Planning application
Fulham Gas Works Imperial Road London
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Display of directional signage on a set of 6no. planters located on Edith Row.
As published by the council, reference 2021/00209/ADV
Application record
- Reference
- 2021/00209/ADV
- Type
- Display of Advertisements
- Status
- Pending Consideration
- Received
- 22 Jan 2021
- Validated
- 25 Jan 2021
- Ward
- Parsons Green And Walham
- Decision by
- Delegated Decision
Site history
Applications at this address on the Hammersmith and Fulham register
This site has had 110 applications since 2020: 31 approved, 0 refused.
-
P/2026/02015/DET Awaiting decision
Fulham Gas Works Imperial Road London
Details to discharge Condition 62 (Road Safety Audit) for Plot H1 (Phase 4b) pursuant to Planning Permission (ref: 2018/02100/COMB) dated 8 February 2019 as varied by (ref: 2024/00961/VAR dated 23 December 2024).
-
P/2026/01772/NMAT Awaiting decision
Fulham Gas Works,Imperial Road,London
Non-Material Amendment to Planning Permission (ref: 2018/02100/COMB ) dated 8 February 2019 (as amended by ref: 2024/00961/VAR dated 3 December 2024), in respect of Condition 73 (details and materials). The proposed amendment being the requirement of a mock up to be provided remotely for review by officers rather than on site.
-
P/2026/01754/DLBC Awaiting decision
Fulham Gas Works Imperial Road London
Details of paint finishes, in compliance with Condition 3 of Listed Building consent 2025/00568/LBC dated 23 July 2026.
-
P/2026/01473/DET Granted
Fulham Gas Works Imperial Road London
Details to discharge Condition 20 (Verification Report) for Phases 3b, 3c and 3d (Development Plots E1 and E2) pursuant to Planning Permission (ref: 2018/02100/COMB) dated 8 February 2019 as varied by (ref: 2024/00961/VAR dated 23 December 2024).
-
P/2026/01890/VAR Awaiting decision
Fulham Gas Works Imperial Road London
Variation of Condition 1 (Drawings) of reserved matters details relating to the approval of access; appearance; landscaping; layout and scale in respect of Phases 4b, 4c and 4d (Development Plots H1 and H2); for the erection of two buildings comprising residential and non-residential floorspace with associated landscaping approved under 2024/01420/RES granted 17 January 2025 of planning permission 2018/02100/COMB granted 8 February 2019 (as amended by refs 2020/01088/NMAT and 2024/00818/NMAT). As varied by 2024/00961/VAR variation of Condition 4 (Drawings) and Condition 5 (Design Codes and Parameter Plans) of planning permission 2018/02100/COMB granted 8 Feb 2019 (as amended by refs 2020/01088/NMAT and 2024/00818/NMAT). The proposed amendments to Phase 4b Development Plot H1 comprise: (a) revisions to tower and shoulder terrace heights within consented maximum parameter heights (comprising an increase in shoulder height and reduction in tower height); (b) changes to the arrangemen... read more
-
P/2026/01214/DET Awaiting decision
Fulham Gas Works Imperial Road London
Details to discharge Condition 16 (Preliminary Risk Assessment) for Development Phases 3a, 4a, 5a, 5b and 6 pursuant to Planning Permission (ref: 2018/02100/COMB) dated 8 February 2019 as varied by (ref: 2024/00961/VAR dated 23 December 2024).
-
P/2026/01125/ADV Granted
Fulham Gas Works Imperial Road London
Display of 1no. internally illuminated fascia sign and 2no. non-illuminated projecting signs to Unit 4a, phase 1
-
P/2026/01024/DET Awaiting decision
Fulham Gas Works Imperial Road London
Details to discharge Condition 87 (Materials) for development Development Plot H1 (Phase 4b) pursuant to Planning Permission (ref: 2018/02100/COMB) dated 8 February 2019 as varied by (ref: 2024/00961/VAR dated 23 December 2024).
-
P/2026/01008/DET Awaiting decision
Fulham Gas Works,Imperial Road,London
Details to discharge Condition 74 (1:20 details) for development Development Plot H1 (Phase 4b) pursuant to Planning Permission (ref: 2018/02100/COMB) dated 8 February 2019 as varied by (ref: 2024/00961/VAR dated 23 December 2024)
-
P/2026/01009/DET Awaiting decision
Fulham Gas Works Imperial Road London
Details to discharge Condition 89 (Secured by Design - Ground Level) for development Development Plot H1 (Phase 4b) pursuant to Planning Permission (ref: 2018/02100/COMB) dated 8 February 2019 as varied by (ref: 2024/00961/VAR dated 23 December 2024).
Timeline
Dates from the published record
-
22 Jan 2021
Received by Hammersmith and Fulham
-
25 Jan 2021
Validated
Checked as complete and ready for consideration.
-
15 Aug 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 22 March 2021, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Hammersmith and Fulham took a median of 78 days over the applications it decided in the last year.
Documents
Plans, drawings, consultee responses and the officer's report
9 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat happens while it is decided
This application is with Hammersmith and Fulham for determination, against a statutory target of eight weeks. Over the last year Hammersmith and Fulham decided advertisement consent applications in a median of 86 days. More in our guide to how long planning decisions take.
About advertisement consent applications
Advertisement consent is judged on two things only: amenity and public safety, not competition or other planning considerations. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
1-3 Michael Road Fulham London SW6 2ER
Submission of details pursuant to Condition 47 (Verification Report) and Condition 48 (Onward Long-term Monitoring) of planning permission reference: 2016/01448/FUL granted 10th August 2017.
Granted Conditions 9 docs -
627 King's Road London SW6 2ES
97% historically approved · decision due ~2 May
T1-FRONT Garden - Apple(Malus) -reduce crown by 25%(1m) to suitable growth point -thin crown by 15% to reduce crown density to allow more light/air through canopy -ensure greater separation from house frontage -remove any deadwood, crossing or suppressed branches T2-FRONT Garden - Crab Apple(Malus sylvestris) -reduce crown by 20%(0.75m) to suitable growth points -reduce elongated outbound branch(growing into neighbouring tree) by 1.7m to suitable growth points All works are for routine maintenance.
Awaiting decision Trees 3 docs -
4 - 5 Sotheron Place London SW6 2EJ
Non-material amendment to planning permission ref: 2020/01499/FUL granted 28th January 2021 for the 'Demolition of existing buildings and redevelopment including the erection of a part one, part 3 storey building and a 6 storey building plus basement to provide 31 flats (Use Class C3) and commercial floorspace (Use Class B1a and D2) with associated parking, landscaping and amenity space.' Amendments to Block A comprising of: Installation of 4no heat pumps for the commercial unit on the rooftop and extended louvred enclosure, alterations to shopfront, addition of external access steps and ramp to the commercial unit and additional ventilation on the western elevation.
Granted Amendments New dwelling Demolition +1Major scheme -
85 - 87 Waterford Road London SW6 2ET
Removal of Conditions 19, 20 and 21 (parking permits) of the planning permission reference: 2015/05030/FUL dated 17th February 2016 for the "Change of use of no. 87 Waterford Road from restaurant (Class A3) into residential (Class C3); erection of an additional floor at No.85 and No.87 to replace and enlarge existing additional floor at No.85; partial demolition of the ground and first floor rear side extension in connection with the creation of a new patio area with new window and folding doors at ground floor level to No.85; alterations to fenestration and rendering of front and side elevations at ground and first floor level at No. 85 and No.87; excavation underneath the footprint of No.85 in connection with the creation of a new basement in connection with the formation of 3 x two bedroom self-contained flats."
Granted Amendments New dwelling Extension +2 10 docs -
Britannia House, Britannia Way And 2A Britannia Way London SW6 2HE
Installation of 37no. solar photovoltaic panels to the main roof areas.
Granted Full applications -
2 Britannia Road, London, SW6 2HL
97% historically approved · decision due ~6 Feb
T1 Magnolia, front garden - Reduce all aspects of crown by approx. 2-2.5m, thin by 10% - Remove dead wood and crossing branches.
Awaiting decision Trees 5 docs
Other advertisement consent applications
In Hammersmith and Fulham
-
P/2026/01671/ADV Granted
184 Uxbridge Road, London, W12 7JP
Display of 1no. non-illuminated lettering fascia sign, and 1no. non-illuminated logo sign applied to the glazing to the front elevation fronting Hopgood Street.
-
2025/03051/ADV Withdrawn
Pavement Outside 1B Shepherd's Bush Road London W6 7NA
Display of an internally illuminated digital LED screen to one side of a new free standing multifunctional hub unit, showing static and animated displays in sequence comprising commercial and community messages.
-
2025/03049/ADV Withdrawn
Pavement Outside 297 King Street London W6 9NH
Display of an internally illuminated digital LED screen to one side of a new free-standing multifunctional Hub unit, showing static and animated displays in sequence comprising of commercial and community messages.
-
P/2026/00976/ADV Granted
61 Walham Grove, London, SW6 1QR
Display of 1no. externally illuminated fascia sign, 1no. externally illuminated double sided projecting sign, and 1no.internally illuminated projecting pole sign to the front elevation.
-
P/2026/01629/ADV Granted
The Eagle, 215 Askew Road, London, W12 9AZ
Display of an externally illuminated fascia lettering sign; display of an externally illuminated double-sided hanging sign; and display of a non-illuminated entrance plaque to the front elevation.