Planning application
92 New Bond Street London W1S 1SQ
Works: Demolition
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Variation of condition 1 and 20 of planning permission dated 20th October 2025 (RN:24/08719/FULL) for the Substantial demolition behind retained facade and partial basement retention, erection of new building comprising basement, ground and four upper floors (including a plant enclosure at the roof level) in Class E use with retail fronting New Bond Street and flexible office uses above [RE-CONSULTATION - clarified description of development to emphasise demolition behind retained façade; actual proposals are unchanged.] Namely, deconstruction and Rebuilding of the retained element of the facade, updates to internal floor levels to provide an enhanced retail unit with improved floor to ceiling heights, updates to rear elevation, updates to No.93 New Bond Street fire escape, internal layout updates and roof layout updates.
As published by the council, reference 26/04329/FULL
Application record
- Reference
- 26/04329/FULL
- Category
- Full applications
- Status
- Pending
- Received
- 1 Jul 2026
- Validated
- 1 Jul 2026
- Postcode
- W1S 1SQ
Site history
Applications at this address on the Westminster register
This site has had 7 applications since 2026.
-
26/04330/NMA Decided
92 New Bond Street London W1S 1SQ
Amendments to planning permission dated 20th October 2025 (RN:24/08719/FULL) for Substantial demolition behind retained facade and partial basement retention, erection of new building comprising basement, ground and four upper floors (including a plant enclosure at the roof level) in Class E use with retail fronting New Bond Street and flexible office uses above [RE-CONSULTATION - clarified description of development to emphasise demolition behind retained façade; actual proposals are unchanged.] Namely, to amend the description of development.
-
26/03514/ADFULL Awaiting decision
92 New Bond Street London W1S 1SQ
Details of any work on site including all works of deconstruction and demolition and any construction works pursuant to condition 20 (part 1 and 2) of planning permission dated 20th October 2025 (RN:24/08719).
-
26/01752/ADFULL Awaiting decision
92 New Bond Street London W1S 1SQ
Details of samples (photos) of the facing materials, including glazing, and elevations and roof plans annotated to show where the materials are to be located pursuant to condition 5 of planning permission dated 20th October 2025 (RN: 24/08719).
-
26/01751/ADFULL Awaiting decision
92 New Bond Street London W1S 1SQ
Details of site investigation to find out if the building or land are contaminated with dangerous material, to assess the contamination that is present, and to find out if it could affect human health or the environment pursuant to condition 11 (Parts 1-3) of planning permission dated 20th October 2025 (RN: 24/08719).
-
26/01750/ADFULL Awaiting decision
92 New Bond Street London W1S 1SQ
Details of all flood resilient, resistant measures and site specific seasonally high groundwater monitoring undertaken to evidence the existing groundwater flood risk pursuant to conditions 9 and 10 of planning permission dated 20th October 2025 (RN: 24/08719).
-
26/01749/ADFULL Awaiting decision
92 New Bond Street London W1S 1SQ
Detailed drawings of windows and shopfronts pursuant to condition 4 of planning permission dated 20th October 2025 (RN: 24/08719).
Timeline
Dates from the published record
-
1 Jul 2026
Received by Westminster
-
21 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 26 August 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Westminster took a median of 91 days over the applications it decided in the last year.
What happens while it is decided
This application is with Westminster for determination, against a statutory target of eight weeks. Over the last year Westminster decided full applications in a median of 119 days. More in our guide to how long planning decisions take.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
92 New Bond Street London W1S 1SQ
93% historically approved · decision due ~26 Aug
Amendments to planning permission dated 20th October 2025 (RN:24/08719/FULL) for Substantial demolition behind retained facade and partial basement retention, erection of new building comprising basement, ground and four upper floors (including a plant enclosure at the roof level) in Class E use with retail fronting New Bond Street and flexible office uses above [RE-CONSULTATION - clarified description of development to emphasise demolition behind retained façade; actual proposals are unchanged.] Namely, to amend the description of development.
Decided Amendments Demolition -
92 New Bond Street London W1S 1SQ
88% historically approved · decision due ~23 Jul
Details of any work on site including all works of deconstruction and demolition and any construction works pursuant to condition 20 (part 1 and 2) of planning permission dated 20th October 2025 (RN:24/08719).
Awaiting decision Full applications Demolition 4 docs -
92 New Bond Street London W1S 1SQ
88% historically approved · decision due ~13 May
Details of samples (photos) of the facing materials, including glazing, and elevations and roof plans annotated to show where the materials are to be located pursuant to condition 5 of planning permission dated 20th October 2025 (RN: 24/08719).
Awaiting decision Full applications Windows or glazing 4 docs -
92 New Bond Street London W1S 1SQ
88% historically approved · decision due ~13 May
Details of site investigation to find out if the building or land are contaminated with dangerous material, to assess the contamination that is present, and to find out if it could affect human health or the environment pursuant to condition 11 (Parts 1-3) of planning permission dated 20th October 2025 (RN: 24/08719).
Awaiting decision Full applications 5 docs -
92 New Bond Street London W1S 1SQ
88% historically approved · decision due ~13 May
Details of all flood resilient, resistant measures and site specific seasonally high groundwater monitoring undertaken to evidence the existing groundwater flood risk pursuant to conditions 9 and 10 of planning permission dated 20th October 2025 (RN: 24/08719).
Awaiting decision Full applications 8 docs -
92 New Bond Street London W1S 1SQ
88% historically approved · decision due ~13 May
Detailed drawings of windows and shopfronts pursuant to condition 4 of planning permission dated 20th October 2025 (RN: 24/08719).
Awaiting decision Full applications Windows or glazing 4 docs
Other full applications
In Westminster
-
26/07528/FULL Awaiting decision
69 Eaton Place London SW1X 8DF
Installation of new cast iron water pipe on rear courtyard elevation. (Linked with 26/07529/LBC)
-
26/05200/FULL Decided
1 The Court House 165 Seymour Place London W1H 4PU
Installation of waterproofing system to the existing lead flat roofs
-
26/07521/FULL Awaiting decision
Flat 18 Harlequin Court 20 Tavistock Street London WC2E 7NZ
Installation of one external condenser unit
-
26/07508/FULL Awaiting decision
Buckingham Palace The Mall London SW1A 1AA
Replacement of existing security lighting to the Buckingham Palace Forecourt with 80 compact LED spotlights installed within the lantern clusters across 10 principal piers, with associated concealed cabling and reversible fixings. (Linked with 26/07509/LBC)
-
26/07472/FULL Awaiting decision
Flat 3 82 New Cavendish Street London W1G 9TA
Replacement windows to second floor level with vacuum, double glazing windows. (Linked with 26/07473/LBC)