Planning application
Land To The East Of Alwalton Hill Fletton Parkway Peterborough
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Landscaping of plot OS5 including attenuation pond, surface water pumping station and surface water rising main
As published by the council, reference 12/00877/REM
Application record
- Reference
- 12/00877/REM
- Type
- Planning Application (Reserved Matters)
- Status
- Decided
- Decision
- Permitted
- Received
- 14 Jun 2012
- Validated
- 14 Jun 2012
- Decided
- 21 Dec 2012
- Ward
- Orton With Hampton
- Parish
- Peterborough
- Decision by
- Delegated Decision (Officer)
Site history
Applications at this address on the Peterborough register
This site has had 24 applications since 2009: 10 approved, 0 refused.
-
22/01169/MDOBL Granted
Land To The East Of Alwalton Hill Fletton Parkway Peterborough
Modifications to the Great Haddon S106 Agreement associated with 15/01672/WCPP
-
19/01651/NONMAT Decided
Land To The East Of Alwalton Hill Fletton Parkway Peterborough
Non material amendment ( additional process specific external plan and external storage) to planning permission 17/01759/REM
-
12/01334/WCPP Granted
Land To The East Of Alwalton Hill Fletton Parkway Peterborough
Variation of condition 5 of outline planning permission 09/01369/OUT to allow a higher building (not exceeding 35m) to be built on plot E2.1 to meet the requirements of an occupier. The first sentence of condition 5 would read - Building heights shall not exceed a maximum height of 15 m except on plot E7 where the maximum height shall not exceed 17 m and on plot E2.1 where the maximum height shall not exceed 35 m
-
12/01309/FUL Granted
Land To The East Of Alwalton Hill Fletton Parkway Peterborough
Temporary drainage works
-
12/01213/REM Granted
Land To The East Of Alwalton Hill Fletton Parkway Peterborough
Construction of access road, south part, with attenuation pond
-
12/00984/DISCHG Decided
Land To The East Of Alwalton Hill Fletton Parkway Peterborough
Discharge of conditions C4 (Drainage) and C7 (Arboricultural impacts) of Planning Permission 11/02049/REM (Construction of initial section of the internal access road from Junction 1 of the Fletton Parkway)
-
12/00957/DISCHG Decided
Land To The East Of Alwalton Hill Fletton Parkway Peterborough
Discharge of condition 14 (updated survey work) of planning permission 09/01369/OUT - Development of up to 65 hectares of employment land (B1, B2 and B8 including safeguarding of a site for a household recycling centre/park and ride). Associated highway infrastructure (including pedestrian, bridleway and cycle routes), and car parking for all uses. Foul and surface water drainage networks (including SuDS and lakes)
-
12/00860/REM Granted
Land To The East Of Alwalton Hill Fletton Parkway Peterborough
Construction of a primary electricity supply station and foul water pumping station
-
12/00557/NONMAT Decided
Land To The East Of Alwalton Hill Fletton Parkway Peterborough
Non-material amendment to planning permission 09/01369/OUT - Development of up to 65 hectares of employment land (B1, B2 and B8 including safeguarding of a site for a household recycling centre/park and ride). Associated highway infrastructure (including pedestrian, bridleway and cycle routes), and car parking for all uses. Foul and surface water drainage networks (including SuDS and lakes)
-
12/00258/DISCHG Decided
Land To The East Of Alwalton Hill Fletton Parkway Peterborough
Discharge of condition 8 (Drainage) of Planning Permission 09/01369/OUT - (Development of up to 65 hectares of employment land (B1, B2 and B8 including safeguarding of a site for a household recycling centre/park and ride). Associated highway infrastructure (including pedestrian, bridleway and cycle routes), and car parking for all uses. Foul and surface water drainage networks (including SuDS and lakes))
Timeline
Dates from the published record
-
14 Jun 2012
Received by Peterborough
-
21 Dec 2012
Decision issued: Permitted
-
23 Jul 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
43 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat this grant of permission means
Peterborough granted permission on 21 December 2012, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About reserved matters applications
A reserved matters application fills in the detail held back from an earlier outline permission, judged against that permission rather than the principle of development. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
Land To The East Of Alwalton Hill Fletton Parkway Peterborough
Temporary drainage works
Granted Full applications 16 docs -
Land To The East Of Alwalton Hill Fletton Parkway Peterborough
Construction of a primary electricity supply station and foul water pumping station
Granted Reserved matters 22 docs -
Land To The East Of Alwalton Hill Fletton Parkway Peterborough
Landscaping of plot OS2
Granted Reserved matters 32 docs -
Land To The East Of Alwalton Hill Fletton Parkway Peterborough
Discharge of conditions C11 (Great Crested Newt Stategy) and C12 (Biodiversity Strategy) of planning permission 09/01369/OUT - Development of up to 65 hectares of employment land (B1, B2 and B8 including safeguarding of a site for a household recycling centre/park and ride). Associated highway infrastructure (including pedestrian, bridleway and cycle routes), and car parking for all uses. Foul and surface water drainage networks (including SuDS and lakes)
Decided Conditions 6 docs -
Land To The East Of Alwalton Hill Fletton Parkway Peterborough
Development of up to 65 hectares of employment land (B1, B2 and B8 including safeguarding of a site for a household recycling centre/park and ride). Associated highway infrastructure (including pedestrian, bridleway and cycle routes), and car parking for all uses. Foul and surface water drainage networks (including SuDS and lakes)
Granted Outline 236 docs -
Land To The East Of Alwalton Hill Fletton Parkway Peterborough
Discharge of conditions 28(construction management plan) and 33(archaeological investigation) of planning permission 09/01369/OUT - Development of up to 65 hectares of employment land (B1, B2 and B8 including safeguarding of a site for a household recycling centre/park and ride). Associated highway infrastructure (including pedestrian, bridleway and cycle routes), and car parking for all uses. Foul and surface water drainage networks (including SuDS and lakes)
Decided Conditions 9 docs
Other reserved matters applications
In Peterborough
-
26/002736/REM Status unknown
Land Off Newborough Road, North of A47 And West Of A16 Paston Peterborough, PE4 7AA
Application for the approval of reserved matters for appearance, landscaping, la
-
26/002513/REM Status unknown
Land Adjacent to 4, Lewes Gardens, Peterborough, PE4 6QN
23/00598/OUT - Reserved matters consent (appearance, landscaping, layout and sca
-
25/01457/REM Granted
Phase 4 M Land Land To The North Of Norman Cross London Road Peterborough
Reserved matters approval (appearance, access, landscaping, layout and scale) for the erection of 172 dwellings and associated infrastructure for Phase 4 of M-Land pursuant to outline planning permission 09/01368/OUT
-
26/002366/REM Awaiting decision
Parcel R02, Hampton Beach, London Road, Peterborough, PE7 0LG
Reserved matters approval relating to access, scale appearance, layout and landscaping for 309 Dwelling pursuant to outline permission 91/P0556 (as varied by 04/01927/WCPP) and in relation to reserved matters approval 23/01642/REM
-
25/01214/REM Granted
46 St Pegas Road Peakirk Peterborough PE6 7NF
Reserved matters approval (appearance and landscaping) pursuant to outline plann