Skip to content
PlanIndex Get alerts
Menu

Planning application

Belfast City Airport, Sydenham Bypass, Belfast. BT3 9JH

Awaiting decision Ards and North Down LA06/2026/0775/PAN Proposal of Application Notice

Works: Extension

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Belfast City Airport is proposing a programme of improvements to enhance passenger facilities, improve aircraft operations and strengthen connectivity to and from the airport. The proposals include both physical redevelopment works and changes to existing operational controls set out in the Planning Agreement, including an increase in the permitted number of aircraft take-offs and landings per annum and amendments to the hours during which aircraft operations may take place. The proposed development comprises: • Extensions and alterations to the existing passenger terminal, including construction of a replacement passenger pier and associated aircraft boarding facilities. • Additional aircraft stands and improvements to apron and taxiway infrastructure. • Improvements to airfield operational facilities and supporting infrastructure. • Inclusion of sustainable construction measures and low carbon technologies. • Surface access and infrastructure improvements comprising a multi-modal forecourt. • Enhancements to vehicular access, egress and internal circulation, including creation of a new left slip road from the Sydenham Bypass into the airport and improvements to the airport entrance through a dual right turn lane. • Rationalisation and enhancement of car parking provision, including a creation of a multi-storey car park and long stay car park. • Installation of a foul sewer connection from the onsite pumping station to Kinnegar Wastewater Treatment Works. • A temporary construction compound, and associated infrastructure, engineering, landscaping and ancillary works.

As published by the council, reference LA06/2026/0775/PAN

Application record

Reference
LA06/2026/0775/PAN
Type
Proposal of Application Notice
Status
Valid
Received
24 Aug 2026
Validated
24 Aug 2026
Ward
Garnerville
Postcode
BT3 9JH

Timeline

Dates from the published record

  1. 24 Aug 2026

    Received by Ards and North Down

  2. 3 Sep 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 19 October 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Ards and North Down took a median of 78 days over the applications it decided in the last year.

Documents

Plans, drawings, consultee responses and the officer's report

5 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What happens while it is decided

The process from here

This application is with Ards and North Down for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About this record

Reading the register

This page mirrors an entry on the statutory planning register that Ards and North Down is required to keep. The published feed for this record does not state which type of application it is, which is common for older entries and for some council systems; the register entry on the council portal will say, alongside the case officer and any consultation dates.

Every planning application follows the same broad path: submission, validation, publicity, then a decision by officers or committee. Our guide to planning application types explains the common types and what each can approve.

Nearby applications

Within 500 metres

  • Belfast City Airport, Sydenham Bypass, Belfast. BT3 9JH

    LA06/2026/0778/PAN Submitted 24 Aug 2026 0m away

    96% historically approved · decision due ~19 Oct

    Belfast City Airport is proposing a programme of improvements to enhance passenger facilities, improve aircraft operations and strengthen connectivity to and from the airport. This PAN relates to a proposed outline planning application for supporting airport infrastructure and associated development, including: • ancillary aviation operations, including aircraft hangars, aviation fuel tanks and associated infrastructure; • a hotel; • the installation of solar photovoltaic (PV) panels at various locations across the airport; • an electric vehicle charging hub; and • improvements to landscaping, drainage, utilities, servicing infrastructure, and other ancillary development

    Awaiting decision 5 docs
  • Belfast City Airport Sydenham Bypass Belfast BT3 9JH Northern Ireland

    LA04/2026/1499/PAN Submitted 24 Aug 2026 12m away

    98% historically approved · decision due ~21 Oct

    This PAN relates to a proposed outline planning application affecting land within the administrative areas of both Belfast City Council and Ards and North Down Borough Council. Separate PANs have been submitted to each Council and should be read alongside the parallel PAN for the proposed outline planning application at Belfast City Airport. The consultation arrangements set out in Section G apply to both planning applications and to the proposed amendments to the Planning Agreement, which are being undertaken as part of a voluntary public consultation process. Belfast City Airport is proposing a programme of improvements to enhance passenger facilities, improve aircraft operations and strengthen connectivity to and from the airport. This PAN relates to a proposed outline planning application for supporting airport infrastructure and associated development including:: •ancillary aviation operations, including aircraft hangars, aviation fuel tanks and associated infrastructure; •a hotel; •the installation of solar photovoltaic (PV) panels at various locations across the airport; • an electric vehicle charging hub; and • improvements to landscaping, drainage, utilities, servicing infrastructure, and other ancillary development.

    Awaiting decision 4 docs
  • Belfast City Airport Sydenham Bypass Belfast BT3 9JH Northern Ireland

    LA04/2026/1498/PAN Submitted 24 Aug 2026 12m away

    98% historically approved · decision due ~21 Oct

    This PAN relates to a proposed full planning application affecting land within the administrative areas of both Belfast City Council and Ards and North Down Borough Council. Separate PANs have been submitted to each Council and should be read alongside the parallel PAN for the proposed outline planning application at Belfast City Airport. The consultation arrangements set out in Section G apply to both planning applications and to the proposed amendments to the Planning Agreement, which are being undertaken as part of a voluntary public consultation process. Belfast City Airport is proposing a programme of improvements to enhance passenger facilities, improve aircraft operations and strengthen connectivity to and from the airport. The proposals include both physical redevelopment works and changes to existing operational controls set out in the Planning Agreement, including an increase in the permitted number of aircraft take-offs and landings per annum and amendments to the hours during which aircraft operations may take place. The proposed development comprises: •Extensions and alterations to the existing passenger terminal, including construction of a replacement passenger pier and associated aircraft boarding facilities. •Additional aircraft stands and improvements to apron and taxiway infrastructure. •Improvements to airfield operational facilities and supporting infrastructure. •Inclusion of sustainable construction measures and low carbon technologies. •Surface access and infrastructure improvements comprising a multi-modal forecourt. •Enhancements to vehicular access, egress and internal circulation, including creation of a new left slip road from the Sydenham Bypass into the airport and improvements to the airport entrance through a dual right turn lane. •Rationalisation and enhancement of car parking provision, including a creation of a multi-storey car park and long stay car park. •Installation of a foul sewer connection from the onsite pumping station to Kinnegar Wastewater Treatment Works. •A temporary construction compound, and associated infrastructure, engineering, landscaping and ancillary works.

    Awaiting decision Extension 4 docs
  • Airbus WPU, Airport Road West, Belfast, BT3 9ED

    LA04/2026/1227/NMC Submitted 6 Jul 2026 365m away

    86% historically approved · decision due ~9 Sep

    Non-Material Change to approval LA04/2019/2850/F- minor adjustments including slightly increased office area, changes to office elevations, change to roof profile of autoclave bay, addition of roof access stair to east elevation (of Phase 1A), and increase in comms room to east elevation (of Phase 1A).

    Awaiting decision Amendments 1 doc
  • Spirit Aerosystems, Lands circa. 150m East of 7 Airport Road West, Belfast, BT3 9DZ

    LA04/2025/1780/PAN Submitted 22 Oct 2025 423m away

    Erection of a new associated office building (approx. 10,125 m² GIA) with associated infrastructure and ancillary facilities, including substations, security and waste management facilities, parking for cars, HGVs and cycles spaces, new site access, internal roads, and all associated works.

    Decided 4 docs