Planning application
11/01204/DISCHG
Land To The East Of Alwalton Hill Fletton Parkway Peterborough
Proposal
Discharge of conditions C11 (Great Crested Newt Stategy) and C12 (Biodiversity Strategy) of planning permission 09/01369/OUT - Development of up to 65 hectares of employment land (B1, B2 and B8 including safeguarding of a site for a household recycling centre/park and ride). Associated highway infrastructure (including pedestrian, bridleway and cycle routes), and car parking for all uses. Foul and surface water drainage networks (including SuDS and lakes)
As published by the council, reference 11/01204/DISCHG
Timeline
Dates from the published record
-
1 Aug 2011
Received by Peterborough
-
24 Aug 2011
Decision issued: Determined
-
28 Jul 2026
Added to PlanIndex
After the decision
The process from here
The council has decided this application; the published outcome sits in the record above and the decision notice on the council portal carries the detail, including any conditions.
If permission was granted, work must normally begin within three years of the decision. If it was refused, the applicant can appeal within the statutory time limit or submit a revised scheme.
About conditions applications
How this application type works
This type of application deals with conditions attached to an existing permission, either by supplying the details a condition requires, called discharging it, or by asking to vary or remove one. It does not reopen the principle of the permission itself. Building often cannot lawfully start, or continue past a set stage, until the named conditions are discharged.
Nearby applications
Within 500 metres
-
11/01349/DISCHG Decided
Land To The East Of Alwalton Hill Fletton Parkway Peterborough
Discharge of conditions 28(construction management plan) and 33(archaeological investigation) of planning permission 09/01369/OUT - Development of up to 65 hectares of employment land (B1, B2 and B8 including safeguarding of a site for a household recycling centre/park and ride). Associated highway infrastructure (including pedestrian, bridleway and cycle routes), and car parking for all uses. Foul and surface water drainage networks (including SuDS and lakes)
-
11/00925/DISCHG Decided
Land To The East Of Alwalton Hill Fletton Parkway Peterborough
Discharge of condition C11( Great Crested Newt Strategy) and C12 ( Biodiversity Strategy) of planning permission 09/01369/OUT - Development of up to 65 hectares of employment land (B1, B2 and B8 including safeguarding of a site for a household recycling centre/park and ride). Associated highway infrastructure (including pedestrian, bridleway and cycle routes), and car parking for all uses. Foul and surface water drainage networks (including SuDS and lakes)
-
12/00258/DISCHG Decided
Land To The East Of Alwalton Hill Fletton Parkway Peterborough
Discharge of condition 8 (Drainage) of Planning Permission 09/01369/OUT - (Development of up to 65 hectares of employment land (B1, B2 and B8 including safeguarding of a site for a household recycling centre/park and ride). Associated highway infrastructure (including pedestrian, bridleway and cycle routes), and car parking for all uses. Foul and surface water drainage networks (including SuDS and lakes))
-
12/01334/WCPP Granted
Land To The East Of Alwalton Hill Fletton Parkway Peterborough
Variation of condition 5 of outline planning permission 09/01369/OUT to allow a higher building (not exceeding 35m) to be built on plot E2.1 to meet the requirements of an occupier. The first sentence of condition 5 would read - Building heights shall not exceed a maximum height of 15 m except on plot E7 where the maximum height shall not exceed 17 m and on plot E2.1 where the maximum height shall not exceed 35 m
-
12/00270/DISCHG Decided
Land To The East Of Alwalton Hill Fletton Parkway Peterborough
Discharge of condition C21 ( Junction 1 works) of planning permission 09/01369/OUT - Development of up to 65 hectares of employment land (B1, B2 and B8 including safeguarding of a site for a household recycling centre/park and ride). Associated highway infrastructure (including pedestrian, bridleway and cycle routes), and car parking for all uses. Foul and surface water drainage networks (including SuDS and lakes)
-
11/01057/DISCHG Decided
Land To The East Of Alwalton Hill Fletton Parkway Peterborough
Discharge of condition C17 (Landscape Management Plan) of planning permission 09/01369/OUT - Development of up to 65 hectares of employment land (B1, B2 and B8 including safeguarding of a site for a household recycling centre/park and ride). Associated highway infrastructure (including pedestrian, bridleway and cycle routes), and car parking for all uses. Foul and surface water drainage networks (including SuDS and lakes)
Other conditions applications
In Peterborough
-
26/002425/DISCHG Decided
11, North Fen Road, Glinton, Peterborough, PE6 7JL
23/00504/HHFUL Discharge of conditions C5 (Boundary wall) C8 (Highways) and C9 (Existing access) to planning permission 23/00504/HHFUL
-
26/002665/DISCHG Awaiting decision
The Cherry Tree, 9 Oundle Road, Woodston Peterborough
25/00416/FUL - Discharge of condition C8 (Soft Landscaping)
-
26/002662/DISCHG Awaiting decision
Burghley Park Golf Club, Burghley Park, Stamford Road, Pilsgate, Stamford, PE9 3JX
25/00702/FUL - Discharge of conditions C4 (biodiversity net gain plan) and C5 (habitat management and monitoring plan(HMMP))
-
26/002498/DISCHG Decided
Former Peterborough Market and Car Park Site Northminster Peterborough
21/01151/R4OUT - Discharge of condition C23 (validation report)
-
26/002356/DISCHG Decided
Land Off Thorpe Wood, Earlham Road, Peterborough, PE3 6SR
25/00303/FUL - Discharge of condition C12 (soft landscaping)