Vacant site North of Balloo Road, West of Bangor Grammar sports pitches and to the rear of 1-13 Rowan Glen, Balloo Road, Bangor, BT19 7UU

Awaiting decision Ards and North Down LA06/2026/0758/DC Discharge of Condition

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Discharge of Condition 15 of previously approved application LA06/2022/0873/F which states:- No construction works shall commence on site until the final Construction Environmental Management Plan (CEMP) has been submitted to and approved in writing by the Council. It must outline the methods to be employed to minimise any noise and dust impacts associated with the construction operations demonstrating the use of ‘best practicable means’. The plan must pay due regard to BS 5228:2009+A1:2014 Code of Practice for Noise and Vibration on Construction and Open Sites. Once agreed, development shall be undertaken in strict accordance with the CEMP Reason: To protect the amenity of neighbouring dwellings with respect to noise, and dust

As published by the council, reference LA06/2026/0758/DC

Application record

Reference
LA06/2026/0758/DC
Type
Discharge of Condition
Status
Consultation Open
Received
18 Aug 2026
Validated
18 Aug 2026
Ward
Bloomfield (North Down and Ards)
Postcode
BT19 7UU

Comment by 10 September 2026

The council is taking comments on this application until then. Comments go to Ards and North Down through their own planning portal.

Timeline

Dates from the published record

  1. 18 Aug 2026

    Received by Ards and North Down

  2. 27 Aug 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 13 October 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Ards and North Down took a median of 78 days over the applications it decided in the last year.

Documents

Plans, drawings, consultee responses and the officer's report

6 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What happens while it is decided

This application is with Ards and North Down for determination, against a statutory target of eight weeks. Over the last year Ards and North Down decided condition discharge and variation applications in a median of 50 days. More in our guide to how long planning decisions take.

About condition discharge and variation applications

This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.

Nearby applications

Within 500 metres

In Ards and North Down

  • 3 (The Square) Portaferry Road Cloughey BT22 1HR And lands adjoining No.s 5,7 and 9 Portaferry Road, BT22 1HP and No.s 2,12,18 and 22 Mill Lane Cloughey, BT22 1HT

    Discharge of Condition 8 of Planning Approval: LA06/2019/0634/F - The drainage assessment states that it is proposed to attenuate more than the 30 year event in the drainage network. Therefore, prior to the commencement of any development hereby permitted, a final drainage assessment, containing a detailed drainage network design and compliant with Annex D of PPS 15 must be submitted to the Council for its consideration and written approval; or written confirmation from NIW stating that they will adopt a drainage network that will attenuate the 1 in 100 year storm event.

    14 Aug 2026 Conditions
  • Lands to the NW of Kiltonga Industrial Estate SW of Belfast Road and South of Milecross Road Newtownards

    Discharge of Condition 29 of previously approved application LA06/2021/1476/F which states: A programme of post-excavation analysis, preparation of an archaeological report, dissemination of results and preparation of the excavation archive shall be undertaken in accordance with the programme of archaeological work approved under condition 27. These measures shall be implemented, and a final archaeological report shall be submitted to the Council within 12 months of the completion of archaeological site works, or as otherwise agreed in writing with the Council. Submitting a POW report which states discovery that there was an archaeological evaluation carried out in 2017 across the site which didn’t encounter any archaeology. This should mean no further archaeological works are required on site

    11 Jun 2026 Conditions
  • 3 The Square, Portaferry Road, Cloughey, BT22 1HR and lands adjoining 5,7 and 9 Portaferry Road, BT22 1HP and 2,12,18 and 22 Mill Lane Cloughey, BT22 1HT

    Discharge of Condition 3 of previously approved application LA06/2019/0634/F which states:- No other development hereby permitted shall be commenced until works necessary for the improvement of a public road have been completed in accordance with the details outlined in blue on Drawing 30 bearing the date stamp 09/06/2021. The council hereby attaches to the determination a requirement under Article 3 (4A) of the above Order that such works shall be carried out in accordance with an agreement under Article 3 (4C) Letter from DFI Roads / Southern condition confirming that following a recent site visit that the formation of the access and associated improvement works to the public road, as required as part of the Article 3(4c) have been completed in accordance withe approved Private Streets Determination drawings (under Planning Permission LA06/2019/0634/F) and to the required standard

    19 Aug 2026 Conditions
  • Lands adjacent to and Northeast of 3 Warren Avenue Donaghadee, BT21 0PE. Access via Warren Avenue to Warren Road

    Discharge of Condition 8 of Planning Approval LA06/2020/0558/F which states 'A final detailed Construction Environmental Management Plan (CEMP) shall be submitted to and approved by Council in consultation with the Shared Environmental Service (SES) prior to the commencement of development. The final CEMP shall reflect all the mitigation and avoidance measures detailed in the outline CEMP. The final CEMP shall be adhered to and implemented throughout the construction period and in accordance with the approved details, unless otherwise agreed in writing by the Council.'

    13 May 2026 Conditions
  • 3 (The Square) Portaferry Road Cloughey BT22 1HR And lands adjoining 5,7 and 9 Portaferry Road, BT22 1HP and 2,12,18 and 22 Mill Lane Cloughey, BT22 1HT

    Discharge of Condition 6 of previously approved application LA06/2019/0634/F which states:- The development herby permitted shall not be commenced until a Street Lighting scheme design has been submitted and approved by DFI Street Lighting Section Documents relating to Street Lighting Scheme Design that have been submitted to and Approved by the DFI Street Lighting Section

    4 Aug 2026 Conditions