Planning application
LA06/2025/1098/DC
16-18 The Square, Ballygowan, BT23 6HU
Proposal
Discharge of Conditions 2, 5 and 6 of previously approved application LA06/2018/0541/F - Discharge of Condition 2 which states - The vehicular access, including visibility splays and any forward sight distance, shall be provided in accordance with Drawing No.05C bearing the date stamp 6th October 2020, prior to the commencement of any other development hereby permitted. The area within the visibility splays and any forward sight line shall be cleared to provide a level surface no higher than 250mm above the level of the adjoining carriageway and such splays shall be retained and kept clear thereafter. Reason: To ensure there is a satisfactory means of access in the interests of road safety and the convenience of road users. Discharge of Condition 5 which states:- No development shall take place on-site until either the Waste Water Treatment Works at Ballygowan has been upgraded and becomes fully operational, in line with planning permission LA06/2018/1213/F, and it has been agreed with NI Water in writing that there is available capacity to serve the approved apartments or alternatively, a Consent to discharge for the private treatment plant has been granted in writing under the terms of the Water (NI) Order 1999. Reason: To ensure protection of the aquatic environment and to help the applicant avoid incurring unnecessary expense before it can be ascertained that a feasible method of sewage disposal is possible at this site. Discharge of Condition 6 which states:- Prior to any works commencing on site, a final Construction Environmental Management Plan and finalised Site Drainage Plan shall be submitted by the applicant/approved contractor to the Council for agreement in writing. This shall reflect and detail all the pollution prevention, mitigation and avoidance measures as outlined within the Outline Construction Environmental Management Plan (date stamped 24th May 2019) and all additional submitted information. All measures agreed in the final Construction Environmental Management Plan and finalised Site Drainage Plan shall be implemented as approved. Reason: To ensure that the appointed contractor is aware of and implements the appropriate environmental mitigation during construction phase that will protect the hydrologically connected European Site features.
As published by the council, reference LA06/2025/1098/DC
Timeline
Dates from the published record
-
8 Dec 2025
Received by Ards and North Down
-
19 Jun 2026
Decision issued: Condition Partially Discharged
-
29 Jul 2026
Added to PlanIndex
After the decision
The process from here
The council has decided this application; the published outcome sits in the record above and the decision notice on the council portal carries the detail, including any conditions.
If permission was granted, work must normally begin within three years of the decision. If it was refused, the applicant can appeal within the statutory time limit or submit a revised scheme.
About conditions applications
How this application type works
This type of application deals with conditions attached to an existing permission, either by supplying the details a condition requires, called discharging it, or by asking to vary or remove one. It does not reopen the principle of the permission itself. Building often cannot lawfully start, or continue past a set stage, until the named conditions are discharged.
Nearby applications
Within 500 metres
-
LA06/2026/0529/F Granted
7 Prospect Crescent, Ballygowan, BT23 6LR
First-floor rear extension
-
LA06/2026/0092/F Granted
6 Mossvale Avenue, Ballygowan, BT23 6LG
Rear dormer
Other conditions applications
In Ards and North Down
-
LA06/2026/0523/DC Decided
Lands to the rear of 23-61 Castle Street, Comber, BT23 5EA
Discharge of Condition 6 of previously approved application LA06/2021/1220/F which states - Prior to the occupation of the proposed development, a Verification Report shall be submitted to and agreed in writing by the Council. This report shall demonstrate that the remediation measures outlined in the Pentland Macdonald report; Contamination Assessment and remediation strategy, Castle Lane, Comber referenced PM19- 1137 and dated December 20219 have been implemented. The Verification Report shall demonstrate the successful completion of remediation works and that the site is now fit for end-use (Residential with Plant Uptake). It must demonstrate that the identified potential pollutant linkages are effectively broken. The Verification Report shall be in accordance with current guidance and best practice. In particular, this Verification Report must demonstrate that: • The final site layout including areas of hardstandlng, gardens and soft landscaped areas are as specified in the Site Plan Proposed Drawing No. 03A. • The emplacement of capping layers across gardens and landscaped areas is as specified: In garden areas- 1m capping layer comprising a capillary break layer of a minimum of 300mm of granular material; overlain by 700mm of clean subsoil and topsoil and in soft landscaped areas- the emplacement of a 0.5m thick capping layer of glean gravel/ subsoil topsoil. All material used in the capping layers must be demonstrably proven suitable for use. • Gas protection measures have been installed in line with a Characteristic Situation 2 scenario which attain a gas protection score of 3.5 (Table 4, B88485) and shall include two or more of the following measures: • Concrete floor slabs; • A proprietary gas resistant membrane installed across the entire footprint of the buildings; • A passively ventilated under floor void. The verification of the gas protection measures shall follow CIRIA C735 Good Practice on the testing and verification of protection systems for buildings against hazardous ground gases. Information Submitted: Verification Report
-
LA06/2026/0656/DC Awaiting decision
Lands to and South of Nos 37-77 Court Street and Nos 1-11 Canal Row, situated within Bawn Wall and bounded by the Canal, Newtownards
Discharge of condition 15 of planning approval LA06/2023/2434/F Which States: "On completion of the remediation and prior to the occupation of any dwelling hereby approved, the applicant shall provide to the Council, for approval in writing, a Verification Report. This report shall demonstrate that the remediation measures outlined in the report titled; ‘Contaminated Land Assessment (Phase 1 PRA, Phase 2 GQRA and Outline Remediation Strategy) Lands within the Bawn Wall, Newtownards, referenced P3098-1 and dated November 2023, have been fully implemented. This report shall demonstrate the successful completion of remediation works and demonstrate that the site is now fit for end-use and include details of: • Capping system • The methodology and programme of the capping system • Photographs and records of any excavation works within the source area including photographs showing depths to accommodate the capping layer • Photographs of the clean material being used and placed on the source area, also showing depths being placed • Records and photographs showing the depth of the capping system as required • Details of the materials that were used for the capping system along with laboratory certificates and results which confirm that the materials are suitable for use."
-
LA06/2026/0516/DC Decided
Lands to the rear of Nos. 23-61 Castle Street, Comber, BT23 5EA
Discharge of Condition 12 of previously approved application LA06/2021/1220/F which states:- No residential units shall be occupied until a Landscape Management and Maintenance Plan has been submitted to and approved by the Council in writing. The plan shall set out the period of the plan, long term objectives, management responsibilities, performance measures and maintenance schedules for all areas of landscaping and open space. The landscape management plan shall be carried out as approved in perpetuity. Landscape Management & Maintenance Plan Condition and Discharge of Condition 13. which states:- The long term management and maintenance of the open space, as indicated in blue on Drawing No. 19 shall be undertaken by a management company commissioned by the developer. Details of the arrangements to be put in place to establish the management company and details of the alternative measures which will take effect in the event that the management arrangements break down, must be submitted to and agreed in writing with the Council prior to the occupation of any part of the development hereby permitted Radius Housing letter
-
LA06/2026/0512/DC Decided
Lands to the NW of Kiltonga Industrial Estate SW of Belfast Road and South of Milecross Road Newtownards
Discharge of Condition 20 of previously approved application LA06/2021/1476/F which states:- Prior to the occupation of any dwelling, details of the proposed phased implementation of hard and soft landscaping works must be submitted to and agreed in writing by the Council. The hard and soft landscaping works shall be implemented in accordance with the details and timings agreed in the approved phasing plan. Phase plan to show when we plan to have landscaped areas completed
-
LA06/2026/0645/DC Awaiting decision
Lands at 21 Bridge Road South Helen's Bay
Discharge of Condition 13 of previously approved application LA06/2022/0701/F which states: Prior to any development works commencing on site, the applicant shall submit to the Council for approval in writing an updated Contaminated Land Risk Assessment that has considered and incorporated all available site investigations, data and assessments conducted on this site, and all current and previous correspondence issued by the Environmental Health, Protection and Development Service and the Northern Ireland Environment Agency in relation to land contamination matters present on this site. Reason: In the interests of public health to ensure the site is suitable for use.