Proposed Sizewell C Sizewell Power Station Road Sizewell Leiston Suffolk
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Bespoke Mitigation Plan (Noise and Vibration) - Sizewell Link Road Main Works (AD BMP 16), secured by the Noise Monitoring and Management Plan under Requirement 2 (Code of Construction Practice) of the Sizewell C Development Consent Order
As published by the council, reference DC/25/2644/DRR28
Application record
- Reference
- DC/25/2644/DRR28
- Type
- Discharge of Requirements (28 days)
- Status
- Permitted
- Decision
- Application Permitted
- Received
- 3 Jul 2025
- Validated
- 3 Jul 2025
- Decided
- 7 Aug 2025
- Ward
- Aldeburgh And Leiston
- Parish
- Leiston Cum Sizewell
- Decision by
- Delegated Decision
Site history
Applications at this address on the East Suffolk register
This site has had 13 applications since 2024: 10 approved, 0 refused.
-
DC/26/2639/DRR42 Granted
Proposed Sizewell C Sizewell Power Station Road Sizewell Leiston Suffolk
Discharge of Requirements (42 days) - Discharge of Requirement 9 (Main development site: Site clearance) of the Sizewell C Development Consent Order
-
DC/26/2576/DRR Awaiting decision
Proposed Sizewell C Sizewell Power Station Road Sizewell Leiston Suffolk
Discharge of Requirement 19 (Main development site: Marine infrastructure) - Temporary Hard Coastal Defence Feature (part of Work No. 1A(n)) of the Sizewell C Development Consent Order
-
DC/26/1777/DRR28 Awaiting decision
Proposed Sizewell C Sizewell Power Station Road Sizewell Leiston Suffolk
Bespoke Mitigation Plan (Noise and Vibration) Temporary Construction Area (MDS BMP 7), secured by the Noise Monitoring and Management Plan under Requirement 2 (Code of Construction Practice) of the Sizewell C Development Consent Order
-
DC/26/0327/CON Granted
Proposed Sizewell C Sizewell Power Station Road Sizewell Leiston Suffolk
Consultation - Nearshore Infrastrcuture Pre-Installation Bathymetry
-
DC/26/0158/CON Granted
Proposed Sizewell C Sizewell Power Station Road Sizewell Leiston Suffolk
MMO Consultation - Deemed Marine Licence condition 14(3) - Sizewell C CPMMP Notification: TMBIF Pre-installation Topography Monitoring Report
-
DC/25/4721/DRR42 Awaiting decision
Proposed Sizewell C Sizewell Power Station Road Sizewell Leiston Suffolk
Discharge of Requirement 31 (Rail infrastructure) - Green Rail Route of the Sizewell C Development Consent Order
-
DC/25/4674/CON Granted
Proposed Sizewell C Sizewell Power Station Road Sizewell Leiston Suffolk
Consultation - Condition Coastal Processes Monitoring and Mitigation Plan monitoring reports - DML condition 14(3)
-
DC/25/4388/DRR Granted
Proposed Sizewell C Sizewell Power Station Road Sizewell Leiston Suffolk
Requirement 21 (Main Development Site: Sizewell Marshes SSSI Method Statement) of the Sizewell C Development Consent Order
-
DC/25/4283/CCC Granted
Proposed Sizewell C Sizewell Power Station Road Sizewell Leiston Suffolk
County Council Consultation - Discharge of Requirement 10 project wide: Public Rights Of Way implementation plan for coast path (MBIF) in respect of SZC Co. Sizewell C Nuclear Power Station
-
DC/25/2407/DRR Granted
Proposed Sizewell C Sizewell Power Station Road Sizewell Leiston Suffolk
Development Consent Order Requirement 21 - Main development site: Sizewell Marshes SSSI Method Statements (Partial Discharge, Methodology for SSSI Southern Abutment) of the Sizewell C Development Consent Order
Timeline
Dates from the published record
-
3 Jul 2025
Received by East Suffolk
-
7 Aug 2025
Decision issued: Application Permitted
-
2 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
5 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat this grant of permission means
East Suffolk granted permission on 7 August 2025, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About condition discharge and variation applications
This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
Sizewell Link Road Proposed Sizewell C Sizewell Power Station Road Sizewell Leiston Suffolk
99% historically approved · decision due ~6 May
Discharge of Requirement 32 (Associated development sites: Site clearance) - Sizewell Link Road (Work No. 12) of the Sizewell C Development Consent Order
Awaiting decision Conditions 5 docs -
Overhead Line Upgrade Trust Farm Leiston Road Middleton Saxmundham Suffolk
Other Consultation - Overhead Line Upgrade to three wire and installation of a new Pad mount Transformer
Granted Outline 4 docs
Other condition discharge and variation applications
In East Suffolk
-
DC/26/1893/DRC Granted
The Workshop Brick Kiln Lane Melton Woodbridge Suffolk IP12 2PB
Discharge of conditions 7 and 10 of DC/23/2365/FUL - Demolition of existing workshop buildings, erection of replacement workshop, authorisation of existing workshop extensions, associated works. - Condition 7 - Construction Management Plan; Condition 10 - Noise Management Plan
-
DC/26/2573/DRC Granted
North Suffolk Skills Academy Harrisons Lane Halesworth Suffolk IP19 8PY
Discharge of condition Nos. 14, 19 & 26 of DC/21/0007/FUL - Change of use to sports facilities comprising new grass football pitch adjacent to Harrisons Lane and construction of a new artificial football pitch with associated parking, access, lighting, acoustic fencing and drainage adjacent to the Apollo Youth Centre and adjacent field to the south. - 14 - Construction Mngt Plan, 19 - Construction and Phasing Plan and 26 - Surface Water
-
DC/26/2736/DRC Granted
Land Adj School Road Church Road Ringsfield Suffolk
Discharge of Condition No. 10 of DC/25/3030/VOC - Variation of Condition No. 2 of DC/17/2934/VOC - Construction of 10 No.Holiday Lodges, 1 No. retail unit and 1 No. self contained flat. This application is seeking modification to the appearance and layout of the originally approved lodges - discharge of surface water
-
DC/26/3165/DRC Awaiting decision
Timber Mill Barns Sizewell Hall Road Leiston Suffolk IP16 4TT
Discharge of Condition Nos. 18, 21 and 23 of DC/25/1355/FUL - Alterations to the existing structure & external envelope as part of the formation of two residential dwellings from agricultural barn - 18. Construction Method Statement 21. Emergency Demolition/Construction Manangement Plan 23. Radiation Emergency Contingency Plan.
-
DC/26/3167/DRC Awaiting decision