Granted Peterborough 13/01118/WCPP Without Compliance (Planning Permission)

Relates to 12/01334/WCPP, 09/01369/OUT

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Variation of conditions 22 and 26 of planning approval 12/01334/WCPP (original conditions 21 and 25 of outline planning permission 09/01369/OUT) to change the timing of works to junction 17 of the A1(M) and junction1 of the Fletton Parkway to allow no more than 54 two way vehicle trips from the Great Haddon employment area between 8am and 9am

As published by the council, reference 13/01118/WCPP

Application record

Reference
13/01118/WCPP
Type
Without Compliance (Planning Permission)
Status
Decided
Decision
Permitted
Received
1 Aug 2013
Validated
6 Aug 2013
Decided
17 Oct 2013
Ward
Orton With Hampton
Parish
Peterborough
Decision by
Delegated Decision (Officer)

Site history

Applications at this address on the Peterborough register

This site has had 28 applications since 2009: 12 approved, 0 refused.

  • 22/01169/MDOBL Granted

    Land To The East Of Alwalton Hill Fletton Parkway Peterborough

    Modifications to the Great Haddon S106 Agreement associated with 15/01672/WCPP

    Decided 14 Feb 2023 Conditions
  • 19/01651/NONMAT Decided

    Land To The East Of Alwalton Hill Fletton Parkway Peterborough

    Non material amendment ( additional process specific external plan and external storage) to planning permission 17/01759/REM

    Decided 28 Nov 2019 Amendments
  • 13/01428/DISCHG Decided

    Land To The East Of Alwalton Hill Fletton Parkway Peterborough

    Discharge of condition C2 (drainage) of planning permission 11/00943/REM - Landscaping of plot OS2

    Decided 1 Nov 2013 Conditions
  • 13/01387/DISCHG Decided

    Land To The East Of Alwalton Hill Fletton Parkway Peterborough

    Discharge of condition 3 (Archaeology) and condition 4 (Construction Management Plan) of planning permission 13/00713/FUL Construction of a Primary Electricity Sub Station and Foul Water Pumping Station

    Decided 25 Nov 2013 Conditions
  • 13/00713/FUL Granted

    Land To The East Of Alwalton Hill Fletton Parkway Peterborough

    Construction of a primary electricity supply station and foul water pumping station

    Decided 29 Aug 2013 Full applications
  • 12/01334/WCPP Granted

    Land To The East Of Alwalton Hill Fletton Parkway Peterborough

    Variation of condition 5 of outline planning permission 09/01369/OUT to allow a higher building (not exceeding 35m) to be built on plot E2.1 to meet the requirements of an occupier. The first sentence of condition 5 would read - Building heights shall not exceed a maximum height of 15 m except on plot E7 where the maximum height shall not exceed 17 m and on plot E2.1 where the maximum height shall not exceed 35 m

    Decided 7 Mar 2013 Full applications
  • 12/01309/FUL Granted

    Land To The East Of Alwalton Hill Fletton Parkway Peterborough

    Temporary drainage works

    Decided 12 Oct 2012 Full applications
  • 12/01213/REM Granted

    Land To The East Of Alwalton Hill Fletton Parkway Peterborough

    Construction of access road, south part, with attenuation pond

    Decided 3 Jan 2013 Reserved matters
  • 12/00984/DISCHG Decided

    Land To The East Of Alwalton Hill Fletton Parkway Peterborough

    Discharge of conditions C4 (Drainage) and C7 (Arboricultural impacts) of Planning Permission 11/02049/REM (Construction of initial section of the internal access road from Junction 1 of the Fletton Parkway)

    Decided 16 Aug 2012 Conditions
  • 12/00957/DISCHG Decided

    Land To The East Of Alwalton Hill Fletton Parkway Peterborough

    Discharge of condition 14 (updated survey work) of planning permission 09/01369/OUT - Development of up to 65 hectares of employment land (B1, B2 and B8 including safeguarding of a site for a household recycling centre/park and ride). Associated highway infrastructure (including pedestrian, bridleway and cycle routes), and car parking for all uses. Foul and surface water drainage networks (including SuDS and lakes)

    Decided 24 Jul 2012 Conditions

Timeline

Dates from the published record

  1. 1 Aug 2013

    Received by Peterborough

  2. 6 Aug 2013

    Validated

    Checked as complete and ready for consideration.

  3. 17 Oct 2013

    Decision issued: Permitted

  4. 11 Sep 2026

    Added to PlanIndex

Cases linked to this one on the register

  • 12/01334/WCPP Granted

    Land To The East Of Alwalton Hill Fletton Parkway Peterborough

    Variation of condition 5 of outline planning permission 09/01369/OUT to allow a higher building (not exceeding 35m) to be built on plot E2.1 to meet the requirements of an occupier. The first sentence of condition 5 would read - Building heights shall not exceed a maximum height of 15 m except on plot E7 where the maximum height shall not exceed 17 m and on plot E2.1 where the maximum height shall not exceed 35 m

    Decided 7 Mar 2013 Full applications
  • 09/01369/OUT Granted

    Land To The East Of Alwalton Hill Fletton Parkway Peterborough

    Development of up to 65 hectares of employment land (B1, B2 and B8 including safeguarding of a site for a household recycling centre/park and ride). Associated highway infrastructure (including pedestrian, bridleway and cycle routes), and car parking for all uses. Foul and surface water drainage networks (including SuDS and lakes)

    Decided 31 May 2011 Outline

Documents

Plans, drawings, consultee responses and the officer's report

75 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What this grant of permission means

Peterborough granted permission on 17 October 2013, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 500 metres

  • Land To The East Of Alwalton Hill Fletton Parkway Peterborough

    11/01204/DISCHG Submitted 1 Aug 2011 0m away

    Discharge of conditions C11 (Great Crested Newt Stategy) and C12 (Biodiversity Strategy) of planning permission 09/01369/OUT - Development of up to 65 hectares of employment land (B1, B2 and B8 including safeguarding of a site for a household recycling centre/park and ride). Associated highway infrastructure (including pedestrian, bridleway and cycle routes), and car parking for all uses. Foul and surface water drainage networks (including SuDS and lakes)

    Decided Conditions 6 docs
  • Land To The East Of Alwalton Hill Fletton Parkway Peterborough

    09/01369/OUT Submitted 2 Dec 2009 0m away

    Development of up to 65 hectares of employment land (B1, B2 and B8 including safeguarding of a site for a household recycling centre/park and ride). Associated highway infrastructure (including pedestrian, bridleway and cycle routes), and car parking for all uses. Foul and surface water drainage networks (including SuDS and lakes)

    Granted Outline 236 docs
  • Land To The East Of Alwalton Hill Fletton Parkway Peterborough

    11/01349/DISCHG Submitted 25 Aug 2011 0m away

    Discharge of conditions 28(construction management plan) and 33(archaeological investigation) of planning permission 09/01369/OUT - Development of up to 65 hectares of employment land (B1, B2 and B8 including safeguarding of a site for a household recycling centre/park and ride). Associated highway infrastructure (including pedestrian, bridleway and cycle routes), and car parking for all uses. Foul and surface water drainage networks (including SuDS and lakes)

    Decided Conditions 9 docs
  • Land To The East Of Alwalton Hill Fletton Parkway Peterborough

    11/00925/DISCHG Submitted 17 Jun 2011 0m away

    Discharge of condition C11( Great Crested Newt Strategy) and C12 ( Biodiversity Strategy) of planning permission 09/01369/OUT - Development of up to 65 hectares of employment land (B1, B2 and B8 including safeguarding of a site for a household recycling centre/park and ride). Associated highway infrastructure (including pedestrian, bridleway and cycle routes), and car parking for all uses. Foul and surface water drainage networks (including SuDS and lakes)

    Decided Conditions 9 docs
  • Land To The East Of Alwalton Hill Fletton Parkway Peterborough

    12/00258/DISCHG Submitted 27 Feb 2012 0m away

    Discharge of condition 8 (Drainage) of Planning Permission 09/01369/OUT - (Development of up to 65 hectares of employment land (B1, B2 and B8 including safeguarding of a site for a household recycling centre/park and ride). Associated highway infrastructure (including pedestrian, bridleway and cycle routes), and car parking for all uses. Foul and surface water drainage networks (including SuDS and lakes))

    Decided Conditions 35 docs
  • Land To The East Of Alwalton Hill Fletton Parkway Peterborough

    12/01334/WCPP Submitted 24 Aug 2012 0m away

    Variation of condition 5 of outline planning permission 09/01369/OUT to allow a higher building (not exceeding 35m) to be built on plot E2.1 to meet the requirements of an occupier. The first sentence of condition 5 would read - Building heights shall not exceed a maximum height of 15 m except on plot E7 where the maximum height shall not exceed 17 m and on plot E2.1 where the maximum height shall not exceed 35 m

    Granted Full applications 130 docs

In Peterborough

  • 26/002898/FUL Status unknown

    2 Peterborough Road Eye Peterborough PE6 7YB

    Replacement of existing enclosed pergola with a permanent building

    17 Sep 2026 Full applications
  • 26/002901/FUL Status unknown

    Amazon EUK1 Flaxley Road, Peterborough, PE2 9EN

    Minor external alterations and associated works to the existing B8 warehouse an

    17 Sep 2026 Full applications
  • 26/002003/FUL Refused

    BUFFINGHAM MINIATURE SCHNAUZERS, Buffingham Kennels, Waterworks Lane, Glinton, Peterborough, PE6 7LP

    Proposed continuation of use of land and siting of mobile home in connection with and use of land, kennels and associated fencing and parking as licensed establishment for breeding dogs

    20 Feb 2026 Full applications
  • 26/002847/FUL Awaiting decision

    DALTON SEEDS, Dalmark House, Thorney Road, Eye, Peterborough, PE6 7UD

    Proposed extension to grain store building, including associated attenuation lag

    10 Sep 2026 Full applications
  • 26/001984/FUL Granted

    63 Ayres Drive Stanground Peterborough PE2 8JS

    Change of use from C3 dwelling to a C2 small childrens home for up to 2 children

    17 Feb 2026 Full applications