Planning application
Land East Of Sizewell Halt King Georges Avenue Leiston Suffolk
Decided. The decision notice on the council portal carries the outcome in full, including any conditions.
Proposal
EIA Screening Opinion - In relation to the proposed development comprising a Further Education (FE) College, Apprentice Hub and Construction Skills Centre, plus associated works, including car and cycle parking, on-site bus stop facilities, landscaping and drainage at the land south of King George's Avenue, Leiston.
As published by the council, reference DC/25/3194/EIA
Application record
- Reference
- DC/25/3194/EIA
- Type
- EIA Screening Opinion
- Status
- Permitted
- Decision
- EIA Not Required
- Received
- 15 Aug 2025
- Validated
- 15 Aug 2025
- Decided
- 16 Sep 2025
- Ward
- Aldeburgh And Leiston
- Parish
- Leiston Cum Sizewell
- Decision by
- Delegated Decision
Site history
Applications at this address on the East Suffolk register
This site has had 6 applications since 2025.
-
DC/26/2515/DRC Awaiting decision
Land East Of Sizewell Halt King Georges Avenue Leiston Suffolk
Part Discharge of condition No. 19 of DC/25/4432/FUL - Hybrid planning application comprising: (a) in Full, for a Further Education College and an Apprentice Hub (Use Class F1(a)); and (b) in Outline, with all matters reserved except access, for a Construction Skills Centre and flexible external training space (Use Class F1(a)); together with associated works including access, internal routes, parking, public realm, landscaping, earthworks and other infrastructure - Arboricultural Method Statement and Tree Protection Plan
-
DC/26/2514/DRC Awaiting decision
Land East Of Sizewell Halt King Georges Avenue Leiston Suffolk
Part Discharge of Condition Nos.10 and 11 of DC/25/4432/FUL - Hybrid planning application comprising: (a) in Full, for a Further Education College and an Apprentice Hub (Use Class F1(a)); and (b) in Outline, with all matters reserved except access, for a Construction Skills Centre and flexible external training space (Use Class F1(a)); together with associated works including access, internal routes, parking, public realm, landscaping, earthworks and other infrastructure - 10. Habitat Management and Monitoring Plan - 11. Biodiversity Gain Plan
-
DC/26/2524/DRC Awaiting decision
Land East Of Sizewell Halt King Georges Avenue Leiston Suffolk
Part Discharge of condition No. 42 of DC/25/4432/FUL - Hybrid planning application comprising: (a) in Full, for a Further Education College and an Apprentice Hub (Use Class F1(a)); and (b) in Outline, with all matters reserved except access, for a Construction Skills Centre and flexible external training space (Use Class F1(a)); together with associated works including access, internal routes, parking, public realm, landscaping, earthworks and other infrastructure - Construction Management Strategy
-
DC/26/2516/DRC Awaiting decision
Land East Of Sizewell Halt King Georges Avenue Leiston Suffolk
Part Discharge of Condition No. 21 of DC/25/4432/FUL - Hybrid planning application comprising: (a) in Full, for a Further Education College and an Apprentice Hub (Use Class F1(a)); and (b) in Outline, with all matters reserved except access, for a Construction Skills Centre and flexible external training space (Use Class F1(a)); together with associated works including access, internal routes, parking, public realm, landscaping, earthworks and other infrastructure - Construction Surface Water Management Plan
-
DC/25/4432/FUL Awaiting decision
Land East Of Sizewell Halt King Georges Avenue Leiston Suffolk
Hybrid planning application comprising: (a) in Full, for a Further Education College and an Apprentice Hub (Use Class F1(a)); and (b) in Outline, with all matters reserved except access, for a Construction Skills Centre and flexible external training space (Use Class F1(a)); together with associated works including access, internal routes, parking, public realm, landscaping, earthworks and other infrastructure.
Timeline
Dates from the published record
-
15 Aug 2025
Received by East Suffolk
-
16 Sep 2025
Decision issued: EIA Not Required
-
9 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
7 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsAfter the decision
East Suffolk has decided this application; the outcome above is the register's own wording and the decision notice on the council portal carries the detail. More in our guide to what happens after a planning decision.
About outline applications
An outline application tests the principle of developing a site, holding back details such as appearance and landscaping as reserved matters for later approval. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
Land East Of Sizewell Halt King Georges Avenue Leiston Suffolk
92% historically approved · decision due ~13 Jan
Hybrid planning application comprising: (a) in Full, for a Further Education College and an Apprentice Hub (Use Class F1(a)); and (b) in Outline, with all matters reserved except access, for a Construction Skills Centre and flexible external training space (Use Class F1(a)); together with associated works including access, internal routes, parking, public realm, landscaping, earthworks and other infrastructure.
Awaiting decision Full applications 156 docs -
Land East Of Sizewell Halt King Georges Avenue Leiston Suffolk
99% historically approved · decision due ~8 Sep
Part Discharge of condition No. 19 of DC/25/4432/FUL - Hybrid planning application comprising: (a) in Full, for a Further Education College and an Apprentice Hub (Use Class F1(a)); and (b) in Outline, with all matters reserved except access, for a Construction Skills Centre and flexible external training space (Use Class F1(a)); together with associated works including access, internal routes, parking, public realm, landscaping, earthworks and other infrastructure - Arboricultural Method Statement and Tree Protection Plan
Awaiting decision Conditions Trees 9 docs -
Land East Of Sizewell Halt King Georges Avenue Leiston Suffolk
99% historically approved · decision due ~9 Sep
Part Discharge of Condition Nos.10 and 11 of DC/25/4432/FUL - Hybrid planning application comprising: (a) in Full, for a Further Education College and an Apprentice Hub (Use Class F1(a)); and (b) in Outline, with all matters reserved except access, for a Construction Skills Centre and flexible external training space (Use Class F1(a)); together with associated works including access, internal routes, parking, public realm, landscaping, earthworks and other infrastructure - 10. Habitat Management and Monitoring Plan - 11. Biodiversity Gain Plan
Awaiting decision Conditions 7 docs -
Land East Of Sizewell Halt King Georges Avenue Leiston Suffolk
99% historically approved · decision due ~8 Sep
Part Discharge of condition No. 42 of DC/25/4432/FUL - Hybrid planning application comprising: (a) in Full, for a Further Education College and an Apprentice Hub (Use Class F1(a)); and (b) in Outline, with all matters reserved except access, for a Construction Skills Centre and flexible external training space (Use Class F1(a)); together with associated works including access, internal routes, parking, public realm, landscaping, earthworks and other infrastructure - Construction Management Strategy
Awaiting decision Conditions 7 docs -
Land East Of Sizewell Halt King Georges Avenue Leiston Suffolk
99% historically approved · decision due ~8 Sep
Part Discharge of Condition No. 21 of DC/25/4432/FUL - Hybrid planning application comprising: (a) in Full, for a Further Education College and an Apprentice Hub (Use Class F1(a)); and (b) in Outline, with all matters reserved except access, for a Construction Skills Centre and flexible external training space (Use Class F1(a)); together with associated works including access, internal routes, parking, public realm, landscaping, earthworks and other infrastructure - Construction Surface Water Management Plan
Awaiting decision Conditions 10 docs -
Proposed Sizewell C Sizewell Power Station Road Sizewell Leiston Suffolk
Bespoke Mitigation Plan (Noise and Vibration) for the Land East of Eastlands Industrial Estate (LEEIE) works, secured by the Noise and Management Plan under Requirement 2 (Code of Construction Practice) of the Sizewell C Development Consent Order
Granted Conditions 4 docs
Other outline applications
In East Suffolk
-
DC/26/2769/EIA Decided
Land Off Ringsfield Road Beccles Suffolk
EIA Screening Opinion - Residential development of up to 270 dwellings, together with public open space, suitable alternative natural greenspace (SANG) and associated infrastructure.
-
DC/26/2834/CON Granted
Land To South Of Railway Line Westerfield Road Ipswich Suffolk
Consultation - Part discharge of condition 28 of outline planning permission IP/14/00638/OUTFL in relation to the Community Development Strategy and the full details of projects and measures for the pre-occupancy and early occupancy phase.
-
DC/26/3025/CON Awaiting decision
The Crown Hotel Market Hill Framlingham Woodbridge Suffolk IP13 9AP
Consultation - Renewal of pavement licence for 4 tables each with 3 chairs at the front of the premises, covering an area of left of the door (when facing premises) 11m in length & 1.5m wide and right of the door 8m in length & 1.5m wide. Between the hours of 07:30-23:00 Monday to Saturday and 8:00 to 18:00 Sunday.
-
DC/26/3031/CON Awaiting decision
79 Hamilton Road Felixstowe Suffolk IP11 7BE
Consultation - Renewal of pavement licence: 6 tables and 12 chairs Area in front of premises - 6m x 3.4m Tables 1 to 4 (located on pavement) - Monday to Sunday 08:00 to 16:00 Tables 5 and 6 (located on Hamilton Road) - Monday to Sunday 10:00 to 16:00
-
DC/26/2758/CON Granted
Garland Park Garland Park Avenue Rendlesham Woodbridge Suffolk
Consultation - Variation to Advanced Water Infrastructure Networks Limited, to allow it to supply Water and Sewerage services to a site called Garland Park, Woodbridge.