Skip to content
PlanIndex Get alerts
Menu

Planning application

Land To The East Of Alwalton Hill Fletton Parkway Peterborough

Decided Peterborough 19/01651/NONMAT Non-Material Amendment

Decided. The decision notice on the council portal carries the outcome in full, including any conditions.

Proposal

Non material amendment ( additional process specific external plan and external storage) to planning permission 17/01759/REM

As published by the council, reference 19/01651/NONMAT

Application record

Reference
19/01651/NONMAT
Type
Non-Material Amendment
Status
Determined
Decision
Determined
Received
1 Nov 2019
Validated
1 Nov 2019
Decided
28 Nov 2019
Ward
Hampton Vale
Parish
Peterborough
Decision by
Delegated Decision (Officer)

Site history

Applications at this address on the Peterborough register

This site has had 28 applications since 2009: 12 approved, 0 refused.

  • 22/01169/MDOBL Granted

    Land To The East Of Alwalton Hill Fletton Parkway Peterborough

    Modifications to the Great Haddon S106 Agreement associated with 15/01672/WCPP

    Decided 14 Feb 2023 Conditions
  • 13/01428/DISCHG Decided

    Land To The East Of Alwalton Hill Fletton Parkway Peterborough

    Discharge of condition C2 (drainage) of planning permission 11/00943/REM - Landscaping of plot OS2

    Decided 1 Nov 2013 Conditions
  • 13/01387/DISCHG Decided

    Land To The East Of Alwalton Hill Fletton Parkway Peterborough

    Discharge of condition 3 (Archaeology) and condition 4 (Construction Management Plan) of planning permission 13/00713/FUL Construction of a Primary Electricity Sub Station and Foul Water Pumping Station

    Decided 25 Nov 2013 Conditions
  • 13/01118/WCPP Granted

    Land To The East Of Alwalton Hill Fletton Parkway Peterborough

    Variation of conditions 22 and 26 of planning approval 12/01334/WCPP (original conditions 21 and 25 of outline planning permission 09/01369/OUT) to change the timing of works to junction 17 of the A1(M) and junction1 of the Fletton Parkway to allow no more than 54 two way vehicle trips from the Great Haddon employment area between 8am and 9am

    Decided 17 Oct 2013 Full applications
  • 13/00713/FUL Granted

    Land To The East Of Alwalton Hill Fletton Parkway Peterborough

    Construction of a primary electricity supply station and foul water pumping station

    Decided 29 Aug 2013 Full applications
  • 12/01334/WCPP Granted

    Land To The East Of Alwalton Hill Fletton Parkway Peterborough

    Variation of condition 5 of outline planning permission 09/01369/OUT to allow a higher building (not exceeding 35m) to be built on plot E2.1 to meet the requirements of an occupier. The first sentence of condition 5 would read - Building heights shall not exceed a maximum height of 15 m except on plot E7 where the maximum height shall not exceed 17 m and on plot E2.1 where the maximum height shall not exceed 35 m

    Decided 7 Mar 2013 Full applications
  • 12/01309/FUL Granted

    Land To The East Of Alwalton Hill Fletton Parkway Peterborough

    Temporary drainage works

    Decided 12 Oct 2012 Full applications
  • 12/01213/REM Granted

    Land To The East Of Alwalton Hill Fletton Parkway Peterborough

    Construction of access road, south part, with attenuation pond

    Decided 3 Jan 2013 Reserved matters
  • 12/00984/DISCHG Decided

    Land To The East Of Alwalton Hill Fletton Parkway Peterborough

    Discharge of conditions C4 (Drainage) and C7 (Arboricultural impacts) of Planning Permission 11/02049/REM (Construction of initial section of the internal access road from Junction 1 of the Fletton Parkway)

    Decided 16 Aug 2012 Conditions
  • 12/00957/DISCHG Decided

    Land To The East Of Alwalton Hill Fletton Parkway Peterborough

    Discharge of condition 14 (updated survey work) of planning permission 09/01369/OUT - Development of up to 65 hectares of employment land (B1, B2 and B8 including safeguarding of a site for a household recycling centre/park and ride). Associated highway infrastructure (including pedestrian, bridleway and cycle routes), and car parking for all uses. Foul and surface water drainage networks (including SuDS and lakes)

    Decided 24 Jul 2012 Conditions

Timeline

Dates from the published record

  1. 1 Nov 2019

    Received by Peterborough

  2. 28 Nov 2019

    Decision issued: Determined

  3. 15 Aug 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Roxhill Peterborough Ltd Agent, registered in Kenilworth

Active · incorporated 2010 · Kenilworth

1 application on PlanIndex

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

10 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

After the decision

Peterborough has decided this application; the outcome above is the register's own wording and the decision notice on the council portal carries the detail. More in our guide to what happens after a planning decision.

About amendment applications

An amendment application makes limited changes to a permission that already exists; anything beyond modest adjustment needs a fresh application. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • Unit 4 Forli Strada Alwalton Hill Peterborough PE7 3HH

    24/01349/NONMAT Submitted 17 Oct 2024 50 yards away

    Non Material amendment (weather canopy installation and HPL cladding to external plant enclosure) to planning permission 19/00704/REM

    Decided Amendments 10 docs
  • Land Within Great Haddon Development And Tear Drop Lake Hampton Peterborough

    21/00012/SCREEN Submitted 9 Sep 2021 50 yards away

    Screening request: Installation of a new rising main between OH Land within the Great Haddon Development and Tear Drop Lake, Hampton

    Decided Outline 13 docs
  • Land To The East Of Alwalton Hill Fletton Parkway Peterborough

    22/01169/MDOBL Submitted 12 Aug 2022 50 yards away

    Modifications to the Great Haddon S106 Agreement associated with 15/01672/WCPP

    Granted Conditions 7 docs
  • Plot 302B Waterworth Road Alwalton Hill Peterborough

    22/01140/FUL Submitted 10 Aug 2022 50 yards away

    Erection of B8 warehouse with ancillary office accommodation and associated works

    Granted Full applications 44 docs
  • Plot 7 Great Haddon Employment Area Fletton Parkway Peterborough

    11/00817/REM Submitted 1 Jun 2011 100 yards away

    Details of a new access road from junction 1 of the Fletton Parkway to plot 7 and details of the erection of a new warehouse on plot 7 with associated car parking, landscaping and ancillary works - all reserved matters pursuant to outline planning permission 09/01369/OUT (development of 65 hectares of employment land). An environmental statement accompanied the outline application

    Granted Reserved matters 149 docs
  • Land To The East Of Alwalton Hill Fletton Parkway Peterborough

    11/01204/DISCHG Submitted 1 Aug 2011 150 yards away

    Discharge of conditions C11 (Great Crested Newt Stategy) and C12 (Biodiversity Strategy) of planning permission 09/01369/OUT - Development of up to 65 hectares of employment land (B1, B2 and B8 including safeguarding of a site for a household recycling centre/park and ride). Associated highway infrastructure (including pedestrian, bridleway and cycle routes), and car parking for all uses. Foul and surface water drainage networks (including SuDS and lakes)

    Decided Conditions 6 docs

In Peterborough

  • 26/002918/NONMAT Awaiting decision

    Land To The North Of Norman Cross London Road Peterborough

    24/00535/REM - Non material amendment (revisions to right hand side elevation of Type 13.0 corner turner housetype)

    Received 17 Sep, published by the council 2 Oct 2026 Amendments
  • 26/002834/NONMAT Awaiting decision

    25 - 26, Long Causeway, Peterborough, PE1 1YJ

    26/002123/FUL - Non Material Amendment (Changes to shopfront design and signage

    Received 3 Sep, published by the council 7 Sep 2026 Amendments
  • CASTOR AND AILSWORTH CRICKET CLUB, Castor And Ailsworth Cricket Club, Port Lane, Castor, Peterborough, PE5 7AP

    21/01299/FUL - Non-Material Amendment (Approved plans)

    Received 12 Aug, published by the council 25 Aug 2026 Amendments
  • 5, Sebrights Way, Peterborough, PE3 9BT

    24/00502/HHFUL - Non Material amendment (Increase width of proposed garage wall,

    Received 3 Aug, published by the council 7 Aug 2026 Amendments
  • Unit 3, Waterworth Road, Alwalton Hill, Peterborough, PE7 3AG

    25/01593/FUL - Non material amendment (reduction in size of approved mezzanine a

    Received 27 Jul, published by the council 30 Jul 2026 Amendments