Skip to content
PlanIndex Get alerts
Menu

Planning application

45 Beech Street London EC2Y 8AD

Granted City of London 24/00176/FULL Full Planning Permission

Works: Extension Demolition

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Partial demolition, extension and change of use of existing office building to co-living accommodation with associated internal and external amenity spaces (sui generis) including cycle storage, landscaping, servicing and all other associated works.

As published by the council, reference 24/00176/FULL

Application record

Reference
24/00176/FULL
Type
Full Planning Permission
Status
Decided
Decision
Granted As published: Approved
Received
19 Feb 2024
Validated
19 Feb 2024
Decided
8 Dec 2025
Ward
Aldersgate
Decision by
Delegated
Postcode
EC2Y 8AD

Site history

Applications at this address on the City of London register

This site has had 7 applications since 2021: 5 approved, 0 refused.

  • 26/01457/MDC Awaiting decision

    45 Beech Street London EC2Y 8AD

    Submission of lift details pursuant to discharge of condition 8 of planning permission 24/00176/FULL dated 08.12.2025.

    Submitted 14 Oct 2026
  • 26/01391/PODC Granted

    45 Beech Street London EC2Y 8AD

    Submission of the Local Procurement Strategy and Local Training Skills and Job Brokerage Strategy pursuant to Schedule 3 Paragraph 2.1.1 and Schedule 3 Paragraph 3.2 respectively of the S106 Agreement dated 08 December 2025 (Planning Application Reference: 24/00176/FULL).

    Decided 8 Oct 2026
  • 26/00926/NMA Awaiting decision

    45 Beech Street London EC2Y 8AD

    Non-material amendment under Section 96A of the Town Planning and Country Act 1990 to planning permission reference 24/00176/FULL dated 8 December 2025 to amend Condition 46 (approved drawings) to allow amendments to: internal layouts and communal amenity spaces; entrance and access arrangements; stair and lift cores; co-living unit layouts; roof plant and associated roofscape detailing; façade materials and architectural detailing; and associated alterations to the approved elevations.

    Submitted 30 Jun 2026 Amendments
  • 26/00910/MDC Granted

    45 Beech Street London EC2Y 8AD

    Submission of details of (i) design and layout drawings for the proposed SuDS components (ii) measures to be taken to prevent flooding (iii) Evidence that Thames Water has been consulted regarding the proposed surface water pursuant to condition 3 of Planning Permission 24/00176/FULL dated 08.12.2025.

    Decided 11 Sep 2026
  • 26/00825/MDC Granted

    45 Beech Street London EC2Y 8AD

    Submission of detail of Scheme of Protective Works, Site Condition Survey, NRMM Registration, Demolition and Construction Logistics Plan, and Protection of Water infrastructure pursuant to condition 2, 4, 5, 6 and 7 of Planning Permission 24/00176/FULL dated 08.12.2025.

    Decided 18 Sep 2026
  • 21/00561/DPAR Granted

    45 Beech Street London EC2Y 8AD

    Application under Schedule 2, Part 16, Class A of the Town and Country Planning (General Permitted Development) Order 2015 as to whether prior approval is required for the upgrade of an existing telecommunications base station, comprising of the mounting of 3 no. existing antennas and removal and replacement of 3 no. antennas on 3 no. replacement antenna support poles (2 no. 6m tall poles to a height of 32.5m and 1 no. 5.2m tall pole to a height of 32.0m), supporting 4 no. antennas at 32.5m to top and 2 no. antennas at 30.0m to top and mounting of a GPS module on the top of one of the support poles; the siting of one new rooftop cabinet and relocation of 1 no. existing rooftop cabinet and ancillary works.

    Decided 24 Aug 2021 Outline

Timeline

Dates from the published record

  1. 19 Feb 2024

    Received by City of London

  2. 8 Dec 2025

    Decision issued: Approved

  3. 25 Jul 2026

    Added to PlanIndex

Cases linked to this one on the register

5 later applications on the register refer to this one:

  • 26/01457/MDC Awaiting decision

    45 Beech Street London EC2Y 8AD

    Submission of lift details pursuant to discharge of condition 8 of planning permission 24/00176/FULL dated 08.12.2025.

    Submitted 14 Oct 2026
  • 26/01391/PODC Granted

    45 Beech Street London EC2Y 8AD

    Submission of the Local Procurement Strategy and Local Training Skills and Job Brokerage Strategy pursuant to Schedule 3 Paragraph 2.1.1 and Schedule 3 Paragraph 3.2 respectively of the S106 Agreement dated 08 December 2025 (Planning Application Reference: 24/00176/FULL).

    Decided 8 Oct 2026
  • 26/00926/NMA Awaiting decision

    45 Beech Street London EC2Y 8AD

    Non-material amendment under Section 96A of the Town Planning and Country Act 1990 to planning permission reference 24/00176/FULL dated 8 December 2025 to amend Condition 46 (approved drawings) to allow amendments to: internal layouts and communal amenity spaces; entrance and access arrangements; stair and lift cores; co-living unit layouts; roof plant and associated roofscape detailing; façade materials and architectural detailing; and associated alterations to the approved elevations.

    Submitted 30 Jun 2026 Amendments
  • 26/00910/MDC Granted

    45 Beech Street London EC2Y 8AD

    Submission of details of (i) design and layout drawings for the proposed SuDS components (ii) measures to be taken to prevent flooding (iii) Evidence that Thames Water has been consulted regarding the proposed surface water pursuant to condition 3 of Planning Permission 24/00176/FULL dated 08.12.2025.

    Decided 11 Sep 2026
  • 26/00825/MDC Granted

    45 Beech Street London EC2Y 8AD

    Submission of detail of Scheme of Protective Works, Site Condition Survey, NRMM Registration, Demolition and Construction Logistics Plan, and Protection of Water infrastructure pursuant to condition 2, 4, 5, 6 and 7 of Planning Permission 24/00176/FULL dated 08.12.2025.

    Decided 18 Sep 2026

Who's behind it

Company information only, from the register and Companies House

DP9 Ltd Agent

Active · incorporated 2004

2,662 applications on PlanIndex · across 36 councils · 98% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Beech Street (London) LLP Applicant, registered in London

Active · incorporated 2023 · London

1 application on PlanIndex

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

188 documents on file for this application

  • COVER LETTER Cover Letter · 07 Jul 2026
  • GROUND GA LANDSCAPE PLAN Drawing · 07 Jul 2026
  • DRAWING REGISTER AND ISSUE SHEET Drawings Schedule · 07 Jul 2026
  • LEVELS 08 & 09 GA LANDSCAPE PLAN Drawings Schedule · 07 Jul 2026
  • LEVEL 8&9 TERRACE PLANTING PLAN AND SCHEDULE Drawings Schedule · 07 Jul 2026
  • S106 AGREEMENT S106 Agreement · 08 Dec 2025
  • PLANNING PERMISSION FOR DEVELOPMENT (CONDITIONAL) Decision · 08 Dec 2025
  • DRAFT S106 AGREEMENT S106 Agreement · 17 Oct 2025
  • REPRESENTATION-FRED RODGERS Public Comment · 17 Sep 2024
  • REPRESENTATION - FRED RODGERS Public Comment · 31 Aug 2024
  • BAT SURVEY REPORT Accompanying report · 30 Aug 2024
  • TECHNICAL NOTE ON DAYLIGHT AND SUNLIGHT Other · 30 Aug 2024
  • CARBON OPTIONEERING SUPPORTING NOTE Other · 29 Aug 2024
  • SPREADSHEET - WHOLE LIFE-CYCLE CARBON OPTIONS OUTPUTS Other · 29 Aug 2024
  • DASHBOARD 1 (TABLE A): CARBON OPTIONS TABLE Other · 29 Aug 2024
  • SITE CONTEXT - EXISTING BUILDING CONSIDERATIONS Photograph · 29 Aug 2024
  • ENERGY PERFORMANCE CERTIFICATE ? NON-DOMESTIC BUILDING Other · 29 Aug 2024
  • ENERGY TECHNICAL NOTE Other · 29 Aug 2024
  • BASEMENT PLANT ROOMS LAYOUT Drawing · 29 Aug 2024
  • COMMENTS - THE GARDENS TRUST Consultee Comment · 22 Aug 2024
  • PUBLIC REALM PLAN Drawing · 21 Aug 2024
  • COURTYARD PLAN Drawing · 21 Aug 2024
  • WEST ELEVATION - EXISTING Drawing · 21 Aug 2024
  • SOUTH ELEVATION - PROPOSED Drawing · 21 Aug 2024
  • SECTION CC - PROPOSED Drawing · 21 Aug 2024
  • SECTION DD - PROPOSED Drawing · 21 Aug 2024
  • SECTION EE - PROPOSED Drawing · 21 Aug 2024
  • EAST ELEVATION - PROPOSED Drawing · 21 Aug 2024
  • TYPICAL LEVEL 03-05 FLOOR PLAN - PROPOSED Drawing · 21 Aug 2024
  • CITY OF LONDON SUICIDE PREVENTION GUIDANCE - SUPPLEMENTARY INFORMATION Accompanying report · 21 Aug 2024
  • REVIEW OF 'PAYMENT IN LIEU OF AFFORDABLE' SUBMISSION BY DS2 Accompanying report · 21 Aug 2024
  • SPREADSHEET - WLC REVIEW 2 - 28 JUNE 2024 Other · 21 Aug 2024
  • BAT EMERGENCE AND ENDOSCOPING SURVEY INTERIM REPORT Accompanying report · 21 Aug 2024
  • KEY PLAN - ROOF LEVEL Drawing · 21 Aug 2024
  • WEST ELEVATION - DEMOLITION Drawing · 21 Aug 2024
  • NORTH ELEVATION - PROPOSED Drawing · 21 Aug 2024
  • SECTION BB - PROPOSED Drawing · 21 Aug 2024
  • CORE PLAN LAYOUT - TYPICAL LEVEL Drawing · 21 Aug 2024
  • REVIEW OF 'VIABILITY REPORT' Accompanying report · 21 Aug 2024
  • LETTER - RESPONSE TO BNPP Correspondence In · 21 Aug 2024
  • ROOF TERRACE PLAN Drawing · 21 Aug 2024
  • PLANTING PLAN Drawing · 21 Aug 2024
  • TYPICAL LEVEL 02 FLOOR PLAN - PROPOSED Drawing · 21 Aug 2024
  • ROOF PLAN - PROPOSED Drawing · 21 Aug 2024
  • REVIEW OF DAYLIGHT AND SUNLIGHT ASSESSMENTS Accompanying report · 21 Aug 2024
  • RESPONSE TO DS2 FURTHER SUBMISSION Accompanying report · 21 Aug 2024
  • GROUND FLOOR PLAN - PROPOSED Drawing · 20 Aug 2024
  • DESIGN AND ACCESS STATEMENT ADDENDUM #2 Report - Design & Access Statement/Report · 20 Aug 2024
  • REPRESENTATION - BEN JONSON HOUSE GROUP COMMITTEE (2) Public Comment · 20 Aug 2024
  • REPRESENTATION - STEPHEN CHAPMAN Public Comment · 20 Aug 2024
  • TS ADDENDUM Accompanying report · 20 Aug 2024
  • REPRESENTATION - BEN JONSON HOUSE GROUP COMMITTEE (1) Public Comment · 20 Aug 2024
  • REPRESENTATION - HELENA TWIST Public Comment · 19 Aug 2024
  • REPRESENTATION - CHRISTOPHER GADSDEN Public Comment · 13 Aug 2024
  • REPRESENTATION - MARGARET H GADSDEN Public Comment · 12 Aug 2024
  • WEST ELEVATION - PROPOSED Drawing · 05 Jul 2024
  • SWEPT PATH ANALYSIS LARGE CAR Drawing · 05 Jul 2024
  • SCHEDULE OF PROPOSED DRAWINGS Drawings Schedule · 05 Jul 2024
  • COURTYARD NORTH ELEVATION - PROPOSED Drawing · 05 Jul 2024
  • REPRESENTATION - FRED RODGERS 2ND REP Public Comment · 06 Jun 2024
  • APPLICANT RESPONSE TO OFFICERS RE: FIRE AND ECOLOGY Accompanying report · 17 Apr 2024
  • COMMENTS - BARBICAN AND GOLDEN NEIGHBOURHOOD FORUM Consultee Comment · 02 Apr 2024
  • REPRESENTATION - GABY ROBERTSHAW Public Comment · 01 Apr 2024
  • REPRESENTATION - STEPHEN CHAPMAN Public Comment · 29 Mar 2024
  • REPRESENTATION - BEN JONSON HOUSE GROUP COMMITTEE Public Comment · 29 Mar 2024
  • COMMENTS - BARBICAN ASSOCIATION Consultee Comment · 28 Mar 2024
  • REPRESENTATION - MARY GILCHRIST Public Comment · 26 Mar 2024
  • REPRESENTATION-HELEN SACHS Public Comment · 26 Mar 2024
  • COMMENTS-HEALTH AND SAFETY EXECUTIVE Consultee Comment · 25 Mar 2024
  • REPRESENTATION-MR JEFF HENNESSEY Public Comment · 25 Mar 2024
  • REPRESENTATION-DR.ALEXANDER WILSON Public Comment · 25 Mar 2024
  • COMMENTS - THAMES WATER (MEMO) Consultee Comment · 21 Mar 2024
  • COMMENTS - THAMES WATER (EMAIL) Consultee Comment · 21 Mar 2024
  • FIRE STATEMENT Accompanying report · 14 Mar 2024
  • COMMENTS - HSE Consultee Comment · 05 Mar 2024
  • REPRESENTATION - FRED RODGERS Public Comment · 05 Mar 2024
  • COMMENTS - HISTORIC ENGLAND Consultee Comment · 29 Feb 2024
  • OPERATIONAL MANAGEMENT PLAN_REVISED Accompanying report · 23 Feb 2024
  • LEVEL 3 FLOOR PLAN EXISTING Drawing · 19 Feb 2024
  • LEVEL 4 FLOOR PLAN EXISTING Drawing · 19 Feb 2024
  • LEVEL 5 FLOOR PLAN EXISTING Drawing · 19 Feb 2024
  • LEVEL 6 FLOOR PLAN EXISTING Drawing · 19 Feb 2024
  • LEVEL 7 FLOOR PLAN EXISTING Drawing · 19 Feb 2024
  • BASEMENT FLOOR PLAN EXISTING Drawing · 19 Feb 2024
  • GROUND FLOOR PLAN EXISTING Drawing · 19 Feb 2024
  • ROOF PLAN EXISTING Drawing · 19 Feb 2024
  • SOUTH ELEVATION EXISTING Drawing · 19 Feb 2024
  • EAST ELEVATION EXISTING Drawing · 19 Feb 2024
  • NORTH ELEVATION EXISTING Drawing · 19 Feb 2024
  • SECTION AA - EXISTING Drawing · 19 Feb 2024
  • SECTION BB - EXISTING Drawing · 19 Feb 2024
  • LEVEL 1 FLOOR PLAN DEMOLITION Drawing · 19 Feb 2024
  • LEVEL 2 FLOOR PLAN DEMOLITION Drawing · 19 Feb 2024
  • LEVEL 3 FLOOR PLAN DEMOLITION Drawing · 19 Feb 2024
  • LEVEL 4 FLOOR PLAN DEMOLITION Drawing · 19 Feb 2024
  • LEVEL 5 FLOOR PLAN DEMOLITION Drawing · 19 Feb 2024
  • LEVEL 6 FLOOR PLAN EXISTING Drawing · 19 Feb 2024
  • LEVEL 7 FLOOR PLAN DEMOLITION Drawing · 19 Feb 2024
  • BASEMENT FLOOR PLAN DEMOLITION Drawing · 19 Feb 2024
  • GROUND FLOOR PLAN DEMOLITION Drawing · 19 Feb 2024
  • ROOF PLAN DEMOLITION Drawing · 19 Feb 2024
  • SOUTH ELEVATION DEMOLITION Drawing · 19 Feb 2024
  • EAST ELEVATION DEMOLITION Drawing · 19 Feb 2024
  • NORTH ELEVATION DEMOLITION Drawing · 19 Feb 2024
  • SECTION AA - DEMOLITION Drawing · 19 Feb 2024
  • SECTION BB - DEMOLITION Drawing · 19 Feb 2024
  • BAY STUDY 01 - BASE Drawing · 19 Feb 2024
  • BAY STUDY 02 - TOP Drawing · 19 Feb 2024
  • WEST ELEVATION PROPOSED Drawing · 19 Feb 2024
  • LEVEL 1 FLOOR PLAN PROPOSED Drawing · 19 Feb 2024
  • LEVEL 8 FLOOR PLAN PROPOSED Drawing · 19 Feb 2024
  • LEVEL 9 FLOOR PLAN PROPOSED Drawing · 19 Feb 2024
  • BASEMENT FLOOR PLAN PROPOSED Drawing · 19 Feb 2024
  • M4(3) ACCESSIBLE UNIT LAYOUT TYPE 02 Drawing · 19 Feb 2024
  • DAS PART1OF10 Report - Design & Access Statement/Report · 19 Feb 2024
  • DAS PART2OF10 Report - Design & Access Statement/Report · 19 Feb 2024
  • DAS PART3OF10 Report - Design & Access Statement/Report · 19 Feb 2024
  • DAS PART4OF10 Report - Design & Access Statement/Report · 19 Feb 2024
  • DAS PART5OF10 Report - Design & Access Statement/Report · 19 Feb 2024
  • DAS PART6OF10 Report - Design & Access Statement/Report · 19 Feb 2024
  • DAS PART7OF10 Report - Design & Access Statement/Report · 19 Feb 2024
  • DAS PART8OF10 Report - Design & Access Statement/Report · 19 Feb 2024
  • DAS PART9OF10 Report - Design & Access Statement/Report · 19 Feb 2024
  • DAS PART10OF10 Report - Design & Access Statement/Report · 19 Feb 2024
  • ENERGY STRATEGY PART2OF2 Accompanying report · 19 Feb 2024
  • ENERGY STRATEGY PART1OF2 Accompanying report · 19 Feb 2024
  • CIRCULAR ECONOMY STATEMENT Accompanying report · 19 Feb 2024
  • SUPERSEDED OPERATIONAL MANAGEMENT PLAN Accompanying report · 19 Feb 2024
  • FVA PART1OF3 Accompanying report · 19 Feb 2024
  • FVA PART2OF3 Accompanying report · 19 Feb 2024
  • FVA PART3OF3 Accompanying report · 19 Feb 2024
  • SUSTAINABLE DESIGN AND CONSTRUCTION STATEMENT Accompanying report · 19 Feb 2024
  • WLCA REPORT Accompanying report · 19 Feb 2024
  • DAYLIGHT AND SUNLIGHT REPORT INTERNAL1 Accompanying report · 19 Feb 2024
  • DAYLIGHT AND SUNLIGHT REPORT1 Report - Daylight/Sunlight Report · 19 Feb 2024
  • APPLICATIONFORMREDACTED Application Form · 19 Feb 2024
  • COVER LETTER - APPLICATION Cover Letter · 19 Feb 2024
  • CIL FORM Other · 19 Feb 2024
  • 45 BEECH STREET PLANNING STATEMENT Report - Planning Statement/Report · 19 Feb 2024
  • BLOCK PLAN - EXISTING Site Plan · 19 Feb 2024
  • SITE PLAN Site Plan · 19 Feb 2024
  • SITE PLAN Site Plan · 19 Feb 2024
  • SITE PLAN Site Plan · 19 Feb 2024
  • LEVEL 1 FLOOR PLAN EXISTING Drawing · 19 Feb 2024
  • LEVEL 2 FLOOR PLAN EXISTING Drawing · 19 Feb 2024
  • FLOOD RISK ASSESSMENT PART2OF3 Accompanying report · 19 Feb 2024
  • FLOOD RISK ASSESSMENT PART3OF3 Accompanying report · 19 Feb 2024
  • HTVIA_PART1OF15 Accompanying report · 19 Feb 2024
  • HTVIA_PART2OF15 Accompanying report · 19 Feb 2024
  • HTVIA_PART3OF15 Accompanying report · 19 Feb 2024
  • HTVIA_PART4OF15 Accompanying report · 19 Feb 2024
  • HTVIA_PART5OF15 Accompanying report · 19 Feb 2024
  • HTVIA_PART9OF15 Accompanying report · 19 Feb 2024
  • HTVIA_PART10OF15 Accompanying report · 19 Feb 2024
  • HTVIA_PART6OF15 Accompanying report · 19 Feb 2024
  • HTVIA_PART7OF15 Accompanying report · 19 Feb 2024
  • HTVIA_PART11OF15 Accompanying report · 19 Feb 2024
  • PEA AND BNG REPORT_PART3OF3 Accompanying report · 19 Feb 2024
  • DRAINAGE STRATEGY REPORT_PART2OF4 Accompanying report · 19 Feb 2024
  • PROPOSED TYPICAL LEVEL 06-07 FLOOR PLAN Drawing · 19 Feb 2024
  • SECTION AA - PROPOSED Drawing · 19 Feb 2024
  • M4(2) UNIT LAYOUT TYPE 01 AND TYPE 02 Drawing · 19 Feb 2024
  • M4(2) UNIT LAYOUT TYPE 03 Drawing · 19 Feb 2024
  • M4(2) UNIT LAYOUT TYPE 04 AND TYPE 05 Drawing · 19 Feb 2024
  • M4(2) UNIT LAYOUT TYPE 06 Drawing · 19 Feb 2024
  • M4(3) ACCESSIBLE UNIT LAYOUT TYPE 01 Drawing · 19 Feb 2024
  • HTVIA_PART8OF15 Accompanying report · 19 Feb 2024
  • HTVIA_PART15OF15 Accompanying report · 19 Feb 2024
  • HTVIA_PART12OF15 Accompanying report · 19 Feb 2024
  • PEA AND BNG REPORT_PART1OF3 Accompanying report · 19 Feb 2024
  • PEA AND BNG REPORT_PART2OF3 Accompanying report · 19 Feb 2024
  • TRANSPORT STATEMENT PART1OF3 Report - Transport Statement/Report · 19 Feb 2024
  • TRANSPORT STATEMENT PART2OF3 Report - Transport Statement/Report · 19 Feb 2024
  • TRANSPORT STATEMENT PART3OF3 Report - Transport Statement/Report · 19 Feb 2024
  • INTERIM TRAVEL PLAN Report - Travel Plan · 19 Feb 2024
  • DRAFT DELIVERY AND SERVICE PLAN Accompanying report · 19 Feb 2024
  • OUTLINE CONSTRUCTION LOGISTICS PLAN Accompanying report · 19 Feb 2024
  • AIR QUALITY ASSESSMENT Accompanying report · 19 Feb 2024
  • NOISE AND VIBRATION IMPACT ASSESSMENT Report - Acoustic/Noise Report · 19 Feb 2024
  • STATEMENT OF COMMUNITY INVOLVEMENT Accompanying report · 19 Feb 2024
  • FLOOD RISK ASSESSMENT PART1OF3 Accompanying report · 19 Feb 2024
  • HTVIA_PART13OF15 Accompanying report · 19 Feb 2024
  • HTVIA_PART14OF15 Accompanying report · 19 Feb 2024
  • DRAINAGE STRATEGY REPORT_PART1OF4 Accompanying report · 19 Feb 2024
  • DRAINAGE STRATEGY REPORT_PART3OF4 Accompanying report · 19 Feb 2024
  • DRAINAGE STRATEGY REPORT_PART4OF4 Accompanying report · 19 Feb 2024
  • FIRE STATEMENT (LONDON PLAN)_PART1OF2 Accompanying report · 19 Feb 2024
  • FIRE STATEMENT (LONDON PLAN)_PART2OF2 Accompanying report · 19 Feb 2024

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

City of London granted permission on 8 December 2025, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • 45 Beech Street London EC2Y 8AD

    26/00910/MDC Submitted 24 Jun 2026 50 yards away

    Submission of details of (i) design and layout drawings for the proposed SuDS components (ii) measures to be taken to prevent flooding (iii) Evidence that Thames Water has been consulted regarding the proposed surface water pursuant to condition 3 of Planning Permission 24/00176/FULL dated 08.12.2025.

    Granted 3 docs
  • 45 Beech Street London EC2Y 8AD

    26/01457/MDC Submitted 14 Oct 2026 50 yards away

    99% historically approved · decision due ~9 Dec

    Submission of lift details pursuant to discharge of condition 8 of planning permission 24/00176/FULL dated 08.12.2025.

    Awaiting decision
  • 45 Beech Street London EC2Y 8AD

    26/01391/PODC Submitted 1 Oct 2026 50 yards away

    Submission of the Local Procurement Strategy and Local Training Skills and Job Brokerage Strategy pursuant to Schedule 3 Paragraph 2.1.1 and Schedule 3 Paragraph 3.2 respectively of the S106 Agreement dated 08 December 2025 (Planning Application Reference: 24/00176/FULL).

    Granted
  • 45 Beech Street London EC2Y 8AD

    26/00825/MDC Submitted 8 Jun 2026 50 yards away

    Submission of detail of Scheme of Protective Works, Site Condition Survey, NRMM Registration, Demolition and Construction Logistics Plan, and Protection of Water infrastructure pursuant to condition 2, 4, 5, 6 and 7 of Planning Permission 24/00176/FULL dated 08.12.2025.

    Granted Demolition 9 docs
  • 45 Beech Street London EC2Y 8AD

    26/00926/NMA Submitted 30 Jun 2026 50 yards away

    100% historically approved · decision due ~28 Aug

    Non-material amendment under Section 96A of the Town Planning and Country Act 1990 to planning permission reference 24/00176/FULL dated 8 December 2025 to amend Condition 46 (approved drawings) to allow amendments to: internal layouts and communal amenity spaces; entrance and access arrangements; stair and lift cores; co-living unit layouts; roof plant and associated roofscape detailing; façade materials and architectural detailing; and associated alterations to the approved elevations.

    Awaiting decision Amendments 53 docs
  • 45 Beech Street London EC2Y 8AD

    21/00561/DPAR Submitted 30 Jun 2021 50 yards away

    Application under Schedule 2, Part 16, Class A of the Town and Country Planning (General Permitted Development) Order 2015 as to whether prior approval is required for the upgrade of an existing telecommunications base station, comprising of the mounting of 3 no. existing antennas and removal and replacement of 3 no. antennas on 3 no. replacement antenna support poles (2 no. 6m tall poles to a height of 32.5m and 1 no. 5.2m tall pole to a height of 32.0m), supporting 4 no. antennas at 32.5m to top and 2 no. antennas at 30.0m to top and mounting of a GPS module on the top of one of the support poles; the siting of one new rooftop cabinet and relocation of 1 no. existing rooftop cabinet and ancillary works.

    Granted Outline 15 docs

In City of London

  • 26/01083/FULL Granted

    Offices Chapter House St Paul's Churchyard London EC4M 8AD

    Alterations to undercroft of St Paul's Cathedral and minor alterations to Chapter House including (i) Installation of a new passenger lift and associated raised platform within the external contemporary undercroft of St Paul's Cathedral to provide step-free access between the Chapter House and the undercroft (ii) extension of the existing step at the eastern exit of the Chapter House following partial demolition of existing external staircase, landing, and railings to provide level access and replacement of existing security gate (iii) raising the floor level and removal of associated stairs at below-ground level and installation of external, open platform lift in undercroft (No other works to the Cathedral or wider undercroft).

    Received 29 Jul, published by the council 19 Aug 2026 Full applications
  • 26/01051/FULL Granted

    55 Mark Lane London EC3R 7NE

    Application under S73 of the Town and Country Planning Act 1990 (as amended) to allow the removal of condition 2 (refuse collection) of planning permission 15/00931/FULL dated 29/10/2015.

    Received 27 Jul, published by the council 9 Aug 2026 Full applications
  • 24/00544/FULL Granted

    6 -7 New Street London EC2M 4TP

    Conversion of two dwelling houses into eight studio flats and one two bedroom flat (ii) external alterations to windows on rear elevation of number 7 and mansard roof of number 6.

    Received 28 May, published by the council 30 Oct 2026 Full applications
  • 26/00858/FULL Granted

    Condor House 10 St Paul's Churchyard London EC4M 8AL

    Replacement of existing vertical sash window frames and glazing on north, east and northwestern facades with fixed glazing units.

    Received 12 Jun, published by the council 24 Jul 2026 Full applications
  • 26/01104/FULL Granted

    30 - 34 Moorgate London EC2R 6DA

    Refurbishment and alterations comprising, (i) alterations to plant equipment at roof level, (ii) installation of CCTV cameras, (iii) alterations to ground floor entrances, and (iv) removal of 2no. ground floor doors and installation of glazing, and associated works.

    Received 31 Jul, published by the council 24 Aug 2026 Full applications