Planning application
Land To The East Of Alwalton Hill Fletton Parkway Peterborough
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Construction of a primary electricity supply station and foul water pumping station
As published by the council, reference 13/00713/FUL
Application record
- Reference
- 13/00713/FUL
- Type
- Planning Application (Full)
- Status
- Decided
- Decision
- Permitted
- Received
- 4 Jul 2013
- Validated
- 4 Jul 2013
- Decided
- 29 Aug 2013
- Ward
- Orton With Hampton
- Parish
- Peterborough
- Decision by
- Delegated Decision (Officer)
Site history
Applications at this address on the Peterborough register
This site has had 28 applications since 2009: 12 approved, 0 refused.
-
22/01169/MDOBL Granted
Land To The East Of Alwalton Hill Fletton Parkway Peterborough
Modifications to the Great Haddon S106 Agreement associated with 15/01672/WCPP
-
19/01651/NONMAT Decided
Land To The East Of Alwalton Hill Fletton Parkway Peterborough
Non material amendment ( additional process specific external plan and external storage) to planning permission 17/01759/REM
-
13/01428/DISCHG Decided
Land To The East Of Alwalton Hill Fletton Parkway Peterborough
Discharge of condition C2 (drainage) of planning permission 11/00943/REM - Landscaping of plot OS2
-
13/01387/DISCHG Decided
Land To The East Of Alwalton Hill Fletton Parkway Peterborough
Discharge of condition 3 (Archaeology) and condition 4 (Construction Management Plan) of planning permission 13/00713/FUL Construction of a Primary Electricity Sub Station and Foul Water Pumping Station
-
13/01118/WCPP Granted
Land To The East Of Alwalton Hill Fletton Parkway Peterborough
Variation of conditions 22 and 26 of planning approval 12/01334/WCPP (original conditions 21 and 25 of outline planning permission 09/01369/OUT) to change the timing of works to junction 17 of the A1(M) and junction1 of the Fletton Parkway to allow no more than 54 two way vehicle trips from the Great Haddon employment area between 8am and 9am
-
12/01334/WCPP Granted
Land To The East Of Alwalton Hill Fletton Parkway Peterborough
Variation of condition 5 of outline planning permission 09/01369/OUT to allow a higher building (not exceeding 35m) to be built on plot E2.1 to meet the requirements of an occupier. The first sentence of condition 5 would read - Building heights shall not exceed a maximum height of 15 m except on plot E7 where the maximum height shall not exceed 17 m and on plot E2.1 where the maximum height shall not exceed 35 m
-
12/01309/FUL Granted
Land To The East Of Alwalton Hill Fletton Parkway Peterborough
Temporary drainage works
-
12/01213/REM Granted
Land To The East Of Alwalton Hill Fletton Parkway Peterborough
Construction of access road, south part, with attenuation pond
-
12/00984/DISCHG Decided
Land To The East Of Alwalton Hill Fletton Parkway Peterborough
Discharge of conditions C4 (Drainage) and C7 (Arboricultural impacts) of Planning Permission 11/02049/REM (Construction of initial section of the internal access road from Junction 1 of the Fletton Parkway)
-
12/00957/DISCHG Decided
Land To The East Of Alwalton Hill Fletton Parkway Peterborough
Discharge of condition 14 (updated survey work) of planning permission 09/01369/OUT - Development of up to 65 hectares of employment land (B1, B2 and B8 including safeguarding of a site for a household recycling centre/park and ride). Associated highway infrastructure (including pedestrian, bridleway and cycle routes), and car parking for all uses. Foul and surface water drainage networks (including SuDS and lakes)
Timeline
Dates from the published record
-
4 Jul 2013
Received by Peterborough
-
29 Aug 2013
Decision issued: Permitted
-
11 Sep 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
29 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat this grant of permission means
Peterborough granted permission on 29 August 2013, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
Land To The East Of Alwalton Hill Fletton Parkway Peterborough
Discharge of condition 3 (Archaeology) and condition 4 (Construction Management Plan) of planning permission 13/00713/FUL Construction of a Primary Electricity Sub Station and Foul Water Pumping Station
Decided Conditions 19 docs -
Street Record Goldhay Way Orton Goldhay Peterborough
Upgrade of existing site comprising installation of a new cabinet measuring 1200W x 480D x 700H millimetres coloured grey adjacent to the existing streetworks pole and cabinets and the replacement of existing antenna in the streetworks pole
Decided Prior approval 5 docs -
Cell Ref. 25295 Goldhay Way Orton Goldhay Peterborough
The addition of 1x link A/C cabinet at the existing telecommunications base station
Decided Prior approval 1 doc -
Communication Station Site 034779 Newcombe Way Orton Southgate Peterborough
Replacement of 1 no. 17.5m high macrocell and 6 no. antennas with 1 no. 17.5m macrocell and 6 no. antennas and replacement of 2 no. ancillary equipment cabinets
Decided Prior approval 13 docs -
Land To The East Of Alwalton Hill Fletton Parkway Peterborough
Discharge of conditions C4 (Drainage) and C7 (Arboricultural impacts) of Planning Permission 11/02049/REM (Construction of initial section of the internal access road from Junction 1 of the Fletton Parkway)
Decided Conditions 28 docs -
Land To The East Of Alwalton Hill Fletton Parkway Peterborough
Construction of initial section of the internal access road from junction 1 of the Fletton Parkway to serve Great Haddon and Alwalton Hill including an associated diversion of the existing bridleway, provision of manual tunnels and landscaping. Amended alignment to that approved under 10/00320/REM to relocate the internal roundabout some 80 metres to the north. The outline application was accompanied by an Environmental Statement
Granted Reserved matters 49 docs
Other full applications
In Peterborough
-
26/002898/FUL Status unknown
2 Peterborough Road Eye Peterborough PE6 7YB
Replacement of existing enclosed pergola with a permanent building
-
26/002901/FUL Status unknown
Amazon EUK1 Flaxley Road, Peterborough, PE2 9EN
Minor external alterations and associated works to the existing B8 warehouse an
-
26/002003/FUL Refused
BUFFINGHAM MINIATURE SCHNAUZERS, Buffingham Kennels, Waterworks Lane, Glinton, Peterborough, PE6 7LP
Proposed continuation of use of land and siting of mobile home in connection with and use of land, kennels and associated fencing and parking as licensed establishment for breeding dogs
-
26/002847/FUL Awaiting decision
DALTON SEEDS, Dalmark House, Thorney Road, Eye, Peterborough, PE6 7UD
Proposed extension to grain store building, including associated attenuation lag
-
26/001984/FUL Granted
63 Ayres Drive Stanground Peterborough PE2 8JS
Change of use from C3 dwelling to a C2 small childrens home for up to 2 children