92 New Bond Street London W1S 1SQ

Awaiting decision Westminster 26/01750/ADFULL Approval of Details (Full PP)

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Details of all flood resilient, resistant measures and site specific seasonally high groundwater monitoring undertaken to evidence the existing groundwater flood risk pursuant to conditions 9 and 10 of planning permission dated 20th October 2025 (RN: 24/08719).

As published by the council, reference 26/01750/ADFULL

Application record

Reference
26/01750/ADFULL
Type
Approval of Details (Full PP)
Status
Pending
Received
18 Mar 2026
Validated
18 Mar 2026
Ward
West End
Postcode
W1S 1SQ

Site history

Applications at this address on the Westminster register

This site has had 7 applications since 2026.

  • 26/04330/NMA Decided

    92 New Bond Street London W1S 1SQ

    Amendments to planning permission dated 20th October 2025 (RN:24/08719/FULL) for Substantial demolition behind retained facade and partial basement retention, erection of new building comprising basement, ground and four upper floors (including a plant enclosure at the roof level) in Class E use with retail fronting New Bond Street and flexible office uses above [RE-CONSULTATION - clarified description of development to emphasise demolition behind retained façade; actual proposals are unchanged.] Namely, to amend the description of development.

    Submitted 1 Jul 2026 Amendments
  • 26/04329/FULL Awaiting decision

    92 New Bond Street London W1S 1SQ

    Variation of condition 1 and 20 of planning permission dated 20th October 2025 (RN:24/08719/FULL) for the Substantial demolition behind retained facade and partial basement retention, erection of new building comprising basement, ground and four upper floors (including a plant enclosure at the roof level) in Class E use with retail fronting New Bond Street and flexible office uses above [RE-CONSULTATION - clarified description of development to emphasise demolition behind retained façade; actual proposals are unchanged.] Namely, deconstruction and Rebuilding of the retained element of the facade, updates to internal floor levels to provide an enhanced retail unit with improved floor to ceiling heights, updates to rear elevation, updates to No.93 New Bond Street fire escape, internal layout updates and roof layout updates.

    Submitted 1 Jul 2026 Full applications
  • 26/03514/ADFULL Awaiting decision

    92 New Bond Street London W1S 1SQ

    Details of any work on site including all works of deconstruction and demolition and any construction works pursuant to condition 20 (part 1 and 2) of planning permission dated 20th October 2025 (RN:24/08719).

    Submitted 28 May 2026 Full applications
  • 26/01752/ADFULL Awaiting decision

    92 New Bond Street London W1S 1SQ

    Details of samples (photos) of the facing materials, including glazing, and elevations and roof plans annotated to show where the materials are to be located pursuant to condition 5 of planning permission dated 20th October 2025 (RN: 24/08719).

    Submitted 18 Mar 2026 Full applications
  • 26/01751/ADFULL Awaiting decision

    92 New Bond Street London W1S 1SQ

    Details of site investigation to find out if the building or land are contaminated with dangerous material, to assess the contamination that is present, and to find out if it could affect human health or the environment pursuant to condition 11 (Parts 1-3) of planning permission dated 20th October 2025 (RN: 24/08719).

    Submitted 18 Mar 2026 Full applications
  • 26/01749/ADFULL Awaiting decision

    92 New Bond Street London W1S 1SQ

    Detailed drawings of windows and shopfronts pursuant to condition 4 of planning permission dated 20th October 2025 (RN: 24/08719).

    Submitted 18 Mar 2026 Full applications

Timeline

Dates from the published record

  1. 18 Mar 2026

    Received by Westminster

  2. 21 Jul 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 13 May 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Westminster took a median of 66 days over the applications it decided in the last year.

Documents

Plans, drawings, consultee responses and the officer's report

8 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What happens while it is decided

This application is with Westminster for determination, against a statutory target of eight weeks. Over the last year Westminster decided full applications in a median of 91 days. More in our guide to how long planning decisions take.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • 92 New Bond Street London W1S 1SQ

    26/03514/ADFULL Submitted 28 May 2026 50 yards away

    87% historically approved · decision due ~23 Jul

    Details of any work on site including all works of deconstruction and demolition and any construction works pursuant to condition 20 (part 1 and 2) of planning permission dated 20th October 2025 (RN:24/08719).

    Awaiting decision Full applications Demolition 4 docs
  • 92 New Bond Street London W1S 1SQ

    26/01752/ADFULL Submitted 18 Mar 2026 50 yards away

    87% historically approved · decision due ~13 May

    Details of samples (photos) of the facing materials, including glazing, and elevations and roof plans annotated to show where the materials are to be located pursuant to condition 5 of planning permission dated 20th October 2025 (RN: 24/08719).

    Awaiting decision Full applications Windows or glazing 4 docs
  • 92 New Bond Street London W1S 1SQ

    26/01751/ADFULL Submitted 18 Mar 2026 50 yards away

    87% historically approved · decision due ~13 May

    Details of site investigation to find out if the building or land are contaminated with dangerous material, to assess the contamination that is present, and to find out if it could affect human health or the environment pursuant to condition 11 (Parts 1-3) of planning permission dated 20th October 2025 (RN: 24/08719).

    Awaiting decision Full applications 5 docs
  • 92 New Bond Street London W1S 1SQ

    26/01749/ADFULL Submitted 18 Mar 2026 50 yards away

    87% historically approved · decision due ~13 May

    Detailed drawings of windows and shopfronts pursuant to condition 4 of planning permission dated 20th October 2025 (RN: 24/08719).

    Awaiting decision Full applications Windows or glazing 4 docs
  • 92 New Bond Street London W1S 1SQ

    26/04330/NMA Submitted 1 Jul 2026 50 yards away

    93% historically approved · decision due ~26 Aug

    Amendments to planning permission dated 20th October 2025 (RN:24/08719/FULL) for Substantial demolition behind retained facade and partial basement retention, erection of new building comprising basement, ground and four upper floors (including a plant enclosure at the roof level) in Class E use with retail fronting New Bond Street and flexible office uses above [RE-CONSULTATION - clarified description of development to emphasise demolition behind retained façade; actual proposals are unchanged.] Namely, to amend the description of development.

    Decided Amendments Demolition
  • 92 New Bond Street London W1S 1SQ

    26/04329/FULL Submitted 1 Jul 2026 50 yards away

    87% historically approved · decision due ~26 Aug

    Variation of condition 1 and 20 of planning permission dated 20th October 2025 (RN:24/08719/FULL) for the Substantial demolition behind retained facade and partial basement retention, erection of new building comprising basement, ground and four upper floors (including a plant enclosure at the roof level) in Class E use with retail fronting New Bond Street and flexible office uses above [RE-CONSULTATION - clarified description of development to emphasise demolition behind retained façade; actual proposals are unchanged.] Namely, deconstruction and Rebuilding of the retained element of the facade, updates to internal floor levels to provide an enhanced retail unit with improved floor to ceiling heights, updates to rear elevation, updates to No.93 New Bond Street fire escape, internal layout updates and roof layout updates.

    Awaiting decision Full applications Demolition

In Westminster

  • 26/06295/FULL Awaiting decision

    15 Warwick Way London SW1V 1QT

    Installation of a new shopfront with Medication Dispensing Outlet.

    Received 15 Sep, published by the council 17 Sep 2026 Full applications
  • 26/06297/FULL Awaiting decision

    15 Warwick Way London SW1V 1QT

    Alterations to rear elevation at basement level comprising replacement window and installation of double opening door.

    Received 15 Sep, published by the council 17 Sep 2026 Full applications
  • 26/06294/FULL Awaiting decision

    15 Eaton Mews South London SW1W 9HP

    Installation of railings and sliding lantern light at main roof level in connection with the use of the roof as a terrace.

    Received 15 Sep, published by the council 22 Sep 2026 Full applications
  • 26/06317/FULL Awaiting decision

    124 Hamilton Terrace London NW8 9UT

    Replacement of existing first-floor sash windows to the front and rear elevations with traditionally detailed painted timber, slim-profile double-glazed sash windows. (Linked to 26/06318/LBC)

    Received 15 Sep, published by the council 22 Sep 2026 Full applications
  • 26/06273/FULL Awaiting decision

    9A Grosvenor Square London W1K 5AE

    Installation of natural Portland Stone paving to two front entrances. (Linked to 26/05473/LBC)

    Received 14 Sep, published by the council 22 Sep 2026 Full applications