Planning application

Proposed Sizewell C Sizewell Power Station Road Sizewell Leiston Suffolk

Awaiting decision East Suffolk DC/26/1777/DRR28 Discharge of Requirements (28 days)

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Bespoke Mitigation Plan (Noise and Vibration) Temporary Construction Area (MDS BMP 7), secured by the Noise Monitoring and Management Plan under Requirement 2 (Code of Construction Practice) of the Sizewell C Development Consent Order

As published by the council, reference DC/26/1777/DRR28

Application record

Reference
DC/26/1777/DRR28
Type
Discharge of Requirements (28 days)
Status
Awaiting decision
Received
13 May 2026
Validated
13 May 2026
Ward
Aldeburgh And Leiston
Parish
Leiston Cum Sizewell

Site history

Applications at this address on the East Suffolk register

This site has had 13 applications since 2024: 10 approved, 0 refused.

  • Proposed Sizewell C Sizewell Power Station Road Sizewell Leiston Suffolk

    Discharge of Requirements (42 days) - Discharge of Requirement 9 (Main development site: Site clearance) of the Sizewell C Development Consent Order

    Decided 17 Aug 2026 Conditions
  • DC/26/2576/DRR Awaiting decision

    Proposed Sizewell C Sizewell Power Station Road Sizewell Leiston Suffolk

    Discharge of Requirement 19 (Main development site: Marine infrastructure) - Temporary Hard Coastal Defence Feature (part of Work No. 1A(n)) of the Sizewell C Development Consent Order

    Submitted 20 Jul 2026 Conditions
  • DC/26/0327/CON Granted

    Proposed Sizewell C Sizewell Power Station Road Sizewell Leiston Suffolk

    Consultation - Nearshore Infrastrcuture Pre-Installation Bathymetry

    Submitted 27 Jan 2026 Outline
  • DC/26/0158/CON Granted

    Proposed Sizewell C Sizewell Power Station Road Sizewell Leiston Suffolk

    MMO Consultation - Deemed Marine Licence condition 14(3) - Sizewell C CPMMP Notification: TMBIF Pre-installation Topography Monitoring Report

    Decided 10 Feb 2026 Outline
  • DC/25/4721/DRR42 Awaiting decision

    Proposed Sizewell C Sizewell Power Station Road Sizewell Leiston Suffolk

    Discharge of Requirement 31 (Rail infrastructure) - Green Rail Route of the Sizewell C Development Consent Order

    Submitted 4 Dec 2025 Conditions
  • DC/25/4674/CON Granted

    Proposed Sizewell C Sizewell Power Station Road Sizewell Leiston Suffolk

    Consultation - Condition Coastal Processes Monitoring and Mitigation Plan monitoring reports - DML condition 14(3)

    Decided 17 Dec 2025 Outline
  • DC/25/4388/DRR Granted

    Proposed Sizewell C Sizewell Power Station Road Sizewell Leiston Suffolk

    Requirement 21 (Main Development Site: Sizewell Marshes SSSI Method Statement) of the Sizewell C Development Consent Order

    Decided 22 Dec 2025 Conditions
  • DC/25/4283/CCC Granted

    Proposed Sizewell C Sizewell Power Station Road Sizewell Leiston Suffolk

    County Council Consultation - Discharge of Requirement 10 project wide: Public Rights Of Way implementation plan for coast path (MBIF) in respect of SZC Co. Sizewell C Nuclear Power Station

    Decided 18 Nov 2025 Outline
  • Proposed Sizewell C Sizewell Power Station Road Sizewell Leiston Suffolk

    Bespoke Mitigation Plan (Noise and Vibration) - Sizewell Link Road Main Works (AD BMP 16), secured by the Noise Monitoring and Management Plan under Requirement 2 (Code of Construction Practice) of the Sizewell C Development Consent Order

    Decided 7 Aug 2025 Conditions
  • DC/25/2407/DRR Granted

    Proposed Sizewell C Sizewell Power Station Road Sizewell Leiston Suffolk

    Development Consent Order Requirement 21 - Main development site: Sizewell Marshes SSSI Method Statements (Partial Discharge, Methodology for SSSI Southern Abutment) of the Sizewell C Development Consent Order

    Decided 7 Jul 2025 Conditions

Timeline

Dates from the published record

  1. 13 May 2026

    Received by East Suffolk

  2. 24 Jul 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 8 July 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    East Suffolk took a median of 54 days over the applications it decided in the last year.

Documents

Plans, drawings, consultee responses and the officer's report

2 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What happens while it is decided

This application is with East Suffolk for determination, against a statutory target of eight weeks. Over the last year East Suffolk decided condition discharge and variation applications in a median of 51 days. More in our guide to how long planning decisions take.

About condition discharge and variation applications

This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.

In East Suffolk

  • DC/26/2035/DRC Split decision

    The Old Rectory The Street South Elmham St Margaret Harleston Suffolk IP20 0PJ

    Discharge of Condition Nos. 4, 5, 6, 7, 10, 11, 12, 13, 14, 16, 17, 18, 19, 20, 21, 22, 23, 24, 27, 28 and 30 of DC/24/4379/LBC - Listed Building Consent - Partial Demolition, extension and internal reordering, plus conversion and repair of outbuildings - Supporting Statement and Drawings submitted

    2 Jun 2026 Conditions
  • DC/26/2017/DRC Granted

    Hand Car Wash Montrose Service Garage London Road Beccles Suffolk NR34 9YU

    Discharge of Condition No. 3 of DC/25/3495/FUL - Erection of a two-storey, 66-bed care home for the elderly with associated access, parking, landscaping, and ancillary buildings, following the demolition of existing garages and associated structures - Fuel Tank and Canopy Removal

    1 Jun 2026 Conditions
  • DC/26/3060/DRC Awaiting decision

    25 Cotmer Road Lowestoft Suffolk NR33 9PN

    Discharge of Condition No. 14 of DC/24/1151/FUL - Sub division of gardens to create 2 plots and construction of 2 detached bungalows with integral garages - Water Calculations

    28 Aug 2026 Conditions
  • DC/26/2904/DRC Granted

    North Suffolk Skills Academy Harrisons Lane Halesworth Suffolk IP19 8PY

    Discharge of Condition No. 3 of DC/21/0007/FUL - Change of use to sports facilities comprising new grass football pitch adjacent to Harrisons Lane and construction of a new artificial football pitch with associated parking, access, lighting, acoustic fencing and drainage adjacent to the Apollo Youth Centre and adjacent field to the south - Demolition and Construction Management Strategy

    14 Aug 2026 Conditions
  • DC/26/3028/DRR42 Awaiting decision

    Sizewell C And Associated Development Sites Sizewell Leiston Suffolk

    Development Consent Order Requirement 9 - Main Development Site: Site Clearance of the Sizewell C Development Consent Order

    26 Aug 2026 Conditions