Planning application

Proposed Sizewell C Sizewell Power Station Road Sizewell Leiston Suffolk

Awaiting decision East Suffolk DC/26/2576/DRR Discharge of Requirements (56 days)

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Discharge of Requirement 19 (Main development site: Marine infrastructure) - Temporary Hard Coastal Defence Feature (part of Work No. 1A(n)) of the Sizewell C Development Consent Order

As published by the council, reference DC/26/2576/DRR

Application record

Reference
DC/26/2576/DRR
Type
Discharge of Requirements (56 days)
Status
Awaiting decision
Received
20 Jul 2026
Validated
20 Jul 2026
Ward
Aldeburgh And Leiston
Parish
Leiston Cum Sizewell

Site history

Applications at this address on the East Suffolk register

This site has had 13 applications since 2024: 10 approved, 0 refused.

  • Proposed Sizewell C Sizewell Power Station Road Sizewell Leiston Suffolk

    Discharge of Requirements (42 days) - Discharge of Requirement 9 (Main development site: Site clearance) of the Sizewell C Development Consent Order

    Decided 17 Aug 2026 Conditions
  • DC/26/1777/DRR28 Awaiting decision

    Proposed Sizewell C Sizewell Power Station Road Sizewell Leiston Suffolk

    Bespoke Mitigation Plan (Noise and Vibration) Temporary Construction Area (MDS BMP 7), secured by the Noise Monitoring and Management Plan under Requirement 2 (Code of Construction Practice) of the Sizewell C Development Consent Order

    Submitted 13 May 2026 Conditions
  • DC/26/0327/CON Granted

    Proposed Sizewell C Sizewell Power Station Road Sizewell Leiston Suffolk

    Consultation - Nearshore Infrastrcuture Pre-Installation Bathymetry

    Submitted 27 Jan 2026 Outline
  • DC/26/0158/CON Granted

    Proposed Sizewell C Sizewell Power Station Road Sizewell Leiston Suffolk

    MMO Consultation - Deemed Marine Licence condition 14(3) - Sizewell C CPMMP Notification: TMBIF Pre-installation Topography Monitoring Report

    Decided 10 Feb 2026 Outline
  • DC/25/4721/DRR42 Awaiting decision

    Proposed Sizewell C Sizewell Power Station Road Sizewell Leiston Suffolk

    Discharge of Requirement 31 (Rail infrastructure) - Green Rail Route of the Sizewell C Development Consent Order

    Submitted 4 Dec 2025 Conditions
  • DC/25/4674/CON Granted

    Proposed Sizewell C Sizewell Power Station Road Sizewell Leiston Suffolk

    Consultation - Condition Coastal Processes Monitoring and Mitigation Plan monitoring reports - DML condition 14(3)

    Decided 17 Dec 2025 Outline
  • DC/25/4388/DRR Granted

    Proposed Sizewell C Sizewell Power Station Road Sizewell Leiston Suffolk

    Requirement 21 (Main Development Site: Sizewell Marshes SSSI Method Statement) of the Sizewell C Development Consent Order

    Decided 22 Dec 2025 Conditions
  • DC/25/4283/CCC Granted

    Proposed Sizewell C Sizewell Power Station Road Sizewell Leiston Suffolk

    County Council Consultation - Discharge of Requirement 10 project wide: Public Rights Of Way implementation plan for coast path (MBIF) in respect of SZC Co. Sizewell C Nuclear Power Station

    Decided 18 Nov 2025 Outline
  • Proposed Sizewell C Sizewell Power Station Road Sizewell Leiston Suffolk

    Bespoke Mitigation Plan (Noise and Vibration) - Sizewell Link Road Main Works (AD BMP 16), secured by the Noise Monitoring and Management Plan under Requirement 2 (Code of Construction Practice) of the Sizewell C Development Consent Order

    Decided 7 Aug 2025 Conditions
  • DC/25/2407/DRR Granted

    Proposed Sizewell C Sizewell Power Station Road Sizewell Leiston Suffolk

    Development Consent Order Requirement 21 - Main development site: Sizewell Marshes SSSI Method Statements (Partial Discharge, Methodology for SSSI Southern Abutment) of the Sizewell C Development Consent Order

    Decided 7 Jul 2025 Conditions

Timeline

Dates from the published record

  1. 20 Jul 2026

    Received by East Suffolk

  2. 27 Jul 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 14 September 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    East Suffolk took a median of 53 days over the applications it decided in the last year.

Documents

Plans, drawings, consultee responses and the officer's report

15 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What happens while it is decided

This application is with East Suffolk for determination, against a statutory target of eight weeks. Over the last year East Suffolk decided condition discharge and variation applications in a median of 51 days. More in our guide to how long planning decisions take.

About condition discharge and variation applications

This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.

Nearby applications

Within 500 metres

  • Sizewell B Sizewell Power Station Complex And Adjoining Land Sizewell Power Station Road Sizewell Leiston Suffolk IP16 4UR

    DC/24/1221/DRC Submitted 2 Apr 2024 469m away

    Discharge of Condition No. 5 of DC/20/4646/FUL - Hybrid application seeking outline planning permission, with all matters reserved, for up to 9,500 square metres Gross External Area (GEA) to provide administration, storage, welfare and canteen facilities and a visitor centre of up to 1,000 square metres GEA. Detailed planning permission is sought for demolition of some existing structures and redevelopment to include a training centre and interim visitor centre, an outage store, lay down area, car and cycle parking, landscaping, associated infrastructure (including utilities, plant and highway works), tree felling and other relevant works - details of Visitor Centre building

    Granted Conditions Demolition Trees 13 docs
  • Sizewell B Sizewell Power Station Complex And Adjoining Land Sizewell Power Station Road Sizewell Leiston Suffolk IP16 4UR

    DC/24/1222/ARM Submitted 2 Apr 2024 469m away

    Approved of Reserved Matters (Layout, Appearance, and Scale) relating to Condition 2 of DC/20/4646/FUL - Hybrid application seeking outline planning permission, with all matters reserved, for up to 9,500 square metres Gross External Area (GEA) to provide administration, storage, welfare and canteen facilities and a visitor centre of up to 1,000 square metres GEA. Detailed planning permission is sought for demolition of some existing structures and redevelopment to include a training centre and interim visitor centre, an outage store, lay down area, car and cycle parking, landscaping, associated infrastructure (including utilities, plant and highway works), tree felling and other relevant works - proposed visitor centre

    Granted Reserved matters Demolition Trees 44 docs
  • Sizewell B Sizewell Power Station Complex And Adjoining Land Sizewell Power Station Road Sizewell Leiston Suffolk IP16 4UR

    DC/24/3658/DRC Submitted 11 Oct 2024 469m away

    Discharge of Condition No. 6 of DC/20/4646/FUL - Hybrid application seeking outline planning permission, with all matters reserved, for up to 9,500 square metres Gross External Area (GEA) to provide administration, storage, welfare and canteen facilities and a visitor centre of up to 1,000 square metres GEA. Detailed planning permission is sought for demolition of some existing structures and redevelopment to include a training centre and interim visitor centre, an outage store, lay down area, car and cycle parking, landscaping, associated infrastructure (including utilities, plant and highway works), tree felling and other relevant works - Detailed Lighting Plan

    Granted Conditions Demolition Trees 4 docs

In East Suffolk

  • DC/26/1893/DRC Granted

    The Workshop Brick Kiln Lane Melton Woodbridge Suffolk IP12 2PB

    Discharge of conditions 7 and 10 of DC/23/2365/FUL - Demolition of existing workshop buildings, erection of replacement workshop, authorisation of existing workshop extensions, associated works. - Condition 7 - Construction Management Plan; Condition 10 - Noise Management Plan

    21 May 2026 Conditions
  • DC/26/2573/DRC Granted

    North Suffolk Skills Academy Harrisons Lane Halesworth Suffolk IP19 8PY

    Discharge of condition Nos. 14, 19 & 26 of DC/21/0007/FUL - Change of use to sports facilities comprising new grass football pitch adjacent to Harrisons Lane and construction of a new artificial football pitch with associated parking, access, lighting, acoustic fencing and drainage adjacent to the Apollo Youth Centre and adjacent field to the south. - 14 - Construction Mngt Plan, 19 - Construction and Phasing Plan and 26 - Surface Water

    20 Jul 2026 Conditions
  • DC/26/2736/DRC Granted

    Land Adj School Road Church Road Ringsfield Suffolk

    Discharge of Condition No. 10 of DC/25/3030/VOC - Variation of Condition No. 2 of DC/17/2934/VOC - Construction of 10 No.Holiday Lodges, 1 No. retail unit and 1 No. self contained flat. This application is seeking modification to the appearance and layout of the originally approved lodges - discharge of surface water

    3 Aug 2026 Conditions
  • DC/26/3165/DRC Awaiting decision

    Timber Mill Barns Sizewell Hall Road Leiston Suffolk IP16 4TT

    Discharge of Condition Nos. 18, 21 and 23 of DC/25/1355/FUL - Alterations to the existing structure & external envelope as part of the formation of two residential dwellings from agricultural barn - 18. Construction Method Statement 21. Emergency Demolition/Construction Manangement Plan 23. Radiation Emergency Contingency Plan.

    8 Sep 2026 Conditions
  • DC/26/3167/DRC Awaiting decision

    St Michaels Church Church Street Framlingham Suffolk IP13 9BQ

    Discharge of Condition No. 3 of DC/26/1993/FUL - Rebuilding of a brick bounday wall - Archaeological Monitoring

    8 Sep 2026 Conditions