Council hub · Northern Ireland
Ards and North Down planning applications
Page 2 of 36, newest first. The Ards and North Down hub carries the figures, decision times and common questions.
Applications
Page 2 of 36
-
LA06/2026/0819/DC Awaiting decision
Lands To Rear Of No.38 High Street Donaghadee With Access Adjacent To Nos. 11-13 New Street Donaghadee.
Discharge of Condition No. 5 of LA06/20170959/F No site works of any nature, or development shall take place until a programme of archaeological work has been implemented, in accordance with a written scheme and programme prepared by a qualified archaeologist, submitted by the applicant and approved by the Council. The programme should provide for the identification and evaluation of archaeological remains within the site, for mitigation of the impacts of development, through excavation recording or by preservation of remains, and for preparation of an archaeological report. Reason: to ensure that archaeological remains within the application site are properly identified and protected or appropriately recorded.
-
LA06/2026/0820/O Awaiting decision
Land 20m SW of 2A Cloughey Road Portaferry BT22 1ND
Dwelling and Garage with new access (Renewal of Planning Approval LA06/2023/2282/O)
-
LA06/2026/0815/O Awaiting decision
Lands 30m NE of 21 New Road Carrowdore BT22 2HB
1 no. 1.5-storey infill dwelling, detached garage, driveway and alteration to existing access.
-
LA06/2026/0805/S54 Awaiting decision
Land at Craigantlet Quarry 73 Holywood Road, Newtownards, BT23 4TQ
Erection of a Coated Road Stone Plant and associated ancillary development to include bitumen storage tanks, aggregate storage bays, staff facilities, weighbridge and recycled asphalt pavement (RAP) processing and storage area. Retention of development in non-compliance with Condition 2 of Planning Approval LA06/2022/0689/F To be varied from: The noise level at nearby sensitive receptors due to the operation of the roadstone coating plant, associated traffic movements and the proposed RAP processing operations(daytime) shall not exceed the predicted noise levels (dB LAeq, 1hr) detailed in the table below. The noise sensitive receptor loctaions are as detailed within the Noise Impact Assessment, prepared by AONA Environemntal and dated March 2022. To: The total noise from the operation of the coated road stone development shall not exceed 55dB LAeq,1hr (free field) as measured at any noise sensitive property between the hours of 0700 and 2300 and 42dB(A) LAeq,1hr (free field) between the hours of 2300 and 0700 hours.
-
LA06/2026/0806/F Awaiting decision
Lands at 52-62 Main Street and East of 20 Well Road, Ballywalter, BT22 2PQ
Demolition of existing buildings and erection of 21no. dwellings (14no. houses & 7no. apartments).
-
LA06/2026/0803/F Awaiting decision
Lands at Former Flagship Centre, Main Street, Bangor, BT20 5AU
Refurbishment (including external alterations, new entrance doors and recladding of existing building) and change of use of Flagship shopping centre from (Class A1 (a), (b), (c), (d), (e) retail uses, Class A2 financial and professional use, & sui generis food & beverage) to create ‘Marina Village’ a mixed use entertainment and leisure/recreational led scheme to include the following; • The provision of Class A1 shopping and Class A2 financial & professional services; • food & beverage uses (restaurants, public bar, hot food bars); • indoor family leisure uses; sports & recreation (indoor gym and padel courts); • Class B1(a) Offices; • Class D1 Community Uses – Class D1 (a) medical and healthcare provision, Class D1 (c) community centre; and • Creative start-up innovation units (Class B2 light industrial & Class D1 Community/Cultural Uses (to include D1 (c) community space, D1 (d) education and training & D1 (e) artwork display) and associated display and sale of goods (Class A1 (a) and A1 (e)
-
LA06/2026/0801/F Awaiting decision
Immediately West of 14 Ardavon Glen Road, Holywood, BT18 0FD
Two Storey Detached Dwelling with Landscaping Improvements & associated siteworks
-
LA06/2026/0797/F Awaiting decision
60m North of 92 Bowtown Road, Newtownards, BT23 8SL
Machinery store for farm equipment
-
LA06/2026/0799/O Awaiting decision
Rear of 40-42a Church Street, Bangor, BT20 3HY
Dwelling on lands to rear of 40-42a Church Street accessed via Croft Lane
-
LA06/2026/0794/F Awaiting decision
Robins Nest Gift & Coffee Emporium 14 New Street Donaghadee BT21 0AG
Single storey cabin containing WC & retail space located to the rear of the existing building, replacing existing WC cabin
-
LA06/2026/0793/O Granted
Lands approx. 70m NE of 12 Drumreagh Road, Ballygowan, BT23 6LJ
Farm dwelling, garage
-
LA06/2026/0800/F Awaiting decision
1 Orchard Drive, Killinchy, BT23 6QT
3-bay garage/boat store to front
-
LA06/2026/0795/F Granted
12 Frances Street and 2-6 North Street, Newtownards, BT23 4DE
5no. Dwellings (Change of House Type A to that approved under LA06/2024/0926/F).
-
LA06/2026/0796/LBC Awaiting decision
10 Glen Road, Holywood, BT18 0HB
Two additional windows within the extension.
-
LA06/2026/0792/F Awaiting decision
29 Dunleath Drive Ballywalter BT22 2TE
Single-storey side extension (to replace garage)
-
LA06/2026/0791/F Granted
39 Loughries Road Newtownards BT23 8RW
Repositioning of access
-
LA06/2026/0790/F Awaiting decision
39 Loughries Road Newtownards BT23 8RW
Detached single storey garage
-
LA06/2026/0788/F Granted
5 Kintyre Avenue Holywood BT18 0LY
Single-storey extensions and new windows to front and side.
-
LA06/2026/0789/F Granted
26 Holymount Road Newtownards BT23 7DL
Single-storey rear extension
-
LA06/2026/0787/F Granted
4 McBriar Park Carrowdore BT22 2UN
Erection of wooden fence to front/side boundary (retrospective)
-
LA06/2026/0785/DC Awaiting decision
Lands 51M SW of Killaire House, 22 Killaire Road, Bangor, BT19 1EY
Discharge of Condition 18 of previously approved application LA06/2022/0502/F which states:- A lighting plan shall be submitted to and approved in writing by the Council prior to the commencement of development. The plan shall comply with the Technical Specifications in the Bat Conservation Trusts document Bats and Lighting: Overview of current evidence and mitigation guidance. Stone, E.L. (2013) and shall be designed to have minimal spill into wooded areas. Reason: To minimise the impact of the proposal on foraging and roosting bats Please refer to the following:- Drawing Nr 0322.113 - House 1 Lighting Plan Drawing Nr 0322.114 - House 2 Lighting Plan Drawing Nr 0322.115 - House 3 Lighting Plan Discharge of Condition 19 of previously approved application LA06/2022/0502/F which states:- Samples of the following external materials for House 1 shall be submitted to the council and approved in writing in conjunction with HED prior to the commencement of development: a. Timber cladding b. Roof flashings - ie at exposed edges c. Rainwater disposal pipes d. Render, including texture and colour e. Window and external door frames and f. Hard landscaping finishes Samples of brickwork, timber cladding, roof flashings, rainwater disposal pipes, external window/door frames, hard landscaping. Brickwork - Weinerberger Langdale - ww.wienerberger.co.uk/product-range/bricks/langdale Timber Cladding - Ecoscape Argent Composite Cladding - www.ecoscape.co.uk/composite-cladding/product/argent-composite-panel-cladding-board Roof Flashings - Polyester powder coated capping piece with 75mm deep drip detail powder coated to RAL 7016 Rainwater Downpipes - 70mm dia PPC aluminium powder coated to RAL 7016 (concealed to first floor behind timber cladding) Rainwater Gutters - Secret gutters to rear of parapet walls formed in Sika Trocal metal External Window/Door Frames - PPC aluminium powder coated to RAL 7016 Hard Landscaping Paths - Tobermore Artro Platinum linear paving with constrasting limestone kerb edging Hard Landscaping Patios - Roccia White Porcelain 900x600x20mm tiles Hard Landscaping Driveway - Stone Mastic Asphalt *Please Note - Sample board is available to view at Killaire House, 22 Killaire Road, Bangor upon request** Discharge of Condition 20 of previously approved application LA06/2022/0502/F which states:- No development shall take place on-site until the method of sewage disposal has been agreed in writing with Northern Ireland Water or a Consent to discharge has been granted under the terms of the Water (Northern Ireland) Order 1999 by the relevant authority. Evidence of this consent shall be submitted to the Council prior to commencement of any development Reason: To ensure no adverse effect on the water environment Please refer to Pyper McLarnon drainage drawings and specification ischarge of Condition 11 of previously approved application LA06/2022/0502/F which states:- If within a period of 5 years from the date of the planting of any tree, shrub or hedge, that tree, shrub or hedge is removed, uprooted or destroyed or dies, or becomes, in the opinion of the Council, seriously damaged or defective, another tree, shrub or hedge of the same species and size as that originally planted shall be planted as the same place, unless the Council gives its written consent to any variation. Reason: To ensure the provision, establishment and maintenance of a high standard of landscape Landscaping plan provided
-
LA06/2026/0786/F Awaiting decision
2 Old Cultra Road, Holywood, BT18 0AE
Demotion of rear return with erection of single storey rear-side extension. Conversion of garden shed to garden room. External refurbishment including replacement windows.
-
LA06/2026/0783/F Granted
The Watch House, 24 The Point, Groomsport, BT19 6JN
Extension/conversion of garage to create two-storey outbuilding (gym/home office/artist's studio) and associated parking/landscaping
-
LA06/2026/0781/F Awaiting decision
15a Morningside, Bangor, BT20 5PD
Replacement two storey dwelling - retention of dwelling in non-compliance with Condition 7 of approval LA06/2024/0726/F to allow retention of clear glazing to bedroom windows in lieu of obscure glazing.
-
LA06/2026/0780/DC Awaiting decision
Cordners,13 Conway Square, Newtownards, BT23 4DA
Discharge of Condition 2 of previously approved application LA06/2025/1089/F which states:- No site works of any nature or development shall take place until a programme of archaeological work (POW) has been prepared by a qualified archaeologist, submitted by the applicant and approved in writing by Ards and North Down Borough Council (ANDBC) in consultation with Historic Environment Division, Department for Communities. The POW shall provide for: • The identification and evaluation of archaeological remains within the site; • Mitigation of the impacts of development through licensed excavation recording or by preservation of remains in-situ; • Post-excavation analysis sufficient to prepare an archaeological report, to publication standard if necessary; and •Preparation of the digital, documentary and material archive for deposition. Reason: As required by Section 61 of the Planning Act (Northern Ireland) to ensure that archaeological remains within the application site are properly identified, and protected or appropriately recorded. Archaeological Impact assessment and Programme of Works proposed development works at Cordners, 13 Conway Square, Newtownards BT23 4DA
-
LA06/2026/0775/PAN Granted
Belfast City Airport, Sydenham Bypass, Belfast. BT3 9JH
Belfast City Airport is proposing a programme of improvements to enhance passenger facilities, improve aircraft operations and strengthen connectivity to and from the airport. The proposals include both physical redevelopment works and changes to existing operational controls set out in the Planning Agreement, including an increase in the permitted number of aircraft take-offs and landings per annum and amendments to the hours during which aircraft operations may take place. The proposed development comprises: • Extensions and alterations to the existing passenger terminal, including construction of a replacement passenger pier and associated aircraft boarding facilities. • Additional aircraft stands and improvements to apron and taxiway infrastructure. • Improvements to airfield operational facilities and supporting infrastructure. • Inclusion of sustainable construction measures and low carbon technologies. • Surface access and infrastructure improvements comprising a multi-modal forecourt. • Enhancements to vehicular access, egress and internal circulation, including creation of a new left slip road from the Sydenham Bypass into the airport and improvements to the airport entrance through a dual right turn lane. • Rationalisation and enhancement of car parking provision, including a creation of a multi-storey car park and long stay car park. • Installation of a foul sewer connection from the onsite pumping station to Kinnegar Wastewater Treatment Works. • A temporary construction compound, and associated infrastructure, engineering, landscaping and ancillary works.
-
LA06/2026/0778/PAN Granted
Belfast City Airport, Sydenham Bypass, Belfast. BT3 9JH
Belfast City Airport is proposing a programme of improvements to enhance passenger facilities, improve aircraft operations and strengthen connectivity to and from the airport. This PAN relates to a proposed outline planning application for supporting airport infrastructure and associated development, including: • ancillary aviation operations, including aircraft hangars, aviation fuel tanks and associated infrastructure; • a hotel; • the installation of solar photovoltaic (PV) panels at various locations across the airport; • an electric vehicle charging hub; and • improvements to landscaping, drainage, utilities, servicing infrastructure, and other ancillary development
-
LA06/2026/0776/F Granted
102 Silverbirch Road, Bangor, BT19 6FA
Single-storey rear extension, raised patio and rear level access (garage to be demolished)
-
LA06/2026/0777/DC Awaiting decision
Site of former Bangor Castle Leisure Centre Adjacent to 7 Castle Park Avenue, Bangor, BT20 4BN
Discharge of Condition 8 of previously approved application LA06/2019/1295/F which states:- No development shall take place on-site until the method of sewage disposal has been agreed in writing with Northern Ireland Water or a consent to discharge has been granted under the terms of the Water (Northern Ireland) Order 1999 and evidence of this is submitted to the Council. Northern Ireland Water: Final Response Correspondence
-
LA06/2026/0779/F Granted
39 Henderson Drive, Bangor, BT19 1NP
Single-storey extension to rear.
-
LA06/2026/0772/F Awaiting decision
29D Carrowdore Road Newtownards BT22 2LU
Amended Access to Dwelling approved under LA06/2016/0849/F (Retrospective)
-
LA06/2026/0771/F Granted
3 Killaire Court, Bangor, BT19 1XE
Single-storey extension to provide ancillary accommodation (Renewal of LA06/2021/0653/F).
-
LA06/2026/0770/F Granted
9 Ballygraffan Road, Comber, BT23 5NB
Conversion and alteration to barn to form extension (via new link).
-
LA06/2026/0769/F Awaiting decision
3 The Square, Portaferry Road, Cloughey, BT22 1HR and lands adjoining 5,7 and 9 Portaferry Road, BT22 1HP and 2,12,18, 22 Mill Lane, Cloughey, BT22 1HT
Residential development of 34 dwellings (Renewal of LA06/2019/0634/F)
-
LA06/2026/0765/DC Granted
3 The Square, Portaferry Road, Cloughey, BT22 1HR and lands adjoining 5,7 and 9 Portaferry Road, BT22 1HP and 2,12,18 and 22 Mill Lane Cloughey, BT22 1HT
Discharge of Condition 3 of previously approved application LA06/2019/0634/F which states:- No other development hereby permitted shall be commenced until works necessary for the improvement of a public road have been completed in accordance with the details outlined in blue on Drawing 30 bearing the date stamp 09/06/2021. The council hereby attaches to the determination a requirement under Article 3 (4A) of the above Order that such works shall be carried out in accordance with an agreement under Article 3 (4C) Letter from DFI Roads / Southern condition confirming that following a recent site visit that the formation of the access and associated improvement works to the public road, as required as part of the Article 3(4c) have been completed in accordance withe approved Private Streets Determination drawings (under Planning Permission LA06/2019/0634/F) and to the required standard
-
LA06/2026/0764/NMC Awaiting decision
18-20 Victoria Avenue, Newtownards, BT23 7EB
NMC to approval LA06/2023/2042/F. Reposition of dwelling (Site No.3) approx 3 meters East
-
LA06/2026/0762/F Granted
64 Princess Gardens, Holywood, BT18 0PW
Single-storey extension to side (demolition of garage)
-
LA06/2026/0760/DC Granted
Lands to rear of 38 High Street Donaghadee with access adjacent to 11-13 New Street Donaghadee
Discharge of Condition 7 of previously approved application LA06/2017/0959/F which states:- No development shall take place until full details of all proposed tree and shrub planting and a programme of works, have been submitted to and approved in writing by the Council and all tree and shrub planting shall be carried out in accordance with those details and at those times. Reason: To ensure the provision, establishment, and maintenance of a high standard of landscape. Please describe which part of the condition this application relates to: This Landscape Proposal presents a design scheme prepared by a qualified landscape architect, and will provide for the provision and establishment of a high standard of landscape. TSA Covering Letter Landscaping Proposal Site Location Plan Decision Notice
-
LA06/2026/0758/DC Awaiting decision
Vacant site North of Balloo Road, West of Bangor Grammar sports pitches and to the rear of 1-13 Rowan Glen, Balloo Road, Bangor, BT19 7UU
Discharge of Condition 15 of previously approved application LA06/2022/0873/F which states:- No construction works shall commence on site until the final Construction Environmental Management Plan (CEMP) has been submitted to and approved in writing by the Council. It must outline the methods to be employed to minimise any noise and dust impacts associated with the construction operations demonstrating the use of ‘best practicable means’. The plan must pay due regard to BS 5228:2009+A1:2014 Code of Practice for Noise and Vibration on Construction and Open Sites. Once agreed, development shall be undertaken in strict accordance with the CEMP Reason: To protect the amenity of neighbouring dwellings with respect to noise, and dust
-
LA06/2026/0757/F Awaiting decision
5 Clifton Road, Bangor, BT20 5EW
Change of use from Dwelling to Self Catering Tourist Accommodation (Retrospective)
-
LA06/2026/0755/F Granted
49 Ardmillan Road, Killinchy, BT23 6QW
Single-storey detached garage to rear
-
LA06/2026/0753/LBC Awaiting decision
4 Tudor Park Holywood BT18 0NX
Demolition and replacement of first floor internal solid wall with a timber and plaster-boarded stud wall. Levelling of existing floor on both sides of replacement wall and redecoration and reinstatement of existing decorative feature.
-
LA06/2026/0752/DC Granted
3 (The Square) Portaferry Road Cloughey BT22 1HR And lands adjoining No.s 5,7 and 9 Portaferry Road, BT22 1HP and No.s 2,12,18 and 22 Mill Lane Cloughey, BT22 1HT
Discharge of Condition 8 of Planning Approval: LA06/2019/0634/F - The drainage assessment states that it is proposed to attenuate more than the 30 year event in the drainage network. Therefore, prior to the commencement of any development hereby permitted, a final drainage assessment, containing a detailed drainage network design and compliant with Annex D of PPS 15 must be submitted to the Council for its consideration and written approval; or written confirmation from NIW stating that they will adopt a drainage network that will attenuate the 1 in 100 year storm event.
-
LA06/2026/0750/F Granted
16 Ballymacormick Road, Bangor, BT19 6AA
Single storey extension to rear; new cladding to front and side.
-
LA06/2026/0754/DC Awaiting decision
Lands to the north side of Cloughey Road (opposite 9-17 Cloughey Road) and to the rear of Rectory Wood and extending 130m to the rear of 8 Cloughey Road (The Rectory), Portaferry
Discharge of Condition 7 of Planning Approval LA06/2023/1336/F which states 'No development shall commence until the details of a surface water drainage scheme, which shall incorporate Sustainable Urban Drainage System (SUDS) principles, has been submitted to and approved in writing by the Council. The scheme shall be prepared by an expert competent in SuDs design. It shall include a programme for implementation of the works and proposals for future maintenance and management. The development shall not be carried out unless in accordance with the approved SUDS scheme. The maintenance and management of the surface water drainage scheme shall be permanently carried out in accordance with the approved details.
-
LA06/2026/0751/F Awaiting decision
Crangarra, 3 Ailsa Road, Holywood, BT18 0AS
Two-storey, and single-storey,rear extensions and two-storey linked annex/garage to rear (including demolition of rear return and outbuilding)
-
LA06/2026/0747/F Awaiting decision
Lands 200m SE of 110 Kempstones Road Newtownards
Glamping accomodation and ancillary facilities (retention of existing buildings and one additional shepherds hut)
-
LA06/2026/0749/F Granted
15 Lochinver Avenue,Holywood, BT18 0NQ
Conversion of garage to ancillary accommodation (including new door/windows)
-
LA06/2026/0748/F Awaiting decision
69 Whinney Hill, Holywood, BT18 0HG
Dwelling and garage - Change of house type to that previously approved under application LA06/2021/0802/F (retrospective)
-
LA06/2026/0744/LBC Granted
3 Clanbrassil Terrace, Cultra, BT18 0AP
works within the curtilage of a listed building - sunken terrace (retrospective)