Skip to content
PlanIndex Get alerts
Menu

Planning application

Proposed Sizewell C Sizewell Power Station Road Sizewell Leiston Suffolk

Granted East Suffolk DC/24/3132/DRR28 Discharge of Requirements (28 days)

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Bespoke Mitigation Plan (Noise and Vibration) for the Land East of Eastlands Industrial Estate (LEEIE) works, secured by the Noise and Management Plan under Requirement 2 (Code of Construction Practice) of the Sizewell C Development Consent Order

As published by the council, reference DC/24/3132/DRR28

Application record

Reference
DC/24/3132/DRR28
Type
Discharge of Requirements (28 days)
Status
Permitted
Decision
Application Permitted
Received
2 Sep 2024
Validated
3 Sep 2024
Decided
26 Sep 2024
Ward
Aldeburgh And Leiston
Parish
Leiston Cum Sizewell
Decision by
Delegated Decision

Site history

Applications at this address on the East Suffolk register

This site has had 13 applications since 2024: 10 approved, 0 refused.

  • Proposed Sizewell C Sizewell Power Station Road Sizewell Leiston Suffolk

    Discharge of Requirements (42 days) - Discharge of Requirement 9 (Main development site: Site clearance) of the Sizewell C Development Consent Order

    Decided 17 Aug 2026 Conditions
  • DC/26/2576/DRR Awaiting decision

    Proposed Sizewell C Sizewell Power Station Road Sizewell Leiston Suffolk

    Discharge of Requirement 19 (Main development site: Marine infrastructure) - Temporary Hard Coastal Defence Feature (part of Work No. 1A(n)) of the Sizewell C Development Consent Order

    Submitted 20 Jul 2026 Conditions
  • DC/26/1777/DRR28 Awaiting decision

    Proposed Sizewell C Sizewell Power Station Road Sizewell Leiston Suffolk

    Bespoke Mitigation Plan (Noise and Vibration) Temporary Construction Area (MDS BMP 7), secured by the Noise Monitoring and Management Plan under Requirement 2 (Code of Construction Practice) of the Sizewell C Development Consent Order

    Submitted 13 May 2026 Conditions
  • DC/26/0327/CON Granted

    Proposed Sizewell C Sizewell Power Station Road Sizewell Leiston Suffolk

    Consultation - Nearshore Infrastrcuture Pre-Installation Bathymetry

    Submitted 27 Jan 2026 Outline
  • DC/26/0158/CON Granted

    Proposed Sizewell C Sizewell Power Station Road Sizewell Leiston Suffolk

    MMO Consultation - Deemed Marine Licence condition 14(3) - Sizewell C CPMMP Notification: TMBIF Pre-installation Topography Monitoring Report

    Decided 10 Feb 2026 Outline
  • DC/25/4721/DRR42 Awaiting decision

    Proposed Sizewell C Sizewell Power Station Road Sizewell Leiston Suffolk

    Discharge of Requirement 31 (Rail infrastructure) - Green Rail Route of the Sizewell C Development Consent Order

    Submitted 4 Dec 2025 Conditions
  • DC/25/4674/CON Granted

    Proposed Sizewell C Sizewell Power Station Road Sizewell Leiston Suffolk

    Consultation - Condition Coastal Processes Monitoring and Mitigation Plan monitoring reports - DML condition 14(3)

    Decided 17 Dec 2025 Outline
  • DC/25/4388/DRR Granted

    Proposed Sizewell C Sizewell Power Station Road Sizewell Leiston Suffolk

    Requirement 21 (Main Development Site: Sizewell Marshes SSSI Method Statement) of the Sizewell C Development Consent Order

    Decided 22 Dec 2025 Conditions
  • DC/25/4283/CCC Granted

    Proposed Sizewell C Sizewell Power Station Road Sizewell Leiston Suffolk

    County Council Consultation - Discharge of Requirement 10 project wide: Public Rights Of Way implementation plan for coast path (MBIF) in respect of SZC Co. Sizewell C Nuclear Power Station

    Decided 18 Nov 2025 Outline
  • Proposed Sizewell C Sizewell Power Station Road Sizewell Leiston Suffolk

    Bespoke Mitigation Plan (Noise and Vibration) - Sizewell Link Road Main Works (AD BMP 16), secured by the Noise Monitoring and Management Plan under Requirement 2 (Code of Construction Practice) of the Sizewell C Development Consent Order

    Decided 7 Aug 2025 Conditions

Timeline

Dates from the published record

  1. 2 Sep 2024

    Received by East Suffolk

  2. 3 Sep 2024

    Validated

    Checked as complete and ready for consideration.

  3. 26 Sep 2024

    Decision issued: Application Permitted

  4. 15 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

4 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What this grant of permission means

East Suffolk granted permission on 26 September 2024, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About condition discharge and variation applications

This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.

Nearby applications

Within 500 metres

  • Land East Of Sizewell Halt King Georges Avenue Leiston Suffolk

    DC/25/4432/FUL Submitted 17 Nov 2025 267m away

    92% historically approved · decision due ~13 Jan

    Hybrid planning application comprising: (a) in Full, for a Further Education College and an Apprentice Hub (Use Class F1(a)); and (b) in Outline, with all matters reserved except access, for a Construction Skills Centre and flexible external training space (Use Class F1(a)); together with associated works including access, internal routes, parking, public realm, landscaping, earthworks and other infrastructure.

    Awaiting decision Full applications 156 docs
  • Land East Of Sizewell Halt King Georges Avenue Leiston Suffolk

    DC/26/2515/DRC Submitted 14 Jul 2026 267m away

    99% historically approved · decision due ~8 Sep

    Part Discharge of condition No. 19 of DC/25/4432/FUL - Hybrid planning application comprising: (a) in Full, for a Further Education College and an Apprentice Hub (Use Class F1(a)); and (b) in Outline, with all matters reserved except access, for a Construction Skills Centre and flexible external training space (Use Class F1(a)); together with associated works including access, internal routes, parking, public realm, landscaping, earthworks and other infrastructure - Arboricultural Method Statement and Tree Protection Plan

    Awaiting decision Conditions Trees 9 docs
  • Land East Of Sizewell Halt King Georges Avenue Leiston Suffolk

    DC/26/2514/DRC Submitted 14 Jul 2026 267m away

    99% historically approved · decision due ~9 Sep

    Part Discharge of Condition Nos.10 and 11 of DC/25/4432/FUL - Hybrid planning application comprising: (a) in Full, for a Further Education College and an Apprentice Hub (Use Class F1(a)); and (b) in Outline, with all matters reserved except access, for a Construction Skills Centre and flexible external training space (Use Class F1(a)); together with associated works including access, internal routes, parking, public realm, landscaping, earthworks and other infrastructure - 10. Habitat Management and Monitoring Plan - 11. Biodiversity Gain Plan

    Awaiting decision Conditions 7 docs
  • Land East Of Sizewell Halt King Georges Avenue Leiston Suffolk

    DC/26/2524/DRC Submitted 14 Jul 2026 267m away

    99% historically approved · decision due ~8 Sep

    Part Discharge of condition No. 42 of DC/25/4432/FUL - Hybrid planning application comprising: (a) in Full, for a Further Education College and an Apprentice Hub (Use Class F1(a)); and (b) in Outline, with all matters reserved except access, for a Construction Skills Centre and flexible external training space (Use Class F1(a)); together with associated works including access, internal routes, parking, public realm, landscaping, earthworks and other infrastructure - Construction Management Strategy

    Awaiting decision Conditions 7 docs
  • Land East Of Sizewell Halt King Georges Avenue Leiston Suffolk

    DC/26/2516/DRC Submitted 14 Jul 2026 267m away

    99% historically approved · decision due ~8 Sep

    Part Discharge of Condition No. 21 of DC/25/4432/FUL - Hybrid planning application comprising: (a) in Full, for a Further Education College and an Apprentice Hub (Use Class F1(a)); and (b) in Outline, with all matters reserved except access, for a Construction Skills Centre and flexible external training space (Use Class F1(a)); together with associated works including access, internal routes, parking, public realm, landscaping, earthworks and other infrastructure - Construction Surface Water Management Plan

    Awaiting decision Conditions 10 docs
  • Land East Of Sizewell Halt King Georges Avenue Leiston Suffolk

    DC/25/3194/EIA Submitted 15 Aug 2025 273m away

    EIA Screening Opinion - In relation to the proposed development comprising a Further Education (FE) College, Apprentice Hub and Construction Skills Centre, plus associated works, including car and cycle parking, on-site bus stop facilities, landscaping and drainage at the land south of King George's Avenue, Leiston.

    Decided Outline 7 docs

In East Suffolk

  • DC/26/2035/DRC Split decision

    The Old Rectory The Street South Elmham St Margaret Harleston Suffolk IP20 0PJ

    Discharge of Condition Nos. 4, 5, 6, 7, 10, 11, 12, 13, 14, 16, 17, 18, 19, 20, 21, 22, 23, 24, 27, 28 and 30 of DC/24/4379/LBC - Listed Building Consent - Partial Demolition, extension and internal reordering, plus conversion and repair of outbuildings - Supporting Statement and Drawings submitted

    2 Jun 2026 Conditions
  • DC/26/2017/DRC Granted

    Hand Car Wash Montrose Service Garage London Road Beccles Suffolk NR34 9YU

    Discharge of Condition No. 3 of DC/25/3495/FUL - Erection of a two-storey, 66-bed care home for the elderly with associated access, parking, landscaping, and ancillary buildings, following the demolition of existing garages and associated structures - Fuel Tank and Canopy Removal

    1 Jun 2026 Conditions
  • DC/26/3060/DRC Awaiting decision

    25 Cotmer Road Lowestoft Suffolk NR33 9PN

    Discharge of Condition No. 14 of DC/24/1151/FUL - Sub division of gardens to create 2 plots and construction of 2 detached bungalows with integral garages - Water Calculations

    28 Aug 2026 Conditions
  • DC/26/2904/DRC Granted

    North Suffolk Skills Academy Harrisons Lane Halesworth Suffolk IP19 8PY

    Discharge of Condition No. 3 of DC/21/0007/FUL - Change of use to sports facilities comprising new grass football pitch adjacent to Harrisons Lane and construction of a new artificial football pitch with associated parking, access, lighting, acoustic fencing and drainage adjacent to the Apollo Youth Centre and adjacent field to the south - Demolition and Construction Management Strategy

    14 Aug 2026 Conditions
  • DC/26/3028/DRR42 Awaiting decision

    Sizewell C And Associated Development Sites Sizewell Leiston Suffolk

    Development Consent Order Requirement 9 - Main Development Site: Site Clearance of the Sizewell C Development Consent Order

    26 Aug 2026 Conditions