Skip to content
PlanIndex Get alerts
Menu

Planning application

Zoned housing land (HPA 1) and former builders yard, lands to rear of 10 Prospect Road, accessed from and North of 100-118 Oakdale, South of 1-4 Prospect Court, SW of 14-30 (even) Prospect Road and East of 9 & 10 The Paddock, Ballygowan

Awaiting decision Ards and North Down LA06/2026/0853/DC Discharge of Condition

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Discharge of Condition 3 of previously approved application LA06/2021/0834/F which states - No development shall take place until the method of sewage disposal has been agreed in writing with NIW See attached letter from WSC Consulting containing Article 161 approval & NI Water WWIA Stage 2 approval

As published by the council, reference LA06/2026/0853/DC

Application record

Reference
LA06/2026/0853/DC
Type
Discharge of Condition
Status
Consultation Open
Received
18 Sep 2026
Validated
18 Sep 2026
Ward
Ballygowan

Timeline

Dates from the published record

  1. 18 Sep 2026

    Received by Ards and North Down

  2. 1 Oct 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 13 November 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Ards and North Down took a median of 81 days over the applications it decided in the last year.

Who's behind it

Company information only, from the register and Companies House

CMP Planning & Design Ltd Agent, a planning consultancy registered in Belfast

Active · incorporated 2024 · Belfast

42 applications on PlanIndex · across 7 councils · 100% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

3 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What happens while it is decided

This application is with Ards and North Down for determination, against a statutory target of eight weeks. Over the last year Ards and North Down decided condition discharge and variation applications in a median of 61 days. More in our guide to how long planning decisions take.

About condition discharge and variation applications

This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • 7 Prospect Crescent, Ballygowan, BT23 6LR

    LA06/2026/0529/F Submitted 13 Jun 2026 150 yards away

    First-floor rear extension (Additional Drawings)

    Granted Full applications Extension 15 docs
  • 3 Prospect Park Ballygowan BT23 6LW

    LA06/2024/0758/F Submitted 3 Sep 2024 200 yards away

    Two storey side and rear extension and single storey rear extension (Amended Plans)

    Granted Full applications Extension 17 docs
    Small domestic
  • 16-18 The Square, Ballygowan, BT23 6HU

    LA06/2025/1098/DC Submitted 8 Dec 2025 400 yards away

    Discharge of Conditions 2, 5 and 6 of previously approved application LA06/2018/0541/F - Discharge of Condition 2 which states - The vehicular access, including visibility splays and any forward sight distance, shall be provided in accordance with Drawing No.05C bearing the date stamp 6th October 2020, prior to the commencement of any other development hereby permitted. The area within the visibility splays and any forward sight line shall be cleared to provide a level surface no higher than 250mm above the level of the adjoining carriageway and such splays shall be retained and kept clear thereafter. Reason: To ensure there is a satisfactory means of access in the interests of road safety and the convenience of road users. Discharge of Condition 5 which states:- No development shall take place on-site until either the Waste Water Treatment Works at Ballygowan has been upgraded and becomes fully operational, in line with planning permission LA06/2018/1213/F, and it has been agreed with NI Water in writing that there is available capacity to serve the approved apartments or alternatively, a Consent to discharge for the private treatment plant has been granted in writing under the terms of the Water (NI) Order 1999. Reason: To ensure protection of the aquatic environment and to help the applicant avoid incurring unnecessary expense before it can be ascertained that a feasible method of sewage disposal is possible at this site. Discharge of Condition 6 which states:- Prior to any works commencing on site, a final Construction Environmental Management Plan and finalised Site Drainage Plan shall be submitted by the applicant/approved contractor to the Council for agreement in writing. This shall reflect and detail all the pollution prevention, mitigation and avoidance measures as outlined within the Outline Construction Environmental Management Plan (date stamped 24th May 2019) and all additional submitted information. All measures agreed in the final Construction Environmental Management Plan and finalised Site Drainage Plan shall be implemented as approved. Reason: To ensure that the appointed contractor is aware of and implements the appropriate environmental mitigation during construction phase that will protect the hydrologically connected European Site features.

    Granted Conditions New dwelling 15 docs
  • 1 Tullygarvan Road Ballygowan BT23 6LX

    LA06/2025/0832/F Submitted 22 Sep 2025 400 yards away

    Demolition and replacement dwelling,erection of double garage with retention of wooden shed and mini treatment plant (amended description)

    Granted Full applications Demolition 16 docs
    Small domestic
  • Roundabout Bar 4 The Square Ballygowan Newtownards BT23 6HA

    LA06/2022/0956/F Submitted 20 Sep 2022 400 yards away

    Beer garden extension to rear

    Granted Full applications Extension 19 docs

In Ards and North Down

  • LA06/2026/0884/DC Awaiting decision

    Vacant site North of Balloo Road, West of Bangor Grammar sports pitches and to the rear of nos 1-13 Rowan Glen, Balloo Road, Bangor, BT19 7UU

    Discharge of Condiition 10 of previously approved application LA06/2022/0873/F which states - Prior to the construction of the drainage network, the applicant shall submit a Drainage Assessment, compliant with Policy FLD 3 & Annex D of PPS 15, to be agreed in writing with the Council, which demonstrates the safe management of any out of sewer flooding emanating from the surface water drainage network, agreed under Article 161 under the Water and Sewerage Services Act (Northern Ireland) 2016, in a 1 in 100 year event. Reason: In order to safeguard against surface water flood risk

    Received 25 Sep, published by the council 1 Oct 2026 Conditions
  • LA06/2026/0887/DC Awaiting decision

    Former Juvenile Justice Services Centre site (169 Rathgael Road) and surrounding lands which lie to the north of the Rathgael Road and west of the Rathgael Road/Balloo Road/Newtownards Road roundabout junction Bangor

    Discharge of Condition 9 of previously approved application LA06/2016/0596/F which states - Prior to the occupation of the proposed development, the applicant shall provide to the Council, for approval, a Verification Report. This report must demonstrate that all the measures outlined in Section 10 of the RPS report entitled Proposed Residential Development, Rathgael Road, Bangor, Remedial Strategy referenced IBR0736 and bearing the Council date stamp 17th June 2016 have been fully implemented. The Verification Report shall demonstrate the successful completion of the remediation works and that the site is now fit for end-use. It must demonstrate that the identified potential pollutant linkages are effectively broken. The Verification Report shall be in accordance with current best practice and guidance as outlined by the Environment Agency. In particular, this Verification Report must demonstrate: a) Full Details of the installation and depths of the clean cover barriers have been confirmed as per layout. b) All fuel transfer lines and all associated pipework have been traced and removed in accordance with PPG 2 Above Ground Oil Storage Tanks. All remaining soils (or base and side-walls of all excavations) have been sampled and proven suitable for the proposed end-use. c) The hotspots of heavy metal and hydrocarbon contamination have been removed by excavation to a depth of 0.5m below the depth of the exceedance. All remaining soils (or base and side-walls of all excavations) have been sampled and demonstrably proven suitable for the proposed end-use. d) All imported soil brought on to the site has been accompanied by traceability documentation and has been demonstrably proven to be suitable for the end use. Reason: In the interests of living conditions of residents of the proposed development. Remedial Verification Report

    Received 25 Sep, published by the council 1 Oct 2026 Conditions
  • LA06/2026/0879/DC Awaiting decision

    Royal Hotel and Windsor Bar, 22-28 Quay Street, Bangor, BT20 5ED

    Discharge of Condition 6 of previously approved application LA06/2021/1477/F which states - Prior to the construction of the drainage network, a Drainage Assessment, compliant with FLD 3 & Annex D of PPS 15, shall be submitted to and agreed in writing by the Council which demonstrates the safe management of any out of sewer flooding emanating from the surface water drainage network, in a 1 in 100 year event with an additional allowance for climate change. Reason: To safeguard against flood risk to the development and from the development to elsewhere. Drainage Assessment produced by Design ID ref 19053-DID-ZZ-XX-RP-0002

    Received 23 Sep, published by the council 1 Oct 2026 Conditions
  • LA06/2026/0878/DC Awaiting decision

    Royal Hotel and Windsor Bar, 22-28 Quay Street, Bangor, T20 5ED

    Discharge of Condition 5 of previously approved application LA06/2021/1477/F which states - No development shall take place on-site until the method of sewage disposal has been agreed in writing with Northern Ireland Water (NIW) or a consent to discharge has been granted under the terms of the Water (NI) Order 1999. Reason: To ensure there will be no adverse impact on the environment. NI Water agreement

    Received 23 Sep, published by the council 1 Oct 2026 Conditions
  • LA06/2026/0873/DC Awaiting decision

    Lands South of 37-77 Court Street and 1-11 Canal Row, situated within Bawn Wall and bounded by the canal, Newtowards

    Discharge of Condition 15 of previously approved application LA06/2023/2434/F which states - On completion of the remediation and prior to the occupation of any dwelling hereby approved, the applicant shall provide to the Council, for approval in writing, a Verification Report. This report shall demonstrate that the remediation measures outlined in the report titled; ‘Contaminated Land Assessment (Phase 1 PRA, Phase 2 GQRA and Outline Remediation Strategy) Lands within the Bawn Wall, Newtownards, referenced P3098-1 and dated November 2023, have been fully implemented. This report shall demonstrate the successful completion of remediation works and demonstrate that the site is now fit for end-use and include details of: • Capping system • The methodology and programme of the capping system • Photographs and records of any excavation works within the source area including photographs showing depths to accommodate the capping layer • Photographs of the clean material being used and placed on the source area, also showing depths being placed • Records and photographs showing the depth of the capping system as required • Details of the materials that were used for the capping system along with laboratory certificates and results which confirm that the materials are suitable for use. Reason: Protection of human health. VERIFICATION REPORT FOR PHASE 5 (UNITS 1-6 AND 34-41)

    Received 23 Sep, published by the council 1 Oct 2026 Conditions