Planning application
92 New Bond Street London W1S 1SQ
Works: Demolition
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Variation of condition 1 and 20 of planning permission dated 20th October 2025 (RN:24/08719/FULL) for the Substantial demolition behind retained facade and partial basement retention, erection of new building comprising basement, ground and four upper floors (including a plant enclosure at the roof level) in Class E use with retail fronting New Bond Street and flexible office uses above [RE-CONSULTATION - clarified description of development to emphasise demolition behind retained façade; actual proposals are unchanged.] Namely, deconstruction and Rebuilding of the retained element of the facade, updates to internal floor levels to provide an enhanced retail unit with improved floor to ceiling heights, updates to rear elevation, updates to No.93 New Bond Street fire escape, internal layout updates and roof layout updates.
As published by the council, reference 26/04329/FULL
Application record
- Reference
- 26/04329/FULL
- Category
- Full applications
- Status
- Pending
- Received
- 1 Jul 2026
- Validated
- 1 Jul 2026
- Postcode
- W1S 1SQ
Site history
Applications at this address on the Westminster register
This site has had 7 applications since 2026.
-
26/04330/NMA Decided
92 New Bond Street London W1S 1SQ
Amendments to planning permission dated 20th October 2025 (RN:24/08719/FULL) for Substantial demolition behind retained facade and partial basement retention, erection of new building comprising basement, ground and four upper floors (including a plant enclosure at the roof level) in Class E use with retail fronting New Bond Street and flexible office uses above [RE-CONSULTATION - clarified description of development to emphasise demolition behind retained façade; actual proposals are unchanged.] Namely, to amend the description of development.
-
26/03514/ADFULL Awaiting decision
92 New Bond Street London W1S 1SQ
Details of any work on site including all works of deconstruction and demolition and any construction works pursuant to condition 20 (part 1 and 2) of planning permission dated 20th October 2025 (RN:24/08719).
-
26/01752/ADFULL Awaiting decision
92 New Bond Street London W1S 1SQ
Details of samples (photos) of the facing materials, including glazing, and elevations and roof plans annotated to show where the materials are to be located pursuant to condition 5 of planning permission dated 20th October 2025 (RN: 24/08719).
-
26/01751/ADFULL Awaiting decision
92 New Bond Street London W1S 1SQ
Details of site investigation to find out if the building or land are contaminated with dangerous material, to assess the contamination that is present, and to find out if it could affect human health or the environment pursuant to condition 11 (Parts 1-3) of planning permission dated 20th October 2025 (RN: 24/08719).
-
26/01750/ADFULL Awaiting decision
92 New Bond Street London W1S 1SQ
Details of all flood resilient, resistant measures and site specific seasonally high groundwater monitoring undertaken to evidence the existing groundwater flood risk pursuant to conditions 9 and 10 of planning permission dated 20th October 2025 (RN: 24/08719).
-
26/01749/ADFULL Awaiting decision
92 New Bond Street London W1S 1SQ
Detailed drawings of windows and shopfronts pursuant to condition 4 of planning permission dated 20th October 2025 (RN: 24/08719).
Timeline
Dates from the published record
-
1 Jul 2026
Received by Westminster
-
21 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 26 August 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Westminster took a median of 66 days over the applications it decided in the last year.
What happens while it is decided
This application is with Westminster for determination, against a statutory target of eight weeks. Over the last year Westminster decided full applications in a median of 91 days. More in our guide to how long planning decisions take.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
92 New Bond Street London W1S 1SQ
93% historically approved · decision due ~26 Aug
Amendments to planning permission dated 20th October 2025 (RN:24/08719/FULL) for Substantial demolition behind retained facade and partial basement retention, erection of new building comprising basement, ground and four upper floors (including a plant enclosure at the roof level) in Class E use with retail fronting New Bond Street and flexible office uses above [RE-CONSULTATION - clarified description of development to emphasise demolition behind retained façade; actual proposals are unchanged.] Namely, to amend the description of development.
Decided Amendments Demolition -
92 New Bond Street London W1S 1SQ
87% historically approved · decision due ~23 Jul
Details of any work on site including all works of deconstruction and demolition and any construction works pursuant to condition 20 (part 1 and 2) of planning permission dated 20th October 2025 (RN:24/08719).
Awaiting decision Full applications Demolition 4 docs -
92 New Bond Street London W1S 1SQ
87% historically approved · decision due ~13 May
Details of samples (photos) of the facing materials, including glazing, and elevations and roof plans annotated to show where the materials are to be located pursuant to condition 5 of planning permission dated 20th October 2025 (RN: 24/08719).
Awaiting decision Full applications Windows or glazing 4 docs -
92 New Bond Street London W1S 1SQ
87% historically approved · decision due ~13 May
Details of site investigation to find out if the building or land are contaminated with dangerous material, to assess the contamination that is present, and to find out if it could affect human health or the environment pursuant to condition 11 (Parts 1-3) of planning permission dated 20th October 2025 (RN: 24/08719).
Awaiting decision Full applications 5 docs -
92 New Bond Street London W1S 1SQ
87% historically approved · decision due ~13 May
Details of all flood resilient, resistant measures and site specific seasonally high groundwater monitoring undertaken to evidence the existing groundwater flood risk pursuant to conditions 9 and 10 of planning permission dated 20th October 2025 (RN: 24/08719).
Awaiting decision Full applications 8 docs -
92 New Bond Street London W1S 1SQ
87% historically approved · decision due ~13 May
Detailed drawings of windows and shopfronts pursuant to condition 4 of planning permission dated 20th October 2025 (RN: 24/08719).
Awaiting decision Full applications Windows or glazing 4 docs
Other full applications
In Westminster
-
26/06295/FULL Awaiting decision
15 Warwick Way London SW1V 1QT
Installation of a new shopfront with Medication Dispensing Outlet.
-
26/06297/FULL Awaiting decision
15 Warwick Way London SW1V 1QT
Alterations to rear elevation at basement level comprising replacement window and installation of double opening door.
-
26/06294/FULL Awaiting decision
15 Eaton Mews South London SW1W 9HP
Installation of railings and sliding lantern light at main roof level in connection with the use of the roof as a terrace.
-
26/06273/FULL Awaiting decision
9A Grosvenor Square London W1K 5AE
Installation of new natural Portland Stone step surfaces to the two highway facing front entrance doors. (Linked to 26/05473/LBC)
-
26/06277/FULL Awaiting decision
Hospital 60 Grove End Road London NW8 9NH
Variation of conditions 1 and removal of condition 6 of planning permission dated 12th November 2019 (RN 19/07202/FULL) for the Variation of condition 12 of planning permission dated 21 June 2013 (RN: 13/01330/FULL) for the: Demolition of single storey block to north east elevation of main hospital building. Erection of three storey building (plus basement level) with link to existing hospital fronting onto Grove End Road and erection of two storey extension to the main entrance building, both to provide additional hospital accommodation (Class D1). Installation of mechanical plant and associated external alterations. NAMELY, to include amended phase 2 drawings and condition 6 to be removed as the as approved 11 car parking space are no longer proposed and the car lift is no longer shown on the amended plans.