Planning application
Land East Of Sizewell Halt King Georges Avenue Leiston Suffolk
Relates to DC/25/4432/FUL
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Part Discharge of Condition No. 21 of DC/25/4432/FUL - Hybrid planning application comprising: (a) in Full, for a Further Education College and an Apprentice Hub (Use Class F1(a)); and (b) in Outline, with all matters reserved except access, for a Construction Skills Centre and flexible external training space (Use Class F1(a)); together with associated works including access, internal routes, parking, public realm, landscaping, earthworks and other infrastructure - Construction Surface Water Management Plan
As published by the council, reference DC/26/2516/DRC
Application record
- Reference
- DC/26/2516/DRC
- Type
- Approval of Details Reserved by Cond.
- Status
- Awaiting decision
- Received
- 14 Jul 2026
- Validated
- 14 Jul 2026
- Ward
- Aldeburgh And Leiston
- Parish
- Leiston Cum Sizewell
Site history
Applications at this address on the East Suffolk register
This site has had 6 applications since 2025.
-
DC/26/2515/DRC Awaiting decision
Land East Of Sizewell Halt King Georges Avenue Leiston Suffolk
Part Discharge of condition No. 19 of DC/25/4432/FUL - Hybrid planning application comprising: (a) in Full, for a Further Education College and an Apprentice Hub (Use Class F1(a)); and (b) in Outline, with all matters reserved except access, for a Construction Skills Centre and flexible external training space (Use Class F1(a)); together with associated works including access, internal routes, parking, public realm, landscaping, earthworks and other infrastructure - Arboricultural Method Statement and Tree Protection Plan
-
DC/26/2514/DRC Awaiting decision
Land East Of Sizewell Halt King Georges Avenue Leiston Suffolk
Part Discharge of Condition Nos.10 and 11 of DC/25/4432/FUL - Hybrid planning application comprising: (a) in Full, for a Further Education College and an Apprentice Hub (Use Class F1(a)); and (b) in Outline, with all matters reserved except access, for a Construction Skills Centre and flexible external training space (Use Class F1(a)); together with associated works including access, internal routes, parking, public realm, landscaping, earthworks and other infrastructure - 10. Habitat Management and Monitoring Plan - 11. Biodiversity Gain Plan
-
DC/26/2524/DRC Awaiting decision
Land East Of Sizewell Halt King Georges Avenue Leiston Suffolk
Part Discharge of condition No. 42 of DC/25/4432/FUL - Hybrid planning application comprising: (a) in Full, for a Further Education College and an Apprentice Hub (Use Class F1(a)); and (b) in Outline, with all matters reserved except access, for a Construction Skills Centre and flexible external training space (Use Class F1(a)); together with associated works including access, internal routes, parking, public realm, landscaping, earthworks and other infrastructure - Construction Management Strategy
-
DC/25/4432/FUL Awaiting decision
Land East Of Sizewell Halt King Georges Avenue Leiston Suffolk
Hybrid planning application comprising: (a) in Full, for a Further Education College and an Apprentice Hub (Use Class F1(a)); and (b) in Outline, with all matters reserved except access, for a Construction Skills Centre and flexible external training space (Use Class F1(a)); together with associated works including access, internal routes, parking, public realm, landscaping, earthworks and other infrastructure.
-
DC/25/3194/EIA Decided
Land East Of Sizewell Halt King Georges Avenue Leiston Suffolk
EIA Screening Opinion - In relation to the proposed development comprising a Further Education (FE) College, Apprentice Hub and Construction Skills Centre, plus associated works, including car and cycle parking, on-site bus stop facilities, landscaping and drainage at the land south of King George's Avenue, Leiston.
Timeline
Dates from the published record
-
14 Jul 2026
Received by East Suffolk
-
27 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 8 September 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
East Suffolk took a median of 53 days over the applications it decided in the last year.
Related applications
Cases linked to this one on the register
-
DC/25/4432/FUL Awaiting decision
Land East Of Sizewell Halt King Georges Avenue Leiston Suffolk
Hybrid planning application comprising: (a) in Full, for a Further Education College and an Apprentice Hub (Use Class F1(a)); and (b) in Outline, with all matters reserved except access, for a Construction Skills Centre and flexible external training space (Use Class F1(a)); together with associated works including access, internal routes, parking, public realm, landscaping, earthworks and other infrastructure.
Documents
Plans, drawings, consultee responses and the officer's report
10 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat happens while it is decided
This application is with East Suffolk for determination, against a statutory target of eight weeks. Over the last year East Suffolk decided condition discharge and variation applications in a median of 51 days. More in our guide to how long planning decisions take.
About condition discharge and variation applications
This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
Land East Of Sizewell Halt King Georges Avenue Leiston Suffolk
93% historically approved · decision due ~13 Jan
Hybrid planning application comprising: (a) in Full, for a Further Education College and an Apprentice Hub (Use Class F1(a)); and (b) in Outline, with all matters reserved except access, for a Construction Skills Centre and flexible external training space (Use Class F1(a)); together with associated works including access, internal routes, parking, public realm, landscaping, earthworks and other infrastructure.
Awaiting decision Full applications 156 docs -
Land East Of Sizewell Halt King Georges Avenue Leiston Suffolk
99% historically approved · decision due ~8 Sep
Part Discharge of condition No. 19 of DC/25/4432/FUL - Hybrid planning application comprising: (a) in Full, for a Further Education College and an Apprentice Hub (Use Class F1(a)); and (b) in Outline, with all matters reserved except access, for a Construction Skills Centre and flexible external training space (Use Class F1(a)); together with associated works including access, internal routes, parking, public realm, landscaping, earthworks and other infrastructure - Arboricultural Method Statement and Tree Protection Plan
Awaiting decision Conditions Trees 9 docs -
Land East Of Sizewell Halt King Georges Avenue Leiston Suffolk
99% historically approved · decision due ~9 Sep
Part Discharge of Condition Nos.10 and 11 of DC/25/4432/FUL - Hybrid planning application comprising: (a) in Full, for a Further Education College and an Apprentice Hub (Use Class F1(a)); and (b) in Outline, with all matters reserved except access, for a Construction Skills Centre and flexible external training space (Use Class F1(a)); together with associated works including access, internal routes, parking, public realm, landscaping, earthworks and other infrastructure - 10. Habitat Management and Monitoring Plan - 11. Biodiversity Gain Plan
Awaiting decision Conditions 7 docs -
Land East Of Sizewell Halt King Georges Avenue Leiston Suffolk
99% historically approved · decision due ~8 Sep
Part Discharge of condition No. 42 of DC/25/4432/FUL - Hybrid planning application comprising: (a) in Full, for a Further Education College and an Apprentice Hub (Use Class F1(a)); and (b) in Outline, with all matters reserved except access, for a Construction Skills Centre and flexible external training space (Use Class F1(a)); together with associated works including access, internal routes, parking, public realm, landscaping, earthworks and other infrastructure - Construction Management Strategy
Awaiting decision Conditions 9 docs -
Land East Of Sizewell Halt King Georges Avenue Leiston Suffolk
EIA Screening Opinion - In relation to the proposed development comprising a Further Education (FE) College, Apprentice Hub and Construction Skills Centre, plus associated works, including car and cycle parking, on-site bus stop facilities, landscaping and drainage at the land south of King George's Avenue, Leiston.
Decided Outline 7 docs -
Proposed Sizewell C Sizewell Power Station Road Sizewell Leiston Suffolk
Bespoke Mitigation Plan (Noise and Vibration) for the Land East of Eastlands Industrial Estate (LEEIE) works, secured by the Noise and Management Plan under Requirement 2 (Code of Construction Practice) of the Sizewell C Development Consent Order
Granted Conditions 4 docs
Other condition discharge and variation applications
In East Suffolk
-
DC/26/1893/DRC Granted
The Workshop Brick Kiln Lane Melton Woodbridge Suffolk IP12 2PB
Discharge of conditions 7 and 10 of DC/23/2365/FUL - Demolition of existing workshop buildings, erection of replacement workshop, authorisation of existing workshop extensions, associated works. - Condition 7 - Construction Management Plan; Condition 10 - Noise Management Plan
-
DC/26/2573/DRC Granted
North Suffolk Skills Academy Harrisons Lane Halesworth Suffolk IP19 8PY
Discharge of condition Nos. 14, 19 & 26 of DC/21/0007/FUL - Change of use to sports facilities comprising new grass football pitch adjacent to Harrisons Lane and construction of a new artificial football pitch with associated parking, access, lighting, acoustic fencing and drainage adjacent to the Apollo Youth Centre and adjacent field to the south. - 14 - Construction Mngt Plan, 19 - Construction and Phasing Plan and 26 - Surface Water
-
DC/26/2736/DRC Granted
Land Adj School Road Church Road Ringsfield Suffolk
Discharge of Condition No. 10 of DC/25/3030/VOC - Variation of Condition No. 2 of DC/17/2934/VOC - Construction of 10 No.Holiday Lodges, 1 No. retail unit and 1 No. self contained flat. This application is seeking modification to the appearance and layout of the originally approved lodges - discharge of surface water
-
DC/26/3165/DRC Awaiting decision
Timber Mill Barns Sizewell Hall Road Leiston Suffolk IP16 4TT
Discharge of Condition Nos. 18, 21 and 23 of DC/25/1355/FUL - Alterations to the existing structure & external envelope as part of the formation of two residential dwellings from agricultural barn - 18. Construction Method Statement 21. Emergency Demolition/Construction Manangement Plan 23. Radiation Emergency Contingency Plan.
-
DC/26/3167/DRC Awaiting decision
St Michaels Church Church Street Framlingham Suffolk IP13 9BQ
Discharge of Condition No. 3 of DC/26/1993/FUL - Rebuilding of a brick bounday wall - Archaeological Monitoring