Planning application
Land To The East Of Alwalton Hill Fletton Parkway Peterborough
Relates to 12/01334/WCPP, 09/01369/OUT
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Variation of conditions 22 and 26 of planning approval 12/01334/WCPP (original conditions 21 and 25 of outline planning permission 09/01369/OUT) to change the timing of works to junction 17 of the A1(M) and junction1 of the Fletton Parkway to allow no more than 54 two way vehicle trips from the Great Haddon employment area between 8am and 9am
As published by the council, reference 13/01118/WCPP
Application record
- Reference
- 13/01118/WCPP
- Type
- Without Compliance (Planning Permission)
- Status
- Decided
- Decision
- Granted As published: Permitted
- Received
- 1 Aug 2013
- Validated
- 6 Aug 2013
- Decided
- 17 Oct 2013
- Ward
- Orton With Hampton
- Parish
- Peterborough
- Decision by
- Delegated Decision (Officer)
Site history
Applications at this address on the Peterborough register
This site has had 28 applications since 2009: 12 approved, 0 refused.
-
22/01169/MDOBL Granted
Land To The East Of Alwalton Hill Fletton Parkway Peterborough
Modifications to the Great Haddon S106 Agreement associated with 15/01672/WCPP
-
19/01651/NONMAT Decided
Land To The East Of Alwalton Hill Fletton Parkway Peterborough
Non material amendment ( additional process specific external plan and external storage) to planning permission 17/01759/REM
-
13/01428/DISCHG Decided
Land To The East Of Alwalton Hill Fletton Parkway Peterborough
Discharge of condition C2 (drainage) of planning permission 11/00943/REM - Landscaping of plot OS2
-
13/01387/DISCHG Decided
Land To The East Of Alwalton Hill Fletton Parkway Peterborough
Discharge of condition 3 (Archaeology) and condition 4 (Construction Management Plan) of planning permission 13/00713/FUL Construction of a Primary Electricity Sub Station and Foul Water Pumping Station
-
13/00713/FUL Granted
Land To The East Of Alwalton Hill Fletton Parkway Peterborough
Construction of a primary electricity supply station and foul water pumping station
-
12/01334/WCPP Granted
Land To The East Of Alwalton Hill Fletton Parkway Peterborough
Variation of condition 5 of outline planning permission 09/01369/OUT to allow a higher building (not exceeding 35m) to be built on plot E2.1 to meet the requirements of an occupier. The first sentence of condition 5 would read - Building heights shall not exceed a maximum height of 15 m except on plot E7 where the maximum height shall not exceed 17 m and on plot E2.1 where the maximum height shall not exceed 35 m
-
12/01309/FUL Granted
Land To The East Of Alwalton Hill Fletton Parkway Peterborough
Temporary drainage works
-
12/01213/REM Granted
Land To The East Of Alwalton Hill Fletton Parkway Peterborough
Construction of access road, south part, with attenuation pond
-
12/00984/DISCHG Decided
Land To The East Of Alwalton Hill Fletton Parkway Peterborough
Discharge of conditions C4 (Drainage) and C7 (Arboricultural impacts) of Planning Permission 11/02049/REM (Construction of initial section of the internal access road from Junction 1 of the Fletton Parkway)
-
12/00957/DISCHG Decided
Land To The East Of Alwalton Hill Fletton Parkway Peterborough
Discharge of condition 14 (updated survey work) of planning permission 09/01369/OUT - Development of up to 65 hectares of employment land (B1, B2 and B8 including safeguarding of a site for a household recycling centre/park and ride). Associated highway infrastructure (including pedestrian, bridleway and cycle routes), and car parking for all uses. Foul and surface water drainage networks (including SuDS and lakes)
Timeline
Dates from the published record
-
1 Aug 2013
Received by Peterborough
-
6 Aug 2013
Validated
Checked as complete and ready for consideration.
-
17 Oct 2013
Decision issued: Permitted
-
11 Sep 2026
Added to PlanIndex
Related applications
Cases linked to this one on the register
-
12/01334/WCPP Granted
Land To The East Of Alwalton Hill Fletton Parkway Peterborough
Variation of condition 5 of outline planning permission 09/01369/OUT to allow a higher building (not exceeding 35m) to be built on plot E2.1 to meet the requirements of an occupier. The first sentence of condition 5 would read - Building heights shall not exceed a maximum height of 15 m except on plot E7 where the maximum height shall not exceed 17 m and on plot E2.1 where the maximum height shall not exceed 35 m
-
09/01369/OUT Granted
Land To The East Of Alwalton Hill Fletton Parkway Peterborough
Development of up to 65 hectares of employment land (B1, B2 and B8 including safeguarding of a site for a household recycling centre/park and ride). Associated highway infrastructure (including pedestrian, bridleway and cycle routes), and car parking for all uses. Foul and surface water drainage networks (including SuDS and lakes)
Documents
Plans, drawings, consultee responses and the officer's report
75 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Peterborough granted permission on 17 October 2013, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Land To The East Of Alwalton Hill Fletton Parkway Peterborough
Discharge of conditions C11 (Great Crested Newt Stategy) and C12 (Biodiversity Strategy) of planning permission 09/01369/OUT - Development of up to 65 hectares of employment land (B1, B2 and B8 including safeguarding of a site for a household recycling centre/park and ride). Associated highway infrastructure (including pedestrian, bridleway and cycle routes), and car parking for all uses. Foul and surface water drainage networks (including SuDS and lakes)
Decided Conditions 6 docs -
Land To The East Of Alwalton Hill Fletton Parkway Peterborough
Development of up to 65 hectares of employment land (B1, B2 and B8 including safeguarding of a site for a household recycling centre/park and ride). Associated highway infrastructure (including pedestrian, bridleway and cycle routes), and car parking for all uses. Foul and surface water drainage networks (including SuDS and lakes)
Granted Outline 236 docs -
Land To The East Of Alwalton Hill Fletton Parkway Peterborough
Discharge of conditions 28(construction management plan) and 33(archaeological investigation) of planning permission 09/01369/OUT - Development of up to 65 hectares of employment land (B1, B2 and B8 including safeguarding of a site for a household recycling centre/park and ride). Associated highway infrastructure (including pedestrian, bridleway and cycle routes), and car parking for all uses. Foul and surface water drainage networks (including SuDS and lakes)
Decided Conditions 9 docs -
Land To The East Of Alwalton Hill Fletton Parkway Peterborough
Discharge of condition C11( Great Crested Newt Strategy) and C12 ( Biodiversity Strategy) of planning permission 09/01369/OUT - Development of up to 65 hectares of employment land (B1, B2 and B8 including safeguarding of a site for a household recycling centre/park and ride). Associated highway infrastructure (including pedestrian, bridleway and cycle routes), and car parking for all uses. Foul and surface water drainage networks (including SuDS and lakes)
Decided Conditions 9 docs -
Land To The East Of Alwalton Hill Fletton Parkway Peterborough
Discharge of condition 8 (Drainage) of Planning Permission 09/01369/OUT - (Development of up to 65 hectares of employment land (B1, B2 and B8 including safeguarding of a site for a household recycling centre/park and ride). Associated highway infrastructure (including pedestrian, bridleway and cycle routes), and car parking for all uses. Foul and surface water drainage networks (including SuDS and lakes))
Decided Conditions 35 docs -
Land To The East Of Alwalton Hill Fletton Parkway Peterborough
Variation of condition 5 of outline planning permission 09/01369/OUT to allow a higher building (not exceeding 35m) to be built on plot E2.1 to meet the requirements of an occupier. The first sentence of condition 5 would read - Building heights shall not exceed a maximum height of 15 m except on plot E7 where the maximum height shall not exceed 17 m and on plot E2.1 where the maximum height shall not exceed 35 m
Granted Full applications 130 docs
Other full applications
In Peterborough
-
26/002951/FUL Status unknown
Land East of Staplee Way, Parnwell, Peterborough, PE1 4YT
Erection of 4no. B2/B8 Buildings with Associated Works
-
26/002968/FUL Status unknown
331 Lincoln Road Peterborough PE1 2PF
Proposed Change of Use from Class E to Sui Generis Adult Gaming Centre (AGC), sh
-
26/002999/FUL Status unknown
Limes Farm, Main Street, Barnack, Stamford, PE9 3DN
Demolition of predominantly modern farm buildings to enable partial site redevel
-
26/002739/FUL Refused
88 Sycamore Avenue Dogsthorpe Peterborough PE1 4JU
Change of use from C3 to C2 (children's Home)
-
26/002960/FUL Awaiting decision
Land Adjacent to 75, High Street, Maxey, Peterborough, PE6 9EE
Erection of a one and a half storey detached dwelling with integral garage