Skip to content
PlanIndex Get alerts
Menu

Planning application

3 Prospect Park Ballygowan BT23 6LW

Granted Ards and North Down LA06/2024/0758/F Full

Works: Extension Small domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Two storey side and rear extension and single storey rear extension (Amended Plans)

As published by the council, reference LA06/2024/0758/F

Application record

Reference
LA06/2024/0758/F
Type
Full
Status
Determined
Decision
Granted
Received
3 Sep 2024
Validated
13 Sep 2024
Decided
27 Nov 2024
Ward
Ballygowan
Postcode
BT23 6LW

Timeline

Dates from the published record

  1. 3 Sep 2024

    Received by Ards and North Down

  2. 13 Sep 2024

    Validated

    Checked as complete and ready for consideration.

  3. 27 Nov 2024

    Decision issued: Granted

  4. 14 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

17 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What this grant of permission means

Ards and North Down granted permission on 27 November 2024, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 500 metres

  • 7 Prospect Crescent, Ballygowan, BT23 6LR

    LA06/2026/0529/F Submitted 13 Jun 2026 151m away

    First-floor rear extension (Additional Drawings)

    Granted Full applications Extension 15 docs
  • 1 Tullygarvan Road Ballygowan BT23 6LX

    LA06/2025/0832/F Submitted 22 Sep 2025 181m away

    Demolition and replacement dwelling,erection of double garage with retention of wooden shed and mini treatment plant (amended description)

    Granted Full applications Demolition 16 docs
    Small domestic
  • 16-18 The Square, Ballygowan, BT23 6HU

    LA06/2025/1098/DC Submitted 8 Dec 2025 449m away

    Discharge of Conditions 2, 5 and 6 of previously approved application LA06/2018/0541/F - Discharge of Condition 2 which states - The vehicular access, including visibility splays and any forward sight distance, shall be provided in accordance with Drawing No.05C bearing the date stamp 6th October 2020, prior to the commencement of any other development hereby permitted. The area within the visibility splays and any forward sight line shall be cleared to provide a level surface no higher than 250mm above the level of the adjoining carriageway and such splays shall be retained and kept clear thereafter. Reason: To ensure there is a satisfactory means of access in the interests of road safety and the convenience of road users. Discharge of Condition 5 which states:- No development shall take place on-site until either the Waste Water Treatment Works at Ballygowan has been upgraded and becomes fully operational, in line with planning permission LA06/2018/1213/F, and it has been agreed with NI Water in writing that there is available capacity to serve the approved apartments or alternatively, a Consent to discharge for the private treatment plant has been granted in writing under the terms of the Water (NI) Order 1999. Reason: To ensure protection of the aquatic environment and to help the applicant avoid incurring unnecessary expense before it can be ascertained that a feasible method of sewage disposal is possible at this site. Discharge of Condition 6 which states:- Prior to any works commencing on site, a final Construction Environmental Management Plan and finalised Site Drainage Plan shall be submitted by the applicant/approved contractor to the Council for agreement in writing. This shall reflect and detail all the pollution prevention, mitigation and avoidance measures as outlined within the Outline Construction Environmental Management Plan (date stamped 24th May 2019) and all additional submitted information. All measures agreed in the final Construction Environmental Management Plan and finalised Site Drainage Plan shall be implemented as approved. Reason: To ensure that the appointed contractor is aware of and implements the appropriate environmental mitigation during construction phase that will protect the hydrologically connected European Site features.

    Decided Conditions New dwelling 15 docs

In Ards and North Down

  • 9 Marine Drive Donaghadee BT21 0HS

    Single-storey extensions (front, side and rear) including car port; demolition of garage and lean-to structure

    15 May 2026 Full applications
  • 104 Princetown Road, Bangor, BT20 3TG

    Demolition of existing rear return: two-storey side-to-rear extension; single-storey side extension; relocation of access and all associated works

    10 Feb 2026 Full applications
  • Marine Biology Station 12-13 The Strand, Portaferry, BT22 1PF

    Demolition of ''lean to' shed and erection of open sided canopies to be erected over new research tanks

    27 Mar 2026 Full applications
  • 79a Whinney Hill, Dundonald, BT16 1UA

    Single storey side sunroom and double garage with link to main dwelling.

    13 May 2026 Full applications
  • 62 Jackson's Road, Holywood, BT18 9EZ

    Roofspace conversion including rear dormer

    23 May 2026 Full applications