the register

  • 09/01368/OUT Granted

    Land To The North Of Norman Cross London Road Peterborough

    Development of an urban extension comprising up to 5350 residential dwellings, a district centre (with up to 9200 square metres (99031 sq.ft) retail floor space) and two neighbourhood centres (with up to 2300 square metres (24758 sq.ft) retail floor space) comprising district/neighbourhood retail (A1-A5), community and health (C2, D1), leisure(D2), residential (C3) and commercial (B1) uses. Provision for education facilities (sites for three primary and one secondary school), sports and recreational facilities, a range of strategic open spaces including new landscaping , woodland and allotments, and cemetary provision. Associated highway infrastructure (including pedestrian, bridleway and cycle routes), public transport infrastructure and car parking for all uses. Utilities and renewable energy infrastructure; foul and surface water drainage networks (including SuDS and lakes)

    Decided 23 Jul 2018 Outline

Documents

17 documents on file for this application

A planning file usually holds the application form, the consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

Working a patch? Trade sends you every new job in your area each morning. 14 days free.

What happens while it is decided

This application is with Peterborough for determination, against a statutory target of eight weeks. Over the last year Peterborough decided condition discharge and variation applications in a median of 58 days. More in our guide to how long planning decisions take.

About condition discharge and variation applications

This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

In Peterborough

  • Land O, Land To The North Of Norman Cross London Road Peterborough

    09/01368/OUT - Part discharge of condition C.59a (archaeological mitigation strategy WSI) ownership area O

    Received 22 Sep, published by the council 24 Sep 2026 Conditions
  • Land O, Phase 4a, Land To The North Of Norman Cross London Road Peterborough

    09/01368/OUT - Discharge of condition c59a (archaeological mitigation strategy) of outline planning permission 09/01368/OUT

    Received 22 Sep, published by the council 23 Sep 2026 Conditions
  • 26/002808/DISCHG Withdrawn

    Land O, Land To The North Of Norman Cross, Great Haddon, London Road, Peterborough

    09/01368/OUT - Part-discharge of condition C23 (Site Specific Construction Management Plan)

    Received 24 Aug, published by the council 25 Aug 2026 Conditions
  • The Old Chapel The Causeway Thorney Peterborough

    26/002583/FUL - Discharge of conditions C3 (external materials) and C4 (soft landscaping)

    Received 23 Sep, published by the council 24 Sep 2026 Conditions
  • Parcel R09, Phase 4 Hampton Woods, Peterborough

    22/00072/REM - Part discharge of condition C9 (Remediation)

    Received 18 Sep, published by the council 21 Sep 2026 Conditions