Planning application
92 New Bond Street London W1S 1SQ
Works: Windows or glazing
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Details of samples (photos) of the facing materials, including glazing, and elevations and roof plans annotated to show where the materials are to be located pursuant to condition 5 of planning permission dated 20th October 2025 (RN: 24/08719).
As published by the council, reference 26/01752/ADFULL
Application record
- Reference
- 26/01752/ADFULL
- Type
- Approval of Details (Full PP)
- Status
- Pending
- Received
- 18 Mar 2026
- Validated
- 18 Mar 2026
- Ward
- West End
- Postcode
- W1S 1SQ
Site history
Applications at this address on the Westminster register
This site has had 7 applications since 2026.
-
26/04330/NMA Decided
92 New Bond Street London W1S 1SQ
Amendments to planning permission dated 20th October 2025 (RN:24/08719/FULL) for Substantial demolition behind retained facade and partial basement retention, erection of new building comprising basement, ground and four upper floors (including a plant enclosure at the roof level) in Class E use with retail fronting New Bond Street and flexible office uses above [RE-CONSULTATION - clarified description of development to emphasise demolition behind retained façade; actual proposals are unchanged.] Namely, to amend the description of development.
-
26/04329/FULL Awaiting decision
92 New Bond Street London W1S 1SQ
Variation of condition 1 and 20 of planning permission dated 20th October 2025 (RN:24/08719/FULL) for the Substantial demolition behind retained facade and partial basement retention, erection of new building comprising basement, ground and four upper floors (including a plant enclosure at the roof level) in Class E use with retail fronting New Bond Street and flexible office uses above [RE-CONSULTATION - clarified description of development to emphasise demolition behind retained façade; actual proposals are unchanged.] Namely, deconstruction and Rebuilding of the retained element of the facade, updates to internal floor levels to provide an enhanced retail unit with improved floor to ceiling heights, updates to rear elevation, updates to No.93 New Bond Street fire escape, internal layout updates and roof layout updates.
-
26/03514/ADFULL Awaiting decision
92 New Bond Street London W1S 1SQ
Details of any work on site including all works of deconstruction and demolition and any construction works pursuant to condition 20 (part 1 and 2) of planning permission dated 20th October 2025 (RN:24/08719).
-
26/01751/ADFULL Awaiting decision
92 New Bond Street London W1S 1SQ
Details of site investigation to find out if the building or land are contaminated with dangerous material, to assess the contamination that is present, and to find out if it could affect human health or the environment pursuant to condition 11 (Parts 1-3) of planning permission dated 20th October 2025 (RN: 24/08719).
-
26/01750/ADFULL Awaiting decision
92 New Bond Street London W1S 1SQ
Details of all flood resilient, resistant measures and site specific seasonally high groundwater monitoring undertaken to evidence the existing groundwater flood risk pursuant to conditions 9 and 10 of planning permission dated 20th October 2025 (RN: 24/08719).
-
26/01749/ADFULL Awaiting decision
92 New Bond Street London W1S 1SQ
Detailed drawings of windows and shopfronts pursuant to condition 4 of planning permission dated 20th October 2025 (RN: 24/08719).
Timeline
Dates from the published record
-
18 Mar 2026
Received by Westminster
-
21 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 13 May 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Westminster took a median of 66 days over the applications it decided in the last year.
Documents
Plans, drawings, consultee responses and the officer's report
4 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat happens while it is decided
This application is with Westminster for determination, against a statutory target of eight weeks. Over the last year Westminster decided full applications in a median of 91 days. More in our guide to how long planning decisions take.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
92 New Bond Street London W1S 1SQ
87% historically approved · decision due ~23 Jul
Details of any work on site including all works of deconstruction and demolition and any construction works pursuant to condition 20 (part 1 and 2) of planning permission dated 20th October 2025 (RN:24/08719).
Awaiting decision Full applications Demolition 4 docs -
92 New Bond Street London W1S 1SQ
87% historically approved · decision due ~13 May
Details of site investigation to find out if the building or land are contaminated with dangerous material, to assess the contamination that is present, and to find out if it could affect human health or the environment pursuant to condition 11 (Parts 1-3) of planning permission dated 20th October 2025 (RN: 24/08719).
Awaiting decision Full applications 5 docs -
92 New Bond Street London W1S 1SQ
87% historically approved · decision due ~13 May
Details of all flood resilient, resistant measures and site specific seasonally high groundwater monitoring undertaken to evidence the existing groundwater flood risk pursuant to conditions 9 and 10 of planning permission dated 20th October 2025 (RN: 24/08719).
Awaiting decision Full applications 8 docs -
92 New Bond Street London W1S 1SQ
87% historically approved · decision due ~13 May
Detailed drawings of windows and shopfronts pursuant to condition 4 of planning permission dated 20th October 2025 (RN: 24/08719).
Awaiting decision Full applications Windows or glazing 4 docs -
92 New Bond Street London W1S 1SQ
93% historically approved · decision due ~26 Aug
Amendments to planning permission dated 20th October 2025 (RN:24/08719/FULL) for Substantial demolition behind retained facade and partial basement retention, erection of new building comprising basement, ground and four upper floors (including a plant enclosure at the roof level) in Class E use with retail fronting New Bond Street and flexible office uses above [RE-CONSULTATION - clarified description of development to emphasise demolition behind retained façade; actual proposals are unchanged.] Namely, to amend the description of development.
Decided Amendments Demolition -
92 New Bond Street London W1S 1SQ
87% historically approved · decision due ~26 Aug
Variation of condition 1 and 20 of planning permission dated 20th October 2025 (RN:24/08719/FULL) for the Substantial demolition behind retained facade and partial basement retention, erection of new building comprising basement, ground and four upper floors (including a plant enclosure at the roof level) in Class E use with retail fronting New Bond Street and flexible office uses above [RE-CONSULTATION - clarified description of development to emphasise demolition behind retained façade; actual proposals are unchanged.] Namely, deconstruction and Rebuilding of the retained element of the facade, updates to internal floor levels to provide an enhanced retail unit with improved floor to ceiling heights, updates to rear elevation, updates to No.93 New Bond Street fire escape, internal layout updates and roof layout updates.
Awaiting decision Full applications Demolition
Other full applications
In Westminster
-
26/06295/FULL Awaiting decision
15 Warwick Way London SW1V 1QT
Installation of a new shopfront with Medication Dispensing Outlet.
-
26/06297/FULL Awaiting decision
15 Warwick Way London SW1V 1QT
Alterations to rear elevation at basement level comprising replacement window and installation of double opening door.
-
26/06294/FULL Awaiting decision
15 Eaton Mews South London SW1W 9HP
Installation of railings and sliding lantern light at main roof level in connection with the use of the roof as a terrace.
-
26/06317/FULL Awaiting decision
124 Hamilton Terrace London NW8 9UT
Replacement of existing first-floor sash windows to the front and rear elevations with traditionally detailed painted timber, slim-profile double-glazed sash windows. (Linked to 26/06318/LBC)
-
26/06273/FULL Awaiting decision
9A Grosvenor Square London W1K 5AE
Installation of natural Portland Stone paving to two front entrances. (Linked to 26/05473/LBC)