Planning application
Fulham Gas Works Imperial Road London
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Detail to partially discharge condition 43 (Low emissions - Air quality) relating to development Plot B1 (Phase 2a) of planning permission 2018/02100/COMB dated 8 February 2019.
As published by the council, reference 2020/00899/DET
Application record
- Reference
- 2020/00899/DET
- Type
- Details to Meet Conditions Full/Outline
- Status
- Pending Consideration
- Received
- 3 Apr 2020
- Validated
- 3 Apr 2020
- Ward
- Parsons Green And Walham
- Decision by
- Delegated Decision
Site history
Applications at this address on the Hammersmith and Fulham register
This site has had 110 applications since 2020: 31 approved, 0 refused.
-
P/2026/02015/DET Awaiting decision
Fulham Gas Works Imperial Road London
Details to discharge Condition 62 (Road Safety Audit) for Plot H1 (Phase 4b) pursuant to Planning Permission (ref: 2018/02100/COMB) dated 8 February 2019 as varied by (ref: 2024/00961/VAR dated 23 December 2024).
-
P/2026/01772/NMAT Awaiting decision
Fulham Gas Works,Imperial Road,London
Non-Material Amendment to Planning Permission (ref: 2018/02100/COMB ) dated 8 February 2019 (as amended by ref: 2024/00961/VAR dated 3 December 2024), in respect of Condition 73 (details and materials). The proposed amendment being the requirement of a mock up to be provided remotely for review by officers rather than on site.
-
P/2026/01754/DLBC Awaiting decision
Fulham Gas Works Imperial Road London
Details of paint finishes, in compliance with Condition 3 of Listed Building consent 2025/00568/LBC dated 23 July 2026.
-
P/2026/01473/DET Granted
Fulham Gas Works Imperial Road London
Details to discharge Condition 20 (Verification Report) for Phases 3b, 3c and 3d (Development Plots E1 and E2) pursuant to Planning Permission (ref: 2018/02100/COMB) dated 8 February 2019 as varied by (ref: 2024/00961/VAR dated 23 December 2024).
-
P/2026/01890/VAR Awaiting decision
Fulham Gas Works Imperial Road London
Variation of Condition 1 (Drawings) of reserved matters details relating to the approval of access; appearance; landscaping; layout and scale in respect of Phases 4b, 4c and 4d (Development Plots H1 and H2); for the erection of two buildings comprising residential and non-residential floorspace with associated landscaping approved under 2024/01420/RES granted 17 January 2025 of planning permission 2018/02100/COMB granted 8 February 2019 (as amended by refs 2020/01088/NMAT and 2024/00818/NMAT). As varied by 2024/00961/VAR variation of Condition 4 (Drawings) and Condition 5 (Design Codes and Parameter Plans) of planning permission 2018/02100/COMB granted 8 Feb 2019 (as amended by refs 2020/01088/NMAT and 2024/00818/NMAT). The proposed amendments to Phase 4b Development Plot H1 comprise: (a) revisions to tower and shoulder terrace heights within consented maximum parameter heights (comprising an increase in shoulder height and reduction in tower height); (b) changes to the arrangemen... read more
-
P/2026/01214/DET Awaiting decision
Fulham Gas Works Imperial Road London
Details to discharge Condition 16 (Preliminary Risk Assessment) for Development Phases 3a, 4a, 5a, 5b and 6 pursuant to Planning Permission (ref: 2018/02100/COMB) dated 8 February 2019 as varied by (ref: 2024/00961/VAR dated 23 December 2024).
-
P/2026/01125/ADV Granted
Fulham Gas Works Imperial Road London
Display of 1no. internally illuminated fascia sign and 2no. non-illuminated projecting signs to Unit 4a, phase 1
-
P/2026/01024/DET Awaiting decision
Fulham Gas Works Imperial Road London
Details to discharge Condition 87 (Materials) for development Development Plot H1 (Phase 4b) pursuant to Planning Permission (ref: 2018/02100/COMB) dated 8 February 2019 as varied by (ref: 2024/00961/VAR dated 23 December 2024).
-
P/2026/01008/DET Awaiting decision
Fulham Gas Works,Imperial Road,London
Details to discharge Condition 74 (1:20 details) for development Development Plot H1 (Phase 4b) pursuant to Planning Permission (ref: 2018/02100/COMB) dated 8 February 2019 as varied by (ref: 2024/00961/VAR dated 23 December 2024)
-
P/2026/01009/DET Awaiting decision
Fulham Gas Works Imperial Road London
Details to discharge Condition 89 (Secured by Design - Ground Level) for development Development Plot H1 (Phase 4b) pursuant to Planning Permission (ref: 2018/02100/COMB) dated 8 February 2019 as varied by (ref: 2024/00961/VAR dated 23 December 2024).
Timeline
Dates from the published record
-
3 Apr 2020
Received by Hammersmith and Fulham
-
22 Aug 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 29 May 2020, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Hammersmith and Fulham took a median of 78 days over the applications it decided in the last year.
Documents
Plans, drawings, consultee responses and the officer's report
5 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat happens while it is decided
This application is with Hammersmith and Fulham for determination, against a statutory target of eight weeks. Over the last year Hammersmith and Fulham decided condition discharge and variation applications in a median of 81 days. More in our guide to how long planning decisions take.
About condition discharge and variation applications
This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
Fulham Gas Works Imperial Road London
95% historically approved · decision due ~20 Aug
Details to partially discharge Condition 20 (Contamination - Verification Report) for Plot B1 Phase 2a of planning permission 2018/02100/COMB dated 8 February 2019.
Awaiting decision Conditions 7 docs -
Fulham Gas Works Imperial Road London
95% historically approved · decision due ~29 May
Detail to partially discharge Condition 12 (Retail Amalgamation); Condition 55 (Extraction & Odour control); Condition 56 (Cleaning Schedule); Condition 58 (Outdoor Seating); Condition 59 (Outside Seating (Operating Hours)); Condition 60 (Operating Hours); Condition 100 (Lifts), relating to development Plot B1 (Phase 2a) of planning permission 2018/02100/COMB dated 8 February 2019.
Awaiting decision Conditions 4 docs -
Fulham Gas Works Imperial Road London
Details to discharge Condition 10 (Highway Works) of planning permission (ref 2020/00748/FUL) granted 13 May 2020.
Granted Conditions 8 docs -
Fulham Gasworks Imperial Road London
95% historically approved · decision due ~15 Sep
Details of temporary fencing and/or enclosure, in compliance with Condition 8 of planning permission (ref. 2018/02100/COMB) dated 8 February 2019.
Awaiting decision Conditions 8 docs -
Fulham Gas Works Imperial Road London
100% historically approved · decision due ~25 May
Proposed works to 1856 Chief Engineer's Office (Grade II Listed) and 1927 Former Research Laboratory (Grade II Listed) located within Phases C1 and C2 of planning permission 2018/02100/COMB granted 8 February 2019. Works would comprise Soft Strip works to allow the constructional detailing and condition of the building fabric that is currently concealed, to be confirmed by the removal of modern insertions and finishes and/or older finishes to allow the underlying fabric to be exposed. The Soft Strip will improve the understanding of the Listed Buildings and as such will inform the design proposals, including their original proportions and layouts, the functionality of the buildings andovercome practical problems such as identifying service routes to minimise the impact on the historic fabric.
Awaiting decision Heritage and listed buildings 11 docs -
Fulham Gas Works Imperial Road London
95% historically approved · decision due ~25 May
Details to discharge conditions 22(b) (Archaeology (GLAAS)); Condition 29 (a) (b) (Water Network (Thames Water)); Condition 63 (Safe Use of Drop-off Locations); Condition 65 (Cycle Parking); Condition 69 (Car & Cycle Parking Management Plan); Condition 70 (Delivery and Servicing Management Plan); Condition 85 (Window Cleaning Equipment); Condition 91 (Lights Off); Condition 97 (street Furniture); Condition 98 (Access Management Plan) Development Plot B1, Phase 2a for planning application 2018/02100/COMB dated 8 February 2019.
Awaiting decision Conditions Windows or glazing 14 docs
Other condition discharge and variation applications
In Hammersmith and Fulham
-
P/2026/01837/DLBC Granted
25 St Peter'S Square, London, W6 9NW
Submission of details of Full details, including photographs of physical samples, of materials to be used on the external surfaces of the building, boundary walls and ground surfaces pursuant to condition 3 of planning application ref: 2025/02038/LBC granted 2nd July 2026.
-
P/2026/01565/DET Granted
517-523 Fulham Road, London, SW6 1HD
Submission of details pursuant to Condition 7 (Anti-Vibration) of the planning permission reference: 2024/02201/FUL dated 24th September 2025.
-
P/2026/01717/DET Granted
3 Shortlands, London, W6 8DA
Submission of details of secured by design pursuant to condition 31 of planning permission ref: 2025/01723/FUL granted 1st July 2026.
-
P/2026/01708/DET Granted
11 Farm Lane, London, SW6 1PU
Submission of details of a post installation compliance report of the approved ventilation strategy, pursuant to Condition 17 of the planning permission reference: 2022/03329/FR3 dated 19th July 2023.
-
P/2026/01604/DET Granted
20 Avonmore Road, London, W14 8RR
Submission of details on the use of tall plant/scaffolding, in consultation with TFL Infrastructure Protection, pursuant to Condition 19 of planning permission reference: 2024/01752/FUL dated 10th December 2025.