Planning application
Land To The East Of Alwalton Hill Fletton Parkway Peterborough
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Development of up to 65 hectares of employment land (B1, B2 and B8 including safeguarding of a site for a household recycling centre/park and ride). Associated highway infrastructure (including pedestrian, bridleway and cycle routes), and car parking for all uses. Foul and surface water drainage networks (including SuDS and lakes)
As published by the council, reference 09/01369/OUT
Application record
- Reference
- 09/01369/OUT
- Type
- Planning Application (Outline)
- Status
- Decided
- Decision
- Permitted
- Received
- 2 Dec 2009
- Validated
- 2 Dec 2009
- Decided
- 31 May 2011
- Ward
- Orton With Hampton
- Parish
- Peterborough
- Decision by
- Committee Decision
Site history
Applications at this address on the Peterborough register
This site has had 24 applications since 2009: 10 approved, 0 refused.
-
22/01169/MDOBL Granted
Land To The East Of Alwalton Hill Fletton Parkway Peterborough
Modifications to the Great Haddon S106 Agreement associated with 15/01672/WCPP
-
19/01651/NONMAT Decided
Land To The East Of Alwalton Hill Fletton Parkway Peterborough
Non material amendment ( additional process specific external plan and external storage) to planning permission 17/01759/REM
-
12/01334/WCPP Granted
Land To The East Of Alwalton Hill Fletton Parkway Peterborough
Variation of condition 5 of outline planning permission 09/01369/OUT to allow a higher building (not exceeding 35m) to be built on plot E2.1 to meet the requirements of an occupier. The first sentence of condition 5 would read - Building heights shall not exceed a maximum height of 15 m except on plot E7 where the maximum height shall not exceed 17 m and on plot E2.1 where the maximum height shall not exceed 35 m
-
12/01309/FUL Granted
Land To The East Of Alwalton Hill Fletton Parkway Peterborough
Temporary drainage works
-
12/01213/REM Granted
Land To The East Of Alwalton Hill Fletton Parkway Peterborough
Construction of access road, south part, with attenuation pond
-
12/00984/DISCHG Decided
Land To The East Of Alwalton Hill Fletton Parkway Peterborough
Discharge of conditions C4 (Drainage) and C7 (Arboricultural impacts) of Planning Permission 11/02049/REM (Construction of initial section of the internal access road from Junction 1 of the Fletton Parkway)
-
12/00957/DISCHG Decided
Land To The East Of Alwalton Hill Fletton Parkway Peterborough
Discharge of condition 14 (updated survey work) of planning permission 09/01369/OUT - Development of up to 65 hectares of employment land (B1, B2 and B8 including safeguarding of a site for a household recycling centre/park and ride). Associated highway infrastructure (including pedestrian, bridleway and cycle routes), and car parking for all uses. Foul and surface water drainage networks (including SuDS and lakes)
-
12/00877/REM Granted
Land To The East Of Alwalton Hill Fletton Parkway Peterborough
Landscaping of plot OS5 including attenuation pond, surface water pumping station and surface water rising main
-
12/00860/REM Granted
Land To The East Of Alwalton Hill Fletton Parkway Peterborough
Construction of a primary electricity supply station and foul water pumping station
-
12/00557/NONMAT Decided
Land To The East Of Alwalton Hill Fletton Parkway Peterborough
Non-material amendment to planning permission 09/01369/OUT - Development of up to 65 hectares of employment land (B1, B2 and B8 including safeguarding of a site for a household recycling centre/park and ride). Associated highway infrastructure (including pedestrian, bridleway and cycle routes), and car parking for all uses. Foul and surface water drainage networks (including SuDS and lakes)
Timeline
Dates from the published record
-
2 Dec 2009
Received by Peterborough
-
31 May 2011
Decision issued: Permitted
-
26 Aug 2026
Added to PlanIndex
Related applications
Cases linked to this one on the register
14 later applications on the register refer to this one:
-
12/01334/WCPP Granted
Land To The East Of Alwalton Hill Fletton Parkway Peterborough
Variation of condition 5 of outline planning permission 09/01369/OUT to allow a higher building (not exceeding 35m) to be built on plot E2.1 to meet the requirements of an occupier. The first sentence of condition 5 would read - Building heights shall not exceed a maximum height of 15 m except on plot E7 where the maximum height shall not exceed 17 m and on plot E2.1 where the maximum height shall not exceed 35 m
-
12/00957/DISCHG Decided
Land To The East Of Alwalton Hill Fletton Parkway Peterborough
Discharge of condition 14 (updated survey work) of planning permission 09/01369/OUT - Development of up to 65 hectares of employment land (B1, B2 and B8 including safeguarding of a site for a household recycling centre/park and ride). Associated highway infrastructure (including pedestrian, bridleway and cycle routes), and car parking for all uses. Foul and surface water drainage networks (including SuDS and lakes)
-
12/00557/NONMAT Decided
Land To The East Of Alwalton Hill Fletton Parkway Peterborough
Non-material amendment to planning permission 09/01369/OUT - Development of up to 65 hectares of employment land (B1, B2 and B8 including safeguarding of a site for a household recycling centre/park and ride). Associated highway infrastructure (including pedestrian, bridleway and cycle routes), and car parking for all uses. Foul and surface water drainage networks (including SuDS and lakes)
-
12/00258/DISCHG Decided
Land To The East Of Alwalton Hill Fletton Parkway Peterborough
Discharge of condition 8 (Drainage) of Planning Permission 09/01369/OUT - (Development of up to 65 hectares of employment land (B1, B2 and B8 including safeguarding of a site for a household recycling centre/park and ride). Associated highway infrastructure (including pedestrian, bridleway and cycle routes), and car parking for all uses. Foul and surface water drainage networks (including SuDS and lakes))
-
12/00270/DISCHG Decided
Land To The East Of Alwalton Hill Fletton Parkway Peterborough
Discharge of condition C21 ( Junction 1 works) of planning permission 09/01369/OUT - Development of up to 65 hectares of employment land (B1, B2 and B8 including safeguarding of a site for a household recycling centre/park and ride). Associated highway infrastructure (including pedestrian, bridleway and cycle routes), and car parking for all uses. Foul and surface water drainage networks (including SuDS and lakes)
-
11/01479/DISCHG Decided
Land To The East Of Alwalton Hill Fletton Parkway Peterborough
Discharge of condition C27 (Site waste management plan) of planning permission 09/01369/OUT (Development of up to 65 hectares of employment land (B1, B2 and B8 including safeguarding of a site for a household recycling centre/park and ride). Associated highway infrastructure (including pedestrian, bridleway and cycle routes), and car parking for all uses. Foul and surface water drainage networks (including SuDS and lakes))
-
11/01349/DISCHG Decided
Land To The East Of Alwalton Hill Fletton Parkway Peterborough
Discharge of conditions 28(construction management plan) and 33(archaeological investigation) of planning permission 09/01369/OUT - Development of up to 65 hectares of employment land (B1, B2 and B8 including safeguarding of a site for a household recycling centre/park and ride). Associated highway infrastructure (including pedestrian, bridleway and cycle routes), and car parking for all uses. Foul and surface water drainage networks (including SuDS and lakes)
-
11/01204/DISCHG Decided
Land To The East Of Alwalton Hill Fletton Parkway Peterborough
Discharge of conditions C11 (Great Crested Newt Stategy) and C12 (Biodiversity Strategy) of planning permission 09/01369/OUT - Development of up to 65 hectares of employment land (B1, B2 and B8 including safeguarding of a site for a household recycling centre/park and ride). Associated highway infrastructure (including pedestrian, bridleway and cycle routes), and car parking for all uses. Foul and surface water drainage networks (including SuDS and lakes)
-
11/01057/DISCHG Decided
Land To The East Of Alwalton Hill Fletton Parkway Peterborough
Discharge of condition C17 (Landscape Management Plan) of planning permission 09/01369/OUT - Development of up to 65 hectares of employment land (B1, B2 and B8 including safeguarding of a site for a household recycling centre/park and ride). Associated highway infrastructure (including pedestrian, bridleway and cycle routes), and car parking for all uses. Foul and surface water drainage networks (including SuDS and lakes)
-
11/00968/NONMAT Decided
Land To The East Of Alwalton Hill Fletton Parkway Peterborough
Non Material amendment to planning application 09/01369/OUT - Development of up to 65 hectares of employment land (B1, B2 and B8 including safeguarding of a site for a household recycling centre/park and ride). Associated highway infrastructure (including pedestrian, bridleway and cycle routes), and car parking for all uses. Foul and surface water drainage networks (including SuDS and lakes)
-
11/00925/DISCHG Decided
Land To The East Of Alwalton Hill Fletton Parkway Peterborough
Discharge of condition C11( Great Crested Newt Strategy) and C12 ( Biodiversity Strategy) of planning permission 09/01369/OUT - Development of up to 65 hectares of employment land (B1, B2 and B8 including safeguarding of a site for a household recycling centre/park and ride). Associated highway infrastructure (including pedestrian, bridleway and cycle routes), and car parking for all uses. Foul and surface water drainage networks (including SuDS and lakes)
-
11/00817/REM Granted
Plot 7 Great Haddon Employment Area Fletton Parkway Peterborough
Details of a new access road from junction 1 of the Fletton Parkway to plot 7 and details of the erection of a new warehouse on plot 7 with associated car parking, landscaping and ancillary works - all reserved matters pursuant to outline planning permission 09/01369/OUT (development of 65 hectares of employment land). An environmental statement accompanied the outline application
-
12/01108/DISCHG Decided
Land To The East Of Alwalton Hill Fletton Parkway Peterborough
Discharge of Condition C28 (CMP) of planning permission 09/01369/OUT - Development of up to 65 hectares of employment land
-
12/01006/DISCHG Decided
Land To The East Of Alwalton Hill Fletton Parkway Peterborough
Discharge of Condition C25 (J17/A1(M) of planning application 09/01369/OUT - Development of up to 65 hectares of employment land (B1, B2 and B8 including safeguarding of a site for a household recycling centre/park and ride). Associated highway infrastructure (including pedestrian, bridleway and cycle routes), and car parking for all uses. Foul and surface water drainage networks (including SuDS and lakes)
Documents
Plans, drawings, consultee responses and the officer's report
236 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat this grant of permission means
Peterborough granted permission on 31 May 2011, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About outline applications
An outline application tests the principle of developing a site, holding back details such as appearance and landscaping as reserved matters for later approval. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
Land To The East Of Alwalton Hill Fletton Parkway Peterborough
Discharge of conditions C11 (Great Crested Newt Stategy) and C12 (Biodiversity Strategy) of planning permission 09/01369/OUT - Development of up to 65 hectares of employment land (B1, B2 and B8 including safeguarding of a site for a household recycling centre/park and ride). Associated highway infrastructure (including pedestrian, bridleway and cycle routes), and car parking for all uses. Foul and surface water drainage networks (including SuDS and lakes)
Decided Conditions 6 docs -
Land To The East Of Alwalton Hill Fletton Parkway Peterborough
Discharge of conditions 28(construction management plan) and 33(archaeological investigation) of planning permission 09/01369/OUT - Development of up to 65 hectares of employment land (B1, B2 and B8 including safeguarding of a site for a household recycling centre/park and ride). Associated highway infrastructure (including pedestrian, bridleway and cycle routes), and car parking for all uses. Foul and surface water drainage networks (including SuDS and lakes)
Decided Conditions 9 docs -
Land To The East Of Alwalton Hill Fletton Parkway Peterborough
Discharge of condition C11( Great Crested Newt Strategy) and C12 ( Biodiversity Strategy) of planning permission 09/01369/OUT - Development of up to 65 hectares of employment land (B1, B2 and B8 including safeguarding of a site for a household recycling centre/park and ride). Associated highway infrastructure (including pedestrian, bridleway and cycle routes), and car parking for all uses. Foul and surface water drainage networks (including SuDS and lakes)
Decided Conditions 9 docs -
Land To The East Of Alwalton Hill Fletton Parkway Peterborough
Discharge of condition 8 (Drainage) of Planning Permission 09/01369/OUT - (Development of up to 65 hectares of employment land (B1, B2 and B8 including safeguarding of a site for a household recycling centre/park and ride). Associated highway infrastructure (including pedestrian, bridleway and cycle routes), and car parking for all uses. Foul and surface water drainage networks (including SuDS and lakes))
Decided Conditions 35 docs -
Land To The East Of Alwalton Hill Fletton Parkway Peterborough
Variation of condition 5 of outline planning permission 09/01369/OUT to allow a higher building (not exceeding 35m) to be built on plot E2.1 to meet the requirements of an occupier. The first sentence of condition 5 would read - Building heights shall not exceed a maximum height of 15 m except on plot E7 where the maximum height shall not exceed 17 m and on plot E2.1 where the maximum height shall not exceed 35 m
Granted Full applications 130 docs -
Land To The East Of Alwalton Hill Fletton Parkway Peterborough
Discharge of condition C21 ( Junction 1 works) of planning permission 09/01369/OUT - Development of up to 65 hectares of employment land (B1, B2 and B8 including safeguarding of a site for a household recycling centre/park and ride). Associated highway infrastructure (including pedestrian, bridleway and cycle routes), and car parking for all uses. Foul and surface water drainage networks (including SuDS and lakes)
Decided Conditions 49 docs
Other outline applications
In Peterborough
-
26/002596/SCREEN Decided
Bainton Water Recycling Centre, Tallington Road, Bainton, Cambridgeshire, PE9 3AF
EIA Screening Opinion Request - Works at Bainton Water Recycling Centre
-
26/002300/OUT Granted
Yard off Little House Farm, English Drove, Thorney
Outline application with all matters reserved except access for the erection of an agricultural worker’s dwelling and a new agricultural building
-
26/002436/PIP Granted
Land to the rear of 43 - 45 Southview Road, Peterborough, Cambridgeshire, PE4 6AG
Permission in principle for up to 4no. units (flats or housing to be agreed at stage 2)
-
26/002571/SCREEN Decided
Hampton Woods
EIA Screening Opinion - Report to support the upcoming outline planning application at Hampton Woods (south of R10 and R11)
-
26/002458/OUT Refused
20, Peakirk Road, Glinton, Peterborough, PE6 7LT
Outline application with layout secured and all matters reserved for the conversion of a garage to the rear of the garden into a bedroom bungalow