Planning application
Fulham Gasworks Imperial Road London
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Proposed works to Gasholder No.2 (Grade II* listed) located within Phase 4a of planning permission 2018/02100/COMB granted 8 February 2019. Works would comprise of intrusive works to facilitate access to de-water, remove sludge, decontaminate, investigate, assess and record the condition of Gasholder No.2.
As published by the council, reference 2020/00184/LBC
Application record
- Reference
- 2020/00184/LBC
- Type
- Listed Building Consent
- Status
- Pending Consideration
- Received
- 22 Jan 2020
- Validated
- 23 Jan 2020
- Ward
- Parsons Green And Walham
- Decision by
- Delegated Decision
Site history
Applications at this address on the Hammersmith and Fulham register
This site has had 24 applications since 2019: 15 approved, 0 refused.
-
2020/01850/DET Awaiting decision
Fulham Gasworks Imperial Road London
Details of temporary fencing and/or enclosure, in compliance with Condition 8 of planning permission (ref. 2018/02100/COMB) dated 8 February 2019.
-
2020/01185/ADV Awaiting decision
Fulham Gasworks Imperial Road London
Display of externally illuminated advertisement on dibond panels; affixed to hoardings along Michael Road, Sands End Lane.
-
2020/01088/NMAT Awaiting decision
Fulham Gasworks Imperial Road London
Non-material amendment to permission 2018/02100/COMB, 8 Feb 2019, to remove figures / unit numbers from description; amend ground floor of Phases 1a 1b 1c; amend Condition 10 (Floorspace) to increase ancillary residential by 1,622 sqm to 3,420 sqm and reduce D1/D2 use by 1,622 sqm to 2,710 sqm. Planning Application for demolition of existing buildings and structures (excluding No.2 Gasholder, 1856 Chief Engineer's Office, 1927 Former Research Laboratory, 1920 WW1 War Memorial and WW2 War Memorial) and redevelopment to provide a residential-led mixed use development comprising the erection of new buildings ranging from 1 to 37 storeys to provide residential units and ancillary residential facilities (C3 Use) and non-residential floorspace in Use Classes A1, A2, A3, A4, B1, D1 and D2, the provision of a new publicly accessible open space, new pedestrian and vehicle routes, accesses and amenity areas, basement level car park with integral servicing areas, interim works and other associated works: 1) Detailed planning application for residential floorspace together with ancillary residential facilities (C3 Use); flexible commercial floorspace (A1, A2, A3, A4 Uses); community and leisure floorspace (D1/D2 Use); provision of a basement; new pedestrian and vehicular access; provision of amenity space, landscaping, car/cycle parking, refuse storage, energy centre, servicing area, and other associated infrastructure works.2) Outline planning application (with all matters reserved) for residential floorspace and ancillary residential facilities (C3 Use); non-residential floorspace comprising flexible commercial retail (A1, A2, A3, A4 Uses), office (B1 Use), community (D1 Use) and leisure (D2 Use) floorspace; provision of new basement level; new pedestrian and vehicular access; and associated amenity space, publicly accessible open space, landscaping, car/cycle parking, refuse storage, energy centres, servicing area, and other associated infrastructure works.
-
2020/00523/DET Awaiting decision
Fulham Gasworks Imperial Road London
Details of green infrastructure - air quality, in compliance with condition 46 in relation to Development Plots A1, A2, and A3 (Phases 1a, 1b, and 1c) of planning permission 2018/02100/COMB dated 8 Febraury 2019.
-
2020/00524/DET Awaiting decision
Fulham Gasworks Imperial Road London
Details to discharge condition 33 (green/brown/blue roofs); condition 61 (roads, footways, footpaths and cycleways); condition 81 (urban greening strategy); condition 90 (floodlights, security lights and decorative external lights); condition 92 (soft and hard landscaping); condition 96 (outdoor play spaces) and condition 102 (urban realm strategy) in relation to Development Plots A1, A2, and A3 (Phases 1a, 1b, and 1c) of planning permission 2018/02100/COMB dated 8 February 2019.
-
2020/00525/DET Awaiting decision
Fulham Gasworks Imperial Road London
Details of ventilation strategy, in compliance with condition 42 (a) & (b); details of combustion plant, in compliance with condition 45 (a) & (b) in relation to Development Plots A1, A2 & A3 (Phase 1a, 1b & 1c) of planning permission 2018/02100/COMB dated 8 February 2019.
-
2019/03747/DET Awaiting decision
Fulham Gasworks Imperial Road London
Details of Intrusive Condition Survey Methodology, in compliance with condition 104 dated 8 February 2019.
-
2019/02313/DET Awaiting decision
Fulham Gasworks Imperial Road London
Details of Air Quality Assessment, in compliance with condition 41 of planning permission 2018/02100/COMB dated 8th February 2019.
-
2019/01792/DET Granted
Fulham Gasworks Imperial Road London
Details to partially discharge Conditions 18 (Detailed Quantitative Risk Assessment Report) and 19 (Remediation Method Statement) to allow Enabling Works as defined by this application for Phases 1a, 1b, 1c and 2a of planning permission (ref: 2018/02100/COMB) dated 8 February 2019.Enabling Works for this application is limited to building foundation removal (Phases 1a, 1b, 1c); installation of attenuation tank (Phases 1a, 1b, 1c); ground levelling (Phases 1a, 1b, 1c); excavations for the placement of piling mats (Phases 1a, 1b, 1c, 2a); piling (Phases 1a, 1b, 1c, 2a); landscaping (Phase 2a) and remediation of contamination encountered during these works. The works do not include the main excavation of Phases 1a, 1b and 1c basement.
-
2019/01608/DET Granted
Fulham Gasworks Imperial Road London
Details to discharge Condition 27 (Flood Risk Assessment); Condition 28i (Outline Drainage Strategy); and Condition 32 (Site Wide Drainage Strategy) for all Phases; plus details to discharge Condition 28ii (Detailed Drainage Strategy) for Phases 1a, 1b, 1c and Phase 2a of planning permission 2018/02100/COMB dated 8 February 2019.
Timeline
Dates from the published record
-
22 Jan 2020
Received by Hammersmith and Fulham
-
23 Jan 2020
Validated
Checked as complete and ready for consideration.
-
22 Aug 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 19 March 2020, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Hammersmith and Fulham took a median of 80 days over the applications it decided in the last year.
Documents
Plans, drawings, consultee responses and the officer's report
17 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat happens while it is decided
This application is with Hammersmith and Fulham for determination, against a statutory target of eight weeks. Over the last year Hammersmith and Fulham decided heritage and listed building applications in a median of 164 days. More in our guide to how long planning decisions take.
About heritage and listed building applications
Listed building consent is needed for works that affect the special interest of a listed building, and carrying out such works without it is a criminal offence. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Fulham Gas Works Imperial Road London
Details to partially discharge Condition 20 (Contamination - Verification Report) for Plot B1 Phase 2a of planning permission 2018/02100/COMB dated 8 February 2019.
Awaiting decision Conditions 7 docs -
Fulham Gas Works Imperial Road London
Detail to partially discharge Condition 12 (Retail Amalgamation); Condition 55 (Extraction & Odour control); Condition 56 (Cleaning Schedule); Condition 58 (Outdoor Seating); Condition 59 (Outside Seating (Operating Hours)); Condition 60 (Operating Hours); Condition 100 (Lifts), relating to development Plot B1 (Phase 2a) of planning permission 2018/02100/COMB dated 8 February 2019.
Awaiting decision Conditions 4 docs -
Fulham Gas Works Imperial Road London
Detail to partially discharge condition 43 (Low emissions - Air quality) relating to development Plot B1 (Phase 2a) of planning permission 2018/02100/COMB dated 8 February 2019.
Awaiting decision Conditions 5 docs -
Fulham Gas Works Imperial Road London
Details to discharge Condition 10 (Highway Works) of planning permission (ref 2020/00748/FUL) granted 13 May 2020.
Granted Conditions 8 docs -
Fulham Gasworks Imperial Road London
95% historically approved · decision due ~15 Sep
Details of temporary fencing and/or enclosure, in compliance with Condition 8 of planning permission (ref. 2018/02100/COMB) dated 8 February 2019.
Awaiting decision Conditions 8 docs -
Fulham Gas Works Imperial Road London
Proposed works to 1856 Chief Engineer's Office (Grade II Listed) and 1927 Former Research Laboratory (Grade II Listed) located within Phases C1 and C2 of planning permission 2018/02100/COMB granted 8 February 2019. Works would comprise Soft Strip works to allow the constructional detailing and condition of the building fabric that is currently concealed, to be confirmed by the removal of modern insertions and finishes and/or older finishes to allow the underlying fabric to be exposed. The Soft Strip will improve the understanding of the Listed Buildings and as such will inform the design proposals, including their original proportions and layouts, the functionality of the buildings andovercome practical problems such as identifying service routes to minimise the impact on the historic fabric.
Awaiting decision Heritage and listed buildings 11 docs
Other heritage and listed building applications
In Hammersmith and Fulham
-
P/2026/02560/LBC Awaiting decision
12 And 13 Hammersmith Terrace, London, W6 9TS
Replacement of 3no. existing single glazed timber framed sash windows with new double glazed timber framed sash windows, to the rear elevation at second floor level (no.13); internal alterations to include: removal of modern cupboard/former WC to northern wall, construction of a partition wall and doorway with four-panelled timber door between hallway and front (northern) room, and removal of modern glazed door and surrounding plasterboard nibs between front and rear rooms at ground floor level; removal of partition wall between rear (southern) bedrooms at second floor level; and associated external and internal alterations (no.13).
-
P/2026/01935/LBC Granted
The Grampians Shepherd'S Bush Road, London, W6 7LN
Installation of approximately 120 metres of new telecommunications cabling between the internal network entry point and the existing rooftop telecommunications cabinet, including a new cable upturn, new internal and external trunking, one new drilled penetration through an external wall, utilisation of existing cable trays, existing roof penetration and termination within the existing Network Termination Point (NTP); associated internal and external alterations.
-
P/2026/02505/LBC Awaiting decision
Langford Primary School Gilstead Road, London, SW6 2LG
Alterations to the Langford Primary School (Courtyard Building) to include; installation of new foul water connections, to include minor groundworks and small diameter service penetrations through external walls; installation of CCTV cameras and associated cabling and conduit; repairs to roof; repair of existing accessible toilet to include replacement of plywood floorboards, vinyl flooring, and wall plasterboard, and installation of new pipes/gully; repair of internal timber arches; repairs to damaged plasterboard; associated external and internal works.
-
P/2026/02507/LBC Awaiting decision
The Glass House 11-12 Lettice Street, London, SW6 4EH
External alterations to include; installation of 6no. rooflights in the rear roofslope and 2no. rooflights in the side roofslope; installation of 2no. air conditioning condenser units, and a like-for-like replacement of an existing timber framed window to the rear elevation at first floor level; internal alterations to include; creation of a mezzanine floor at second floor, reconfiguration of the existing floorspace at first floor level, incorporating the lowering of an existing mezzanine at first floor level and the addition of new internal stairs and walkways, including glazed partitions and screening, works to the existing roof structure to facilitate a thermal upgrade; associated internal and external alterations.
-
P/2026/01307/LBC Granted
Queen Adelaide, 412 Uxbridge Road, London, W12 0NR
Replacement of existing projecting sign with new double sided externally illuminated projecting sign to southern elevation of the building; replacement of linolite lighting with warm white illumination (below 300 cd/m²), re-lamping of 3 lanterns (low luminance), retention of menu case and directional lighting, retention and repainting of boundary planters to southern elevation of the building; retention of menu case and directional lighting (to the corner elevation facing and Uxbridge Road and Adelaide Grove).