Planning application
3 Prospect Park Ballygowan BT23 6LW
Works: Extension Small domestic
Read from the description, not a valuation. How we read the register
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Two storey side and rear extension and single storey rear extension (Amended Plans)
As published by the council, reference LA06/2024/0758/F
Application record
- Reference
- LA06/2024/0758/F
- Type
- Full
- Status
- Determined
- Decision
- Granted
- Received
- 3 Sep 2024
- Validated
- 13 Sep 2024
- Decided
- 27 Nov 2024
- Ward
- Ballygowan
- Postcode
- BT23 6LW
Timeline
Dates from the published record
-
3 Sep 2024
Received by Ards and North Down
-
13 Sep 2024
Validated
Checked as complete and ready for consideration.
-
27 Nov 2024
Decision issued: Granted
-
14 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
17 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Ards and North Down granted permission on 27 November 2024, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
7 Prospect Crescent, Ballygowan, BT23 6LR
First-floor rear extension (Additional Drawings)
Granted Full applications Extension 15 docs -
Zoned housing land (HPA 1) and former builders yard, lands to rear of 10 Prospect Road, accessed from and North of 100-118 Oakdale, South of 1-4 Prospect Court, SW of 14-30 (even) Prospect Road and East of 9 & 10 The Paddock, Ballygowan
100% historically approved · decision due ~13 Nov
Discharge of Condition 3 of previously approved application LA06/2021/0834/F which states - No development shall take place until the method of sewage disposal has been agreed in writing with NIW See attached letter from WSC Consulting containing Article 161 approval & NI Water WWIA Stage 2 approval
Awaiting decision Conditions 3 docs -
1 Tullygarvan Road Ballygowan BT23 6LX
Demolition and replacement dwelling,erection of double garage with retention of wooden shed and mini treatment plant (amended description)
Granted Full applications Demolition 16 docsSmall domestic -
16-18 The Square, Ballygowan, BT23 6HU
Discharge of Conditions 2, 5 and 6 of previously approved application LA06/2018/0541/F - Discharge of Condition 2 which states - The vehicular access, including visibility splays and any forward sight distance, shall be provided in accordance with Drawing No.05C bearing the date stamp 6th October 2020, prior to the commencement of any other development hereby permitted. The area within the visibility splays and any forward sight line shall be cleared to provide a level surface no higher than 250mm above the level of the adjoining carriageway and such splays shall be retained and kept clear thereafter. Reason: To ensure there is a satisfactory means of access in the interests of road safety and the convenience of road users. Discharge of Condition 5 which states:- No development shall take place on-site until either the Waste Water Treatment Works at Ballygowan has been upgraded and becomes fully operational, in line with planning permission LA06/2018/1213/F, and it has been agreed with NI Water in writing that there is available capacity to serve the approved apartments or alternatively, a Consent to discharge for the private treatment plant has been granted in writing under the terms of the Water (NI) Order 1999. Reason: To ensure protection of the aquatic environment and to help the applicant avoid incurring unnecessary expense before it can be ascertained that a feasible method of sewage disposal is possible at this site. Discharge of Condition 6 which states:- Prior to any works commencing on site, a final Construction Environmental Management Plan and finalised Site Drainage Plan shall be submitted by the applicant/approved contractor to the Council for agreement in writing. This shall reflect and detail all the pollution prevention, mitigation and avoidance measures as outlined within the Outline Construction Environmental Management Plan (date stamped 24th May 2019) and all additional submitted information. All measures agreed in the final Construction Environmental Management Plan and finalised Site Drainage Plan shall be implemented as approved. Reason: To ensure that the appointed contractor is aware of and implements the appropriate environmental mitigation during construction phase that will protect the hydrologically connected European Site features.
Granted Conditions New dwelling 15 docs
Other full applications
In Ards and North Down
-
LA06/2026/0762/F Granted
64 Princess Gardens, Holywood, BT18 0PW
Single-storey extension to side (demolition of garage)
-
LA06/2026/0302/F Granted
87 Station Road, Holywood, BT18 0BP
Internal and external alterations, conversion of garage, and retrospective ancillary outbuilding (Amended Description and Additional Plans)
-
LA06/2026/0749/F Granted
15 Lochinver Avenue,Holywood, BT18 0NQ
Conversion of garage to ancillary accommodation (including new door/windows)
-
LA06/2026/0730/F Granted
20 Bailie Road, Bangor, BT19 7QW
1.5-storey rear extension to dwelling; new front porch
-
LA06/2026/0789/F Granted
26 Holymount Road Newtownards BT23 7DL
Single-storey rear extension