Planning application

Fulham Gas Works Imperial Road London

Awaiting decision Hammersmith and Fulham 2020/00860/LBC Listed Building Consent

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Proposed works to 1856 Chief Engineer's Office (Grade II Listed) and 1927 Former Research Laboratory (Grade II Listed) located within Phases C1 and C2 of planning permission 2018/02100/COMB granted 8 February 2019. Works would comprise Soft Strip works to allow the constructional detailing and condition of the building fabric that is currently concealed, to be confirmed by the removal of modern insertions and finishes and/or older finishes to allow the underlying fabric to be exposed. The Soft Strip will improve the understanding of the Listed Buildings and as such will inform the design proposals, including their original proportions and layouts, the functionality of the buildings andovercome practical problems such as identifying service routes to minimise the impact on the historic fabric.

As published by the council, reference 2020/00860/LBC

Application record

Reference
2020/00860/LBC
Type
Listed Building Consent
Status
Pending Consideration
Received
30 Mar 2020
Validated
30 Mar 2020
Ward
Parsons Green And Walham
Decision by
Delegated Decision

Site history

Applications at this address on the Hammersmith and Fulham register

This site has had 110 applications since 2020: 31 approved, 0 refused.

  • P/2026/02015/DET Awaiting decision

    Fulham Gas Works Imperial Road London

    Details to discharge Condition 62 (Road Safety Audit) for Plot H1 (Phase 4b) pursuant to Planning Permission (ref: 2018/02100/COMB) dated 8 February 2019 as varied by (ref: 2024/00961/VAR dated 23 December 2024).

    Submitted 5 Aug 2026 Conditions
  • P/2026/01772/NMAT Awaiting decision

    Fulham Gas Works,Imperial Road,London

    Non-Material Amendment to Planning Permission (ref: 2018/02100/COMB ) dated 8 February 2019 (as amended by ref: 2024/00961/VAR dated 3 December 2024), in respect of Condition 73 (details and materials). The proposed amendment being the requirement of a mock up to be provided remotely for review by officers rather than on site.

    Submitted 13 Jul 2026 Amendments
  • P/2026/01754/DLBC Awaiting decision

    Fulham Gas Works Imperial Road London

    Details of paint finishes, in compliance with Condition 3 of Listed Building consent 2025/00568/LBC dated 23 July 2026.

    Submitted 10 Jul 2026 Conditions
  • Fulham Gas Works Imperial Road London

    Details to discharge Condition 20 (Verification Report) for Phases 3b, 3c and 3d (Development Plots E1 and E2) pursuant to Planning Permission (ref: 2018/02100/COMB) dated 8 February 2019 as varied by (ref: 2024/00961/VAR dated 23 December 2024).

    Decided 21 Jul 2026 Conditions
  • P/2026/01890/VAR Awaiting decision

    Fulham Gas Works Imperial Road London

    Variation of Condition 1 (Drawings) of reserved matters details relating to the approval of access; appearance; landscaping; layout and scale in respect of Phases 4b, 4c and 4d (Development Plots H1 and H2); for the erection of two buildings comprising residential and non-residential floorspace with associated landscaping approved under 2024/01420/RES granted 17 January 2025 of planning permission 2018/02100/COMB granted 8 February 2019 (as amended by refs 2020/01088/NMAT and 2024/00818/NMAT). As varied by 2024/00961/VAR variation of Condition 4 (Drawings) and Condition 5 (Design Codes and Parameter Plans) of planning permission 2018/02100/COMB granted 8 Feb 2019 (as amended by refs 2020/01088/NMAT and 2024/00818/NMAT). The proposed amendments to Phase 4b Development Plot H1 comprise: (a) revisions to tower and shoulder terrace heights within consented maximum parameter heights (comprising an increase in shoulder height and reduction in tower height); (b) changes to the arrangemen... read more

    Submitted 15 May 2026 Amendments
  • P/2026/01214/DET Awaiting decision

    Fulham Gas Works Imperial Road London

    Details to discharge Condition 16 (Preliminary Risk Assessment) for Development Phases 3a, 4a, 5a, 5b and 6 pursuant to Planning Permission (ref: 2018/02100/COMB) dated 8 February 2019 as varied by (ref: 2024/00961/VAR dated 23 December 2024).

    Submitted 6 May 2026 Conditions
  • Fulham Gas Works Imperial Road London

    Display of 1no. internally illuminated fascia sign and 2no. non-illuminated projecting signs to Unit 4a, phase 1

    Decided 3 Jul 2026 Advertising
  • P/2026/01024/DET Awaiting decision

    Fulham Gas Works Imperial Road London

    Details to discharge Condition 87 (Materials) for development Development Plot H1 (Phase 4b) pursuant to Planning Permission (ref: 2018/02100/COMB) dated 8 February 2019 as varied by (ref: 2024/00961/VAR dated 23 December 2024).

    Submitted 16 Apr 2026 Conditions
  • P/2026/01008/DET Awaiting decision

    Fulham Gas Works,Imperial Road,London

    Details to discharge Condition 74 (1:20 details) for development Development Plot H1 (Phase 4b) pursuant to Planning Permission (ref: 2018/02100/COMB) dated 8 February 2019 as varied by (ref: 2024/00961/VAR dated 23 December 2024)

    Submitted 14 Apr 2026 Conditions
  • P/2026/01009/DET Awaiting decision

    Fulham Gas Works Imperial Road London

    Details to discharge Condition 89 (Secured by Design - Ground Level) for development Development Plot H1 (Phase 4b) pursuant to Planning Permission (ref: 2018/02100/COMB) dated 8 February 2019 as varied by (ref: 2024/00961/VAR dated 23 December 2024).

    Submitted 14 Apr 2026 Conditions

Timeline

Dates from the published record

  1. 30 Mar 2020

    Received by Hammersmith and Fulham

  2. 22 Aug 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 25 May 2020, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Hammersmith and Fulham took a median of 78 days over the applications it decided in the last year.

Documents

Plans, drawings, consultee responses and the officer's report

11 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What happens while it is decided

This application is with Hammersmith and Fulham for determination, against a statutory target of eight weeks. Over the last year Hammersmith and Fulham decided heritage and listed building applications in a median of 156 days. More in our guide to how long planning decisions take.

About heritage and listed building applications

Listed building consent is needed for works that affect the special interest of a listed building, and carrying out such works without it is a criminal offence. More in our guide to planning application types.

Nearby applications

Within 500 metres

  • Fulham Gas Works Imperial Road London

    2020/01595/DET Submitted 24 Jun 2020 0m away

    95% historically approved · decision due ~20 Aug

    Details to partially discharge Condition 20 (Contamination - Verification Report) for Plot B1 Phase 2a of planning permission 2018/02100/COMB dated 8 February 2019.

    Awaiting decision Conditions 7 docs
  • Fulham Gas Works Imperial Road London

    2020/00900/DET Submitted 3 Apr 2020 0m away

    95% historically approved · decision due ~29 May

    Detail to partially discharge Condition 12 (Retail Amalgamation); Condition 55 (Extraction & Odour control); Condition 56 (Cleaning Schedule); Condition 58 (Outdoor Seating); Condition 59 (Outside Seating (Operating Hours)); Condition 60 (Operating Hours); Condition 100 (Lifts), relating to development Plot B1 (Phase 2a) of planning permission 2018/02100/COMB dated 8 February 2019.

    Awaiting decision Conditions 4 docs
  • Fulham Gas Works Imperial Road London

    2020/00899/DET Submitted 3 Apr 2020 0m away

    95% historically approved · decision due ~29 May

    Detail to partially discharge condition 43 (Low emissions - Air quality) relating to development Plot B1 (Phase 2a) of planning permission 2018/02100/COMB dated 8 February 2019.

    Awaiting decision Conditions 5 docs
  • Fulham Gas Works Imperial Road London

    2020/03462/DET Submitted 24 Dec 2020 0m away

    Details to discharge Condition 10 (Highway Works) of planning permission (ref 2020/00748/FUL) granted 13 May 2020.

    Granted Conditions 8 docs
  • Fulham Gasworks Imperial Road London

    2020/01850/DET Submitted 20 Jul 2020 0m away

    95% historically approved · decision due ~15 Sep

    Details of temporary fencing and/or enclosure, in compliance with Condition 8 of planning permission (ref. 2018/02100/COMB) dated 8 February 2019.

    Awaiting decision Conditions 8 docs
  • Fulham Gas Works Imperial Road London

    2020/00851/DET Submitted 30 Mar 2020 0m away

    95% historically approved · decision due ~25 May

    Details to discharge conditions 22(b) (Archaeology (GLAAS)); Condition 29 (a) (b) (Water Network (Thames Water)); Condition 63 (Safe Use of Drop-off Locations); Condition 65 (Cycle Parking); Condition 69 (Car & Cycle Parking Management Plan); Condition 70 (Delivery and Servicing Management Plan); Condition 85 (Window Cleaning Equipment); Condition 91 (Lights Off); Condition 97 (street Furniture); Condition 98 (Access Management Plan) Development Plot B1, Phase 2a for planning application 2018/02100/COMB dated 8 February 2019.

    Awaiting decision Conditions Windows or glazing 14 docs

In Hammersmith and Fulham

  • 2026/00071/LBC Granted

    7 Shepherd's Bush Place London W12 8LX

    Erection of rear extensions at ground and first floor levels; installation of a new light channel in the rear roofslope; installation of a new rooflight above the roof of first floor rear back addition; internal alterations at first floor level to include new internal partition walls to form a new bathroom, demolition of the existing partition wall in the rear bathroom and re-decorate the rear bathroom with new units, and installation of new door openings; internal alterations at ground floor level to include replacement of existing kitchen with new wc and utility room together with a new partition wall and door opening, removal of existing double doors in between the proposed kitchen and living room; associated internal alterations.

    13 Jan 2026 Heritage and listed buildings
  • 2025/02901/LBC Granted

    46 Ravenscourt Gardens, London, W6 0TU

    Installation of an air source heat pump within a timber ventilated acoustic enclosure on anti-vibration mounts on top of the ground floor back addition; installation of a gas meter and pedestrian access gate with new pedestrian access gate to the front (northern elevation); replacement of existing wooden gate with new wooden gate to southern elevation of the property; replacement of existing timber trellis on top of the brick boundary wall with new timber trellis (extended) to the western elevation.

    17 Oct 2025 Heritage and listed buildings
  • P/2026/02050/LBC Awaiting decision

    River Wall Road Side 28 - 34 Upper Mall London W6 9TA

    Creation of a ceramic tile mural to celebrate William Morris and his 1880 journey along the Thames, to be mounted on the road side of the river wall to the Upper Mall across from Kelmscott House, William Morris' home in Hammersmith.

    6 Aug 2026 Heritage and listed buildings
  • 2026/00046/LBC Granted

    Greenside Primary School Westville Road, London, W12 9PT

    External alterations to include: replacement of existing roof coverings and roof system with new roof covering and roof system (in varying heights) comprising of new replacement felt to all roofs; replacement of external awnings with new electronically operated awnings; replacement of existing glass with slim double glaze or laminated within the existing crittall metal frame; replacement of existing steel frame (to later extensions) with new steel frame and double-glazing system; replacement of existing rooflights with new safety glass in existing frame and new rooflight to replace modern rooflight; refurbishment and replacement of existing rainwater goods; installation of anchor points and a horizontal lifeline system to provide safe access to roof; Internal alterations to include: installation of new internal blinds comprising of white blackout fabric to replace the existing black fabric; associated internal and external alterations.

    9 Jan 2026 Heritage and listed buildings
  • Ravenscourt Park Hospital, Ravenscourt Park,London,W6 0TN

    Internal and external alterations to Block C including part demolition of existing basement walls, construction of a new lightwell, enlargement of an existing louvred opening, installation of a louvred vent and associated door, construction of a parapet wall and internal strip-out and trenching for power cables, in association with the installation of a new electrical substation.

    17 Apr 2026 Heritage and listed buildings