Skip to content
PlanIndex Get alerts
Menu

Planning application

Fulham Gasworks Imperial Road London

Awaiting decision Hammersmith and Fulham 2020/00525/DET Details to Meet Conditions Full/Outline

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Details of ventilation strategy, in compliance with condition 42 (a) & (b); details of combustion plant, in compliance with condition 45 (a) & (b) in relation to Development Plots A1, A2 & A3 (Phase 1a, 1b & 1c) of planning permission 2018/02100/COMB dated 8 February 2019.

As published by the council, reference 2020/00525/DET

Application record

Reference
2020/00525/DET
Type
Details to Meet Conditions Full/Outline
Status
Pending Consideration
Received
21 Feb 2020
Validated
24 Feb 2020
Decided
23 Sep 2020
Ward
Parsons Green And Walham
Decision by
Delegated Decision

Site history

Applications at this address on the Hammersmith and Fulham register

This site has had 24 applications since 2019: 15 approved, 0 refused.

  • 2020/01850/DET Awaiting decision

    Fulham Gasworks Imperial Road London

    Details of temporary fencing and/or enclosure, in compliance with Condition 8 of planning permission (ref. 2018/02100/COMB) dated 8 February 2019.

    Submitted 20 Jul 2020 Conditions
  • 2020/01185/ADV Awaiting decision

    Fulham Gasworks Imperial Road London

    Display of externally illuminated advertisement on dibond panels; affixed to hoardings along Michael Road, Sands End Lane.

    Decided 2 Sep 2020 Advertising
  • 2020/01088/NMAT Awaiting decision

    Fulham Gasworks Imperial Road London

    Non-material amendment to permission 2018/02100/COMB, 8 Feb 2019, to remove figures / unit numbers from description; amend ground floor of Phases 1a 1b 1c; amend Condition 10 (Floorspace) to increase ancillary residential by 1,622 sqm to 3,420 sqm and reduce D1/D2 use by 1,622 sqm to 2,710 sqm. Planning Application for demolition of existing buildings and structures (excluding No.2 Gasholder, 1856 Chief Engineer's Office, 1927 Former Research Laboratory, 1920 WW1 War Memorial and WW2 War Memorial) and redevelopment to provide a residential-led mixed use development comprising the erection of new buildings ranging from 1 to 37 storeys to provide residential units and ancillary residential facilities (C3 Use) and non-residential floorspace in Use Classes A1, A2, A3, A4, B1, D1 and D2, the provision of a new publicly accessible open space, new pedestrian and vehicle routes, accesses and amenity areas, basement level car park with integral servicing areas, interim works and other associated works: 1) Detailed planning application for residential floorspace together with ancillary residential facilities (C3 Use); flexible commercial floorspace (A1, A2, A3, A4 Uses); community and leisure floorspace (D1/D2 Use); provision of a basement; new pedestrian and vehicular access; provision of amenity space, landscaping, car/cycle parking, refuse storage, energy centre, servicing area, and other associated infrastructure works.2) Outline planning application (with all matters reserved) for residential floorspace and ancillary residential facilities (C3 Use); non-residential floorspace comprising flexible commercial retail (A1, A2, A3, A4 Uses), office (B1 Use), community (D1 Use) and leisure (D2 Use) floorspace; provision of new basement level; new pedestrian and vehicular access; and associated amenity space, publicly accessible open space, landscaping, car/cycle parking, refuse storage, energy centres, servicing area, and other associated infrastructure works.

    Decided 15 Jul 2020 Amendments
  • 2020/00523/DET Awaiting decision

    Fulham Gasworks Imperial Road London

    Details of green infrastructure - air quality, in compliance with condition 46 in relation to Development Plots A1, A2, and A3 (Phases 1a, 1b, and 1c) of planning permission 2018/02100/COMB dated 8 Febraury 2019.

    Decided 30 Mar 2021 Conditions
  • 2020/00524/DET Awaiting decision

    Fulham Gasworks Imperial Road London

    Details to discharge condition 33 (green/brown/blue roofs); condition 61 (roads, footways, footpaths and cycleways); condition 81 (urban greening strategy); condition 90 (floodlights, security lights and decorative external lights); condition 92 (soft and hard landscaping); condition 96 (outdoor play spaces) and condition 102 (urban realm strategy) in relation to Development Plots A1, A2, and A3 (Phases 1a, 1b, and 1c) of planning permission 2018/02100/COMB dated 8 February 2019.

    Decided 27 Aug 2020 Conditions
  • 2020/00184/LBC Awaiting decision

    Fulham Gasworks Imperial Road London

    Proposed works to Gasholder No.2 (Grade II* listed) located within Phase 4a of planning permission 2018/02100/COMB granted 8 February 2019. Works would comprise of intrusive works to facilitate access to de-water, remove sludge, decontaminate, investigate, assess and record the condition of Gasholder No.2.

    Submitted 22 Jan 2020 Heritage and listed buildings
  • 2019/03747/DET Awaiting decision

    Fulham Gasworks Imperial Road London

    Details of Intrusive Condition Survey Methodology, in compliance with condition 104 dated 8 February 2019.

    Decided 5 Oct 2020 Conditions
  • 2019/02313/DET Awaiting decision

    Fulham Gasworks Imperial Road London

    Details of Air Quality Assessment, in compliance with condition 41 of planning permission 2018/02100/COMB dated 8th February 2019.

    Decided 18 Sep 2020 Conditions
  • 2019/01792/DET Granted

    Fulham Gasworks Imperial Road London

    Details to partially discharge Conditions 18 (Detailed Quantitative Risk Assessment Report) and 19 (Remediation Method Statement) to allow Enabling Works as defined by this application for Phases 1a, 1b, 1c and 2a of planning permission (ref: 2018/02100/COMB) dated 8 February 2019.Enabling Works for this application is limited to building foundation removal (Phases 1a, 1b, 1c); installation of attenuation tank (Phases 1a, 1b, 1c); ground levelling (Phases 1a, 1b, 1c); excavations for the placement of piling mats (Phases 1a, 1b, 1c, 2a); piling (Phases 1a, 1b, 1c, 2a); landscaping (Phase 2a) and remediation of contamination encountered during these works. The works do not include the main excavation of Phases 1a, 1b and 1c basement.

    Decided 9 Sep 2019 Conditions
  • 2019/01608/DET Granted

    Fulham Gasworks Imperial Road London

    Details to discharge Condition 27 (Flood Risk Assessment); Condition 28i (Outline Drainage Strategy); and Condition 32 (Site Wide Drainage Strategy) for all Phases; plus details to discharge Condition 28ii (Detailed Drainage Strategy) for Phases 1a, 1b, 1c and Phase 2a of planning permission 2018/02100/COMB dated 8 February 2019.

    Decided 20 Aug 2019 Conditions

Timeline

Dates from the published record

  1. 21 Feb 2020

    Received by Hammersmith and Fulham

  2. 24 Feb 2020

    Validated

    Checked as complete and ready for consideration.

  3. 23 Sep 2020

    Decision issued

  4. 22 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

13 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What happens while it is decided

This application is with Hammersmith and Fulham for determination, against a statutory target of eight weeks. Over the last year Hammersmith and Fulham decided condition discharge and variation applications in a median of 102 days. More in our guide to how long planning decisions take.

About condition discharge and variation applications

This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • Fulham Gas Works Imperial Road London

    2020/03251/DET Submitted 7 Dec 2020 50 yards away

    Details to construct a single storey temporary show apartment within Phase 1b (Development Plot A3) for a period of 18 months; in compliance with Condition 11 (Temporary Land Uses) of planning permission (ref: 2018/02100/COMB) dated 8 February 2019.

    Granted Conditions 8 docs
    Small domestic
  • Fulham Gas Works Imperial Road London

    2021/00320/DET Submitted 1 Feb 2021 50 yards away

    95% historically approved · decision due ~30 Mar

    Details to discharge conditions 74 (1:20 Details) and condition 75 (A1/A3 1:20 Details) of planning permission 2018/02100/COMB dated

    Awaiting decision Conditions 14 docs
  • Fulham Gasworks Imperial Road London

    2019/00755/RES Submitted 14 Mar 2019 50 yards away

    Reserved Matters Application (access, appearance, landscaping, layout and scale) in respect of Phase 2a (Development Plot B1) for the erection of a single storey pavilion-style building comprising 205sqm of flexible floorspace (Use Classes A1, A2, A3, A4 and B1) with associated landscaping pursuant to planning application 2018/02100/COMB granted 8 February 2019 (comprehensive residential led mixed use redevelopment of the former Gasworks Site).

    Granted Reserved matters 31 docs
    Small domestic
  • 30 - 32 Bradmore Park Road London W6 0DT

    2019/00715/DET Submitted 11 Mar 2019 50 yards away

    Details of demolition notice, in compliance with condition 3 of planning permission (ref: 2017/03836/FUL) dated 22nd December 2017.

    Granted Conditions Demolition 13 docs
  • Fulham Gasworks Imperial Road London

    2019/02313/DET Submitted 2 Aug 2019 50 yards away

    Details of Air Quality Assessment, in compliance with condition 41 of planning permission 2018/02100/COMB dated 8th February 2019.

    Awaiting decision Conditions 5 docs
  • Fulham Gas Works Imperial Road London

    2021/00210/DET Submitted 22 Jan 2021 50 yards away

    95% historically approved · decision due ~22 Mar

    Details to partially discharge condition 11 (Temporary land uses - Temporary Welfare Drawing Package), of planning permission 2018/02100/COMB dated 8 February 2019.

    Awaiting decision Conditions 4 docs

In Hammersmith and Fulham

  • 50 Brook Green, London, W6 7BJ

    Submission of a Demolition Logistics Plan, pursuant to Condition 4; a Construction Logistics Plan, pursuant to Condition 5; an updated Arboricultural Impact Assessment and Tree Protection Plan, pursuant to Condition 17; details of accessible units, pursuant to Condition 23; and details of Air Quality Emissions Control of Non-Road Mobile Machinery (NRMM), pursuant to Conditions 35 and 36 of the planning permission reference: 2025/00492/VAR dated 5th May 2026.

    Received 21 May, published by the council 24 Jul 2026 Conditions
  • 574 - 580 King's Road, London, SW6 2DY

    Submission of details of a Ventilation Strategy Report, pursuant to Condition 16 of the planning permission reference: 2025/01090/FUL dated 27th November 2025.

    Received 28 May, published by the council 24 Jul 2026 Conditions
  • P/2026/02566/DET Awaiting decision

    Former Dairy Crest Site,Land Beneath And Bounded By Westway And,West London Railway Line And Adjoining,58 Wood Lane,London W12

    Details to discharge Condition 12 (temporary fencing and/or enclosure) relating to Development Zone 3 ('DZ3') of planning planning permission 2025/02724/VAR dated 9 September 2026.

    Received 6 Oct, published by the council 9 Oct 2026 Conditions
  • P/2026/02562/DET Awaiting decision

    Former Dairy Crest Site,Land Beneath And Bounded By Westway And,West London Railway Line And Adjoining,58 Wood Lane,London W12

    Details to discharge Condition 21 (Piling Method Statement) relating to Development Zone 3 ('DZ3') of planning planning permission 2025/02724/VAR dated 9 September 2026.

    Received 6 Oct, published by the council 9 Oct 2026 Conditions
  • P/2026/02563/DET Awaiting decision

    Former Dairy Crest Site,Land Beneath And Bounded By Westway And,West London Railway Line And Adjoining,58 Wood Lane,London W12

    Details to discharge Condition 10 (Construction Management Plan (CMP)) of planning planning permission 2025/02724/VAR dated 9 September 2026.

    Received 6 Oct, published by the council 9 Oct 2026 Conditions