Skip to content
PlanIndex Get alerts
Menu

Planning application

Fulham Gasworks Imperial Road London

Awaiting decision Hammersmith and Fulham 2020/01850/DET Details to Meet Conditions Full/Outline

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Details of temporary fencing and/or enclosure, in compliance with Condition 8 of planning permission (ref. 2018/02100/COMB) dated 8 February 2019.

As published by the council, reference 2020/01850/DET

Application record

Reference
2020/01850/DET
Type
Details to Meet Conditions Full/Outline
Status
Pending Decision
Received
20 Jul 2020
Validated
21 Jul 2020
Ward
Parsons Green And Walham
Decision by
Delegated - County Matter Application

Site history

Applications at this address on the Hammersmith and Fulham register

This site has had 16 applications since 2019: 8 approved, 0 refused.

  • 2020/01185/ADV Awaiting decision

    Fulham Gasworks Imperial Road London

    Display of externally illuminated advertisement on dibond panels; affixed to hoardings along Michael Road, Sands End Lane.

    Submitted 12 May 2020 Advertising
  • 2020/01088/NMAT Awaiting decision

    Fulham Gasworks Imperial Road London

    Non-material amendment to permission 2018/02100/COMB, 8 Feb 2019, to remove figures / unit numbers from description; amend ground floor of Phases 1a 1b 1c; amend Condition 10 (Floorspace) to increase ancillary residential by 1,622 sqm to 3,420 sqm and reduce D1/D2 use by 1,622 sqm to 2,710 sqm. Planning Application for demolition of existing buildings and structures (excluding No.2 Gasholder, 1856 Chief Engineer's Office, 1927 Former Research Laboratory, 1920 WW1 War Memorial and WW2 War Memorial) and redevelopment to provide a residential-led mixed use development comprising the erection of new buildings ranging from 1 to 37 storeys to provide residential units and ancillary residential facilities (C3 Use) and non-residential floorspace in Use Classes A1, A2, A3, A4, B1, D1 and D2, the provision of a new publicly accessible open space, new pedestrian and vehicle routes, accesses and amenity areas, basement level car park with integral servicing areas, interim works and other associated works: 1) Detailed planning application for residential floorspace together with ancillary residential facilities (C3 Use); flexible commercial floorspace (A1, A2, A3, A4 Uses); community and leisure floorspace (D1/D2 Use); provision of a basement; new pedestrian and vehicular access; provision of amenity space, landscaping, car/cycle parking, refuse storage, energy centre, servicing area, and other associated infrastructure works.2) Outline planning application (with all matters reserved) for residential floorspace and ancillary residential facilities (C3 Use); non-residential floorspace comprising flexible commercial retail (A1, A2, A3, A4 Uses), office (B1 Use), community (D1 Use) and leisure (D2 Use) floorspace; provision of new basement level; new pedestrian and vehicular access; and associated amenity space, publicly accessible open space, landscaping, car/cycle parking, refuse storage, energy centres, servicing area, and other associated infrastructure works.

    Submitted 30 Apr 2020 Amendments
  • 2020/00523/DET Awaiting decision

    Fulham Gasworks Imperial Road London

    Details of green infrastructure - air quality, in compliance with condition 46 in relation to Development Plots A1, A2, and A3 (Phases 1a, 1b, and 1c) of planning permission 2018/02100/COMB dated 8 Febraury 2019.

    Submitted 21 Feb 2020 Conditions
  • 2020/00524/DET Awaiting decision

    Fulham Gasworks Imperial Road London

    Details to discharge condition 33 (green/brown/blue roofs); condition 61 (roads, footways, footpaths and cycleways); condition 81 (urban greening strategy); condition 90 (floodlights, security lights and decorative external lights); condition 92 (soft and hard landscaping); condition 96 (outdoor play spaces) and condition 102 (urban realm strategy) in relation to Development Plots A1, A2, and A3 (Phases 1a, 1b, and 1c) of planning permission 2018/02100/COMB dated 8 February 2019.

    Submitted 21 Feb 2020 Conditions
  • 2020/00525/DET Awaiting decision

    Fulham Gasworks Imperial Road London

    Details of ventilation strategy, in compliance with condition 42 (a) & (b); details of combustion plant, in compliance with condition 45 (a) & (b) in relation to Development Plots A1, A2 & A3 (Phase 1a, 1b & 1c) of planning permission 2018/02100/COMB dated 8 February 2019.

    Submitted 21 Feb 2020 Conditions
  • 2020/00184/LBC Awaiting decision

    Fulham Gasworks Imperial Road London

    Proposed works to Gasholder No.2 (Grade II* listed) located within Phase 4a of planning permission 2018/02100/COMB granted 8 February 2019. Works would comprise of intrusive works to facilitate access to de-water, remove sludge, decontaminate, investigate, assess and record the condition of Gasholder No.2.

    Submitted 22 Jan 2020 Heritage and listed buildings
  • 2019/03747/DET Awaiting decision

    Fulham Gasworks Imperial Road London

    Details of Intrusive Condition Survey Methodology, in compliance with condition 104 dated 8 February 2019.

    Submitted 17 Dec 2019 Conditions
  • 2019/01064/DET Granted

    Fulham Gasworks Imperial Road London

    Details submitted to discharge Condition 14 (Demolition Logistic Plan) and Condition 15 (Demolition Environmental Management Plan) for Phases 1, 2, 3, 4, 5 and 6 of planning permission 2018/02100/COMB dated 8th February 2019.

    Decided 3 Jul 2019 Conditions
  • 2019/01070/DET Granted

    Fulham Gasworks Imperial Road London

    Details of Air Quality Dust Management Plan (AQDMP); in compliance with condition 44 for Phase 0 (Site Wide Demolition) and Phases 1a, 1b, 1c, 2a and 2b; of planning permission (ref: 2018/02100/COMB) dated 8th February 2019.

    Decided 11 Jul 2019 Conditions
  • 2019/01069/DET Granted

    Fulham Gasworks Imperial Road London

    Details of Demolition, Ground and Enabling Works, in compliance with condition 7 of planning permission 2018/02100/COMB dated 8th February 2019.

    Decided 14 May 2019 Conditions

Timeline

Dates from the published record

  1. 20 Jul 2020

    Received by Hammersmith and Fulham

  2. 21 Jul 2020

    Validated

    Checked as complete and ready for consideration.

  3. 22 Aug 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 15 September 2020, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Hammersmith and Fulham took a median of 78 days over the applications it decided in the last year.

Documents

Plans, drawings, consultee responses and the officer's report

8 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What happens while it is decided

This application is with Hammersmith and Fulham for determination, against a statutory target of eight weeks. Over the last year Hammersmith and Fulham decided condition discharge and variation applications in a median of 81 days. More in our guide to how long planning decisions take.

About condition discharge and variation applications

This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.

Nearby applications

Within 500 metres

  • Fulham Gas Works Imperial Road London

    2020/01595/DET Submitted 24 Jun 2020 0m away

    95% historically approved · decision due ~20 Aug

    Details to partially discharge Condition 20 (Contamination - Verification Report) for Plot B1 Phase 2a of planning permission 2018/02100/COMB dated 8 February 2019.

    Awaiting decision Conditions 7 docs
  • Fulham Gas Works Imperial Road London

    2020/00900/DET Submitted 3 Apr 2020 0m away

    95% historically approved · decision due ~29 May

    Detail to partially discharge Condition 12 (Retail Amalgamation); Condition 55 (Extraction & Odour control); Condition 56 (Cleaning Schedule); Condition 58 (Outdoor Seating); Condition 59 (Outside Seating (Operating Hours)); Condition 60 (Operating Hours); Condition 100 (Lifts), relating to development Plot B1 (Phase 2a) of planning permission 2018/02100/COMB dated 8 February 2019.

    Awaiting decision Conditions 4 docs
  • Fulham Gas Works Imperial Road London

    2020/00899/DET Submitted 3 Apr 2020 0m away

    95% historically approved · decision due ~29 May

    Detail to partially discharge condition 43 (Low emissions - Air quality) relating to development Plot B1 (Phase 2a) of planning permission 2018/02100/COMB dated 8 February 2019.

    Awaiting decision Conditions 5 docs
  • Fulham Gas Works Imperial Road London

    2020/03462/DET Submitted 24 Dec 2020 0m away

    Details to discharge Condition 10 (Highway Works) of planning permission (ref 2020/00748/FUL) granted 13 May 2020.

    Granted Conditions 8 docs
  • Fulham Gas Works Imperial Road London

    2020/00860/LBC Submitted 30 Mar 2020 0m away

    100% historically approved · decision due ~25 May

    Proposed works to 1856 Chief Engineer's Office (Grade II Listed) and 1927 Former Research Laboratory (Grade II Listed) located within Phases C1 and C2 of planning permission 2018/02100/COMB granted 8 February 2019. Works would comprise Soft Strip works to allow the constructional detailing and condition of the building fabric that is currently concealed, to be confirmed by the removal of modern insertions and finishes and/or older finishes to allow the underlying fabric to be exposed. The Soft Strip will improve the understanding of the Listed Buildings and as such will inform the design proposals, including their original proportions and layouts, the functionality of the buildings andovercome practical problems such as identifying service routes to minimise the impact on the historic fabric.

    Awaiting decision Heritage and listed buildings 11 docs
  • Fulham Gas Works Imperial Road London

    2020/00851/DET Submitted 30 Mar 2020 0m away

    95% historically approved · decision due ~25 May

    Details to discharge conditions 22(b) (Archaeology (GLAAS)); Condition 29 (a) (b) (Water Network (Thames Water)); Condition 63 (Safe Use of Drop-off Locations); Condition 65 (Cycle Parking); Condition 69 (Car & Cycle Parking Management Plan); Condition 70 (Delivery and Servicing Management Plan); Condition 85 (Window Cleaning Equipment); Condition 91 (Lights Off); Condition 97 (street Furniture); Condition 98 (Access Management Plan) Development Plot B1, Phase 2a for planning application 2018/02100/COMB dated 8 February 2019.

    Awaiting decision Conditions Windows or glazing 14 docs

In Hammersmith and Fulham

  • 25 St Peter'S Square, London, W6 9NW

    Submission of details of Full details, including photographs of physical samples, of materials to be used on the external surfaces of the building, boundary walls and ground surfaces pursuant to condition 3 of planning application ref: 2025/02038/LBC granted 2nd July 2026.

    3 Jul 2026 Conditions
  • 517-523 Fulham Road, London, SW6 1HD

    Submission of details pursuant to Condition 7 (Anti-Vibration) of the planning permission reference: 2024/02201/FUL dated 24th September 2025.

    18 Jun 2026 Conditions
  • 3 Shortlands, London, W6 8DA

    Submission of details of secured by design pursuant to condition 31 of planning permission ref: 2025/01723/FUL granted 1st July 2026.

    7 Jul 2026 Conditions
  • 11 Farm Lane, London, SW6 1PU

    Submission of details of a post installation compliance report of the approved ventilation strategy, pursuant to Condition 17 of the planning permission reference: 2022/03329/FR3 dated 19th July 2023.

    6 Jul 2026 Conditions
  • 20 Avonmore Road, London, W14 8RR

    Submission of details on the use of tall plant/scaffolding, in consultation with TFL Infrastructure Protection, pursuant to Condition 19 of planning permission reference: 2024/01752/FUL dated 10th December 2025.

    22 Jun 2026 Conditions