Skip to content
PlanIndex Get alerts
Menu

Planning application

Fulham Gasworks Imperial Road London

Awaiting decision Hammersmith and Fulham 2020/01088/NMAT Non-Material Amendment Submission

Works: Demolition

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Non-material amendment to permission 2018/02100/COMB, 8 Feb 2019, to remove figures / unit numbers from description; amend ground floor of Phases 1a 1b 1c; amend Condition 10 (Floorspace) to increase ancillary residential by 1,622 sqm to 3,420 sqm and reduce D1/D2 use by 1,622 sqm to 2,710 sqm. Planning Application for demolition of existing buildings and structures (excluding No.2 Gasholder, 1856 Chief Engineer's Office, 1927 Former Research Laboratory, 1920 WW1 War Memorial and WW2 War Memorial) and redevelopment to provide a residential-led mixed use development comprising the erection of new buildings ranging from 1 to 37 storeys to provide residential units and ancillary residential facilities (C3 Use) and non-residential floorspace in Use Classes A1, A2, A3, A4, B1, D1 and D2, the provision of a new publicly accessible open space, new pedestrian and vehicle routes, accesses and amenity areas, basement level car park with integral servicing areas, interim works and other associated works: 1) Detailed planning application for residential floorspace together with ancillary residential facilities (C3 Use); flexible commercial floorspace (A1, A2, A3, A4 Uses); community and leisure floorspace (D1/D2 Use); provision of a basement; new pedestrian and vehicular access; provision of amenity space, landscaping, car/cycle parking, refuse storage, energy centre, servicing area, and other associated infrastructure works.2) Outline planning application (with all matters reserved) for residential floorspace and ancillary residential facilities (C3 Use); non-residential floorspace comprising flexible commercial retail (A1, A2, A3, A4 Uses), office (B1 Use), community (D1 Use) and leisure (D2 Use) floorspace; provision of new basement level; new pedestrian and vehicular access; and associated amenity space, publicly accessible open space, landscaping, car/cycle parking, refuse storage, energy centres, servicing area, and other associated infrastructure works.

As published by the council, reference 2020/01088/NMAT

Application record

Reference
2020/01088/NMAT
Type
Non-Material Amendment Submission
Status
Pending Decision
Received
30 Apr 2020
Validated
1 May 2020
Decided
15 Jul 2020
Ward
Parsons Green And Walham
Decision by
Delegated Decision

Site history

Applications at this address on the Hammersmith and Fulham register

This site has had 24 applications since 2019: 15 approved, 0 refused.

  • 2020/01850/DET Awaiting decision

    Fulham Gasworks Imperial Road London

    Details of temporary fencing and/or enclosure, in compliance with Condition 8 of planning permission (ref. 2018/02100/COMB) dated 8 February 2019.

    Submitted 20 Jul 2020 Conditions
  • 2020/01185/ADV Awaiting decision

    Fulham Gasworks Imperial Road London

    Display of externally illuminated advertisement on dibond panels; affixed to hoardings along Michael Road, Sands End Lane.

    Decided 2 Sep 2020 Advertising
  • 2020/00523/DET Awaiting decision

    Fulham Gasworks Imperial Road London

    Details of green infrastructure - air quality, in compliance with condition 46 in relation to Development Plots A1, A2, and A3 (Phases 1a, 1b, and 1c) of planning permission 2018/02100/COMB dated 8 Febraury 2019.

    Decided 30 Mar 2021 Conditions
  • 2020/00524/DET Awaiting decision

    Fulham Gasworks Imperial Road London

    Details to discharge condition 33 (green/brown/blue roofs); condition 61 (roads, footways, footpaths and cycleways); condition 81 (urban greening strategy); condition 90 (floodlights, security lights and decorative external lights); condition 92 (soft and hard landscaping); condition 96 (outdoor play spaces) and condition 102 (urban realm strategy) in relation to Development Plots A1, A2, and A3 (Phases 1a, 1b, and 1c) of planning permission 2018/02100/COMB dated 8 February 2019.

    Decided 27 Aug 2020 Conditions
  • 2020/00525/DET Awaiting decision

    Fulham Gasworks Imperial Road London

    Details of ventilation strategy, in compliance with condition 42 (a) & (b); details of combustion plant, in compliance with condition 45 (a) & (b) in relation to Development Plots A1, A2 & A3 (Phase 1a, 1b & 1c) of planning permission 2018/02100/COMB dated 8 February 2019.

    Decided 23 Sep 2020 Conditions
  • 2020/00184/LBC Awaiting decision

    Fulham Gasworks Imperial Road London

    Proposed works to Gasholder No.2 (Grade II* listed) located within Phase 4a of planning permission 2018/02100/COMB granted 8 February 2019. Works would comprise of intrusive works to facilitate access to de-water, remove sludge, decontaminate, investigate, assess and record the condition of Gasholder No.2.

    Submitted 22 Jan 2020 Heritage and listed buildings
  • 2019/03747/DET Awaiting decision

    Fulham Gasworks Imperial Road London

    Details of Intrusive Condition Survey Methodology, in compliance with condition 104 dated 8 February 2019.

    Decided 5 Oct 2020 Conditions
  • 2019/02313/DET Awaiting decision

    Fulham Gasworks Imperial Road London

    Details of Air Quality Assessment, in compliance with condition 41 of planning permission 2018/02100/COMB dated 8th February 2019.

    Decided 18 Sep 2020 Conditions
  • 2019/01792/DET Granted

    Fulham Gasworks Imperial Road London

    Details to partially discharge Conditions 18 (Detailed Quantitative Risk Assessment Report) and 19 (Remediation Method Statement) to allow Enabling Works as defined by this application for Phases 1a, 1b, 1c and 2a of planning permission (ref: 2018/02100/COMB) dated 8 February 2019.Enabling Works for this application is limited to building foundation removal (Phases 1a, 1b, 1c); installation of attenuation tank (Phases 1a, 1b, 1c); ground levelling (Phases 1a, 1b, 1c); excavations for the placement of piling mats (Phases 1a, 1b, 1c, 2a); piling (Phases 1a, 1b, 1c, 2a); landscaping (Phase 2a) and remediation of contamination encountered during these works. The works do not include the main excavation of Phases 1a, 1b and 1c basement.

    Decided 9 Sep 2019 Conditions
  • 2019/01608/DET Granted

    Fulham Gasworks Imperial Road London

    Details to discharge Condition 27 (Flood Risk Assessment); Condition 28i (Outline Drainage Strategy); and Condition 32 (Site Wide Drainage Strategy) for all Phases; plus details to discharge Condition 28ii (Detailed Drainage Strategy) for Phases 1a, 1b, 1c and Phase 2a of planning permission 2018/02100/COMB dated 8 February 2019.

    Decided 20 Aug 2019 Conditions

Timeline

Dates from the published record

  1. 30 Apr 2020

    Received by Hammersmith and Fulham

  2. 1 May 2020

    Validated

    Checked as complete and ready for consideration.

  3. 15 Jul 2020

    Decision issued

  4. 22 Aug 2026

    Added to PlanIndex

Cases linked to this one on the register

2 later applications on the register refer to this one:

  • P/2026/01890/VAR Awaiting decision

    Fulham Gas Works Imperial Road London

    Variation of Condition 1 (Drawings) of reserved matters details relating to the approval of access; appearance; landscaping; layout and scale in respect of Phases 4b, 4c and 4d (Development Plots H1 and H2); for the erection of two buildings comprising residential and non-residential floorspace with associated landscaping approved under 2024/01420/RES granted 17 January 2025 of planning permission 2018/02100/COMB granted 8 February 2019 (as amended by refs 2020/01088/NMAT and 2024/00818/NMAT). As varied by 2024/00961/VAR variation of Condition 4 (Drawings) and Condition 5 (Design Codes and Parameter Plans) of planning permission 2018/02100/COMB granted 8 Feb 2019 (as amended by refs 2020/01088/NMAT and 2024/00818/NMAT). The proposed amendments to Phase 4b Development Plot H1 comprise: (a) revisions to tower and shoulder terrace heights within consented maximum parameter heights (comprising an increase in shoulder height and reduction in tower height); (b) changes to the arrangemen... read more

    Submitted 15 May 2026 Amendments
  • 2020/01779/VAR Awaiting decision

    Fulham Gas Works Imperial Road London

    Variation of Conditions 2 (Time Limits), 4 (Drawings), 5 (Design Codes and Parameter Plans) and 10 (Gross External Floorspace) of planning permission 2018/02100/COMB granted 8 Feb 2019 (as amended by Non-Material Amendment 2020/01088/NMAT, 15 Jul 2020);'Planning Application (part-detailed, part-outline) for demolition of existing buildings and structures (excl. No.2 Gasholder, 1856 Chief Engineer's Office, 1927 Research Laboratory, 1920 WW1 War Memorial and WW2 War Memorial) and redevelopment to provide a residential-led mixed use development comprising the erection of new buildings ranging from 1 to 37 storeys. (1) Detailed planning application for residential floorspace together with ancillary residential facilities (C3 Use); flexible commercial floorspace (A1, A2, A3, A4 Uses); community and leisure floorspace (D1/D2 Use); provision of a basement; new pedestrian and vehicular access; provision of amenity space, landscaping, car/cycle parking, refuse storage, energy centre, servicing area, and other associated infrastructure works. (2) Outline planning application (with all matters reserved) for residential floorspace and ancillary residential facilities (C3 Use); non-residential floorspace comprising flexible commercial retail (A1, A2, A3, A4 Uses), office (B1 Use), community (D1 Use) and leisure (D2 Use) floorspace; provision of new basement level; new pedestrian and vehicular access; and associated amenity space, publicly accessible open space, landscaping, car/cycle parking, refuse storage, energy centres, servicing area, and other associated infrastructure works.'Amendments comprise; (a) changes to the phasing programme/phasing order; (b) delivery of a temporary link road to allow for temporary vehicular access to the Site; (c) amendments to the maximum basement parameter; (d) amended service access/egress into the basement to be off Michael Road; and (e) amendments to the permitted shoulder height of Plots E1 and E2 (no change to overall height).

    Submitted 10 Jul 2020 Conditions

Documents

Plans, drawings, consultee responses and the officer's report

6 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What happens while it is decided

This application is with Hammersmith and Fulham for determination, against a statutory target of eight weeks. Over the last year Hammersmith and Fulham decided amendment applications in a median of 61 days. More in our guide to how long planning decisions take.

About amendment applications

An amendment application makes limited changes to a permission that already exists; anything beyond modest adjustment needs a fresh application. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • Fulham Gas Works Imperial Road London

    2020/01595/DET Submitted 24 Jun 2020 50 yards away

    Details to partially discharge Condition 20 (Contamination - Verification Report) for Plot B1 Phase 2a of planning permission 2018/02100/COMB dated 8 February 2019.

    Awaiting decision Conditions 7 docs
  • Fulham Gas Works Imperial Road London

    2020/00900/DET Submitted 3 Apr 2020 50 yards away

    Detail to partially discharge Condition 12 (Retail Amalgamation); Condition 55 (Extraction & Odour control); Condition 56 (Cleaning Schedule); Condition 58 (Outdoor Seating); Condition 59 (Outside Seating (Operating Hours)); Condition 60 (Operating Hours); Condition 100 (Lifts), relating to development Plot B1 (Phase 2a) of planning permission 2018/02100/COMB dated 8 February 2019.

    Awaiting decision Conditions 4 docs
  • Fulham Gas Works Imperial Road London

    2020/00899/DET Submitted 3 Apr 2020 50 yards away

    Detail to partially discharge condition 43 (Low emissions - Air quality) relating to development Plot B1 (Phase 2a) of planning permission 2018/02100/COMB dated 8 February 2019.

    Awaiting decision Conditions 5 docs
  • Fulham Gas Works Imperial Road London

    2020/03462/DET Submitted 24 Dec 2020 50 yards away

    Details to discharge Condition 10 (Highway Works) of planning permission (ref 2020/00748/FUL) granted 13 May 2020.

    Granted Conditions 8 docs
  • Fulham Gasworks Imperial Road London

    2020/01850/DET Submitted 20 Jul 2020 50 yards away

    95% historically approved · decision due ~15 Sep

    Details of temporary fencing and/or enclosure, in compliance with Condition 8 of planning permission (ref. 2018/02100/COMB) dated 8 February 2019.

    Awaiting decision Conditions 8 docs
  • Fulham Gas Works Imperial Road London

    2020/00860/LBC Submitted 30 Mar 2020 50 yards away

    Proposed works to 1856 Chief Engineer's Office (Grade II Listed) and 1927 Former Research Laboratory (Grade II Listed) located within Phases C1 and C2 of planning permission 2018/02100/COMB granted 8 February 2019. Works would comprise Soft Strip works to allow the constructional detailing and condition of the building fabric that is currently concealed, to be confirmed by the removal of modern insertions and finishes and/or older finishes to allow the underlying fabric to be exposed. The Soft Strip will improve the understanding of the Listed Buildings and as such will inform the design proposals, including their original proportions and layouts, the functionality of the buildings andovercome practical problems such as identifying service routes to minimise the impact on the historic fabric.

    Awaiting decision Heritage and listed buildings 11 docs

In Hammersmith and Fulham

  • 30 Davisville Road, London, W12 9SJ

    Non-material amendment to planning permission reference: 2018/03932/FUL dated 28 May 2019 for the Erection of a rear roof extension; erection of rear extensions at ground, first and second floor level; excavation of the front and rear garden to form lightwells in connection with the enlargement of the existing basement; installation of 1no rooflight in the front roofslope; conversion of the existing building into 1 x 3 bedroom and 2 x 2 bedroom self-contained flats. Amendments sought to the repositioning and increased number of kitchen rooflights, and internal alterations to the basement, ground and top floor.

    Received 26 Aug, published by the council 11 Sep 2026 Amendments
  • P/2026/02553/NMAT Awaiting decision

    M&S White City Site 54 Wood Lane London W12 7RQ

    Non-material amendment to vary Condition 2 (Drawings) of planning permission ref. 2024/02570/FUL granted on 1 April 2026 for: Erection of a 30-storey building (plus plant) with single storey basement for residential (C3) use with ancillary uses at the ground floor level and including associated landscaping, access, car and cycle parking and other engineering works. The amendments relate to changes to: reconfiguration of the ground floor and basement layouts; an increase to the GEA of ancillary residential (non-residential) floorspace at ground level (7sqm) and basement level (61sqm); landscape amendments including an enlarged water feature and larger terraces; minor adjustments to the access and servicing strategy; and ground floor façade and fenestration amendments.

    Received 6 Oct, published by the council 9 Oct 2026 Amendments
  • P/2026/02544/NMAT Awaiting decision

    260 - 262 North End Road, London, SW6 1NJ

    Non-material amendment to planning permission ref: 2022/03651/FUL granted 11th June 2025 for the 'Demolition of existing buildings at 260-262 North End Road; erection of a replacement part one, part three, part four storey, part five storey building comprising of one retail unit (Class E(a)), 394sqm office floorspace (Class E(g)) and 9 self-contained residential units (Class C3)' to allow amendments to the approved drawings to include: alterations to the main residential stair core to accommodate an evacuation lift, reconfiguration of access to the flats to enable the installation of a single smoke ventilated corridor at each floor level, increasing the size of the plantroom, re-configuration of the ground floor, re-configuration of Flat 5, increasing the size of the studio flats and external walls have been set out to brick dimensions.

    Received 2 Oct, published by the council 9 Oct 2026 Amendments
  • 4 Goldhawk Mews, London, W12 8PA

    Removal of conditions 2, 3 and 4 (parking permits) of planning application ref: 2014/05430/PD56 granted 7th January 2015 for the 'Change of use of the property from office (Class B1) into a single family dwellinghouse (Class C3)'.

    Received 17 Jul, published by the council 15 Aug 2026 Amendments
  • P/2026/02497/VAR Awaiting decision

    4 Southerton Road, London, W6 0PH

    Removal of condition 11 of planning permission ref: 1988/01014/FUL granted 1st August 1988 for the 'Erection of a replacement rear extension at first floor level and conversion to use as two cluster flats each providing three bedsitting rooms with communal facilities'.

    Received 28 Sep, published by the council 6 Oct 2026 Amendments