Planning application
92 New Bond Street London W1S 1SQ
Works: Demolition
Decided. The decision notice on the council portal carries the outcome in full, including any conditions.
Proposal
Amendments to planning permission dated 20th October 2025 (RN:24/08719/FULL) for Substantial demolition behind retained facade and partial basement retention, erection of new building comprising basement, ground and four upper floors (including a plant enclosure at the roof level) in Class E use with retail fronting New Bond Street and flexible office uses above [RE-CONSULTATION - clarified description of development to emphasise demolition behind retained façade; actual proposals are unchanged.] Namely, to amend the description of development.
As published by the council, reference 26/04330/NMA
Application record
- Reference
- 26/04330/NMA
- Category
- Amendments
- Status
- Decided
- Received
- 1 Jul 2026
- Validated
- 1 Jul 2026
- Postcode
- W1S 1SQ
Site history
Applications at this address on the Westminster register
This site has had 7 applications since 2026.
-
26/04329/FULL Awaiting decision
92 New Bond Street London W1S 1SQ
Variation of condition 1 and 20 of planning permission dated 20th October 2025 (RN:24/08719/FULL) for the Substantial demolition behind retained facade and partial basement retention, erection of new building comprising basement, ground and four upper floors (including a plant enclosure at the roof level) in Class E use with retail fronting New Bond Street and flexible office uses above [RE-CONSULTATION - clarified description of development to emphasise demolition behind retained façade; actual proposals are unchanged.] Namely, deconstruction and Rebuilding of the retained element of the facade, updates to internal floor levels to provide an enhanced retail unit with improved floor to ceiling heights, updates to rear elevation, updates to No.93 New Bond Street fire escape, internal layout updates and roof layout updates.
-
26/03514/ADFULL Awaiting decision
92 New Bond Street London W1S 1SQ
Details of any work on site including all works of deconstruction and demolition and any construction works pursuant to condition 20 (part 1 and 2) of planning permission dated 20th October 2025 (RN:24/08719).
-
26/01752/ADFULL Awaiting decision
92 New Bond Street London W1S 1SQ
Details of samples (photos) of the facing materials, including glazing, and elevations and roof plans annotated to show where the materials are to be located pursuant to condition 5 of planning permission dated 20th October 2025 (RN: 24/08719).
-
26/01751/ADFULL Awaiting decision
92 New Bond Street London W1S 1SQ
Details of site investigation to find out if the building or land are contaminated with dangerous material, to assess the contamination that is present, and to find out if it could affect human health or the environment pursuant to condition 11 (Parts 1-3) of planning permission dated 20th October 2025 (RN: 24/08719).
-
26/01750/ADFULL Awaiting decision
92 New Bond Street London W1S 1SQ
Details of all flood resilient, resistant measures and site specific seasonally high groundwater monitoring undertaken to evidence the existing groundwater flood risk pursuant to conditions 9 and 10 of planning permission dated 20th October 2025 (RN: 24/08719).
-
26/01749/ADFULL Awaiting decision
92 New Bond Street London W1S 1SQ
Detailed drawings of windows and shopfronts pursuant to condition 4 of planning permission dated 20th October 2025 (RN: 24/08719).
Timeline
Dates from the published record
-
1 Jul 2026
Received by Westminster
-
21 Jul 2026
Added to PlanIndex
-
9 Aug 2026
Status changed to Decided
Previously Pending.
After the decision
Westminster has decided this application; the outcome above is the register's own wording and the decision notice on the council portal carries the detail. More in our guide to what happens after a planning decision.
About amendment applications
An amendment application makes limited changes to a permission that already exists; anything beyond modest adjustment needs a fresh application. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
92 New Bond Street London W1S 1SQ
88% historically approved · decision due ~26 Aug
Variation of condition 1 and 20 of planning permission dated 20th October 2025 (RN:24/08719/FULL) for the Substantial demolition behind retained facade and partial basement retention, erection of new building comprising basement, ground and four upper floors (including a plant enclosure at the roof level) in Class E use with retail fronting New Bond Street and flexible office uses above [RE-CONSULTATION - clarified description of development to emphasise demolition behind retained façade; actual proposals are unchanged.] Namely, deconstruction and Rebuilding of the retained element of the facade, updates to internal floor levels to provide an enhanced retail unit with improved floor to ceiling heights, updates to rear elevation, updates to No.93 New Bond Street fire escape, internal layout updates and roof layout updates.
Awaiting decision Full applications Demolition -
92 New Bond Street London W1S 1SQ
88% historically approved · decision due ~23 Jul
Details of any work on site including all works of deconstruction and demolition and any construction works pursuant to condition 20 (part 1 and 2) of planning permission dated 20th October 2025 (RN:24/08719).
Awaiting decision Full applications Demolition 4 docs -
92 New Bond Street London W1S 1SQ
88% historically approved · decision due ~13 May
Details of samples (photos) of the facing materials, including glazing, and elevations and roof plans annotated to show where the materials are to be located pursuant to condition 5 of planning permission dated 20th October 2025 (RN: 24/08719).
Awaiting decision Full applications Windows or glazing 4 docs -
92 New Bond Street London W1S 1SQ
88% historically approved · decision due ~13 May
Details of site investigation to find out if the building or land are contaminated with dangerous material, to assess the contamination that is present, and to find out if it could affect human health or the environment pursuant to condition 11 (Parts 1-3) of planning permission dated 20th October 2025 (RN: 24/08719).
Awaiting decision Full applications 5 docs -
92 New Bond Street London W1S 1SQ
88% historically approved · decision due ~13 May
Details of all flood resilient, resistant measures and site specific seasonally high groundwater monitoring undertaken to evidence the existing groundwater flood risk pursuant to conditions 9 and 10 of planning permission dated 20th October 2025 (RN: 24/08719).
Awaiting decision Full applications 8 docs -
92 New Bond Street London W1S 1SQ
88% historically approved · decision due ~13 May
Detailed drawings of windows and shopfronts pursuant to condition 4 of planning permission dated 20th October 2025 (RN: 24/08719).
Awaiting decision Full applications Windows or glazing 4 docs
Other amendment applications
In Westminster
-
26/07459/NMA Awaiting decision
1 Hanover Square London W1S 1HA
Amendments to planning pemrission dated 10 October 2025 (RN: 25/01558/FULL) for the: Partial demolition, refurbishment and extension of the existing building to provide a sub-basement, basement, ground plus eight storey building; infilling and stepped rear extension; excavation of a new sub-basement level; installation of new plant equipment at basement and roof level; terraces at fourth, fifth, sixth, seventh and eighth floor levels; soft and hard landscaping; reprovision of car parking; new cycle parking facilities; and associated external works. Use of the building for retail and/or restaurant (Class E) on part ground floor and office (Class E) on all other floors. NAMELY, to allow alterations to the design of the ground floor frontages on Hanover Square and St George Street.
-
26/07438/NMA Awaiting decision
29 - 31 Hill Street London W1J 5LS
Amendments to planning permission dated 1st July 2025 (RN 25/01006/FULL) for the external alterations at roof level including the creation of Level 04 roof terrace for use in association with existing office (Class E), replacement and installation of new plant and landscaping, replacement of windows, introduction of louvres, removal and replacement of rooflights, installation of new rooflight and other associated works. NAMELY, for alterations comprising of the removal of window sash boxes and weights, changes to the window mullion arrangement, the removal of two sash windows, the installation of secondary glazing, the removal of existing chamber hatch and installation of extract vent and integrated bench, the external replacement of rainwater goods and hoppers, the removal of bricks and installation of airbricks, minor demolition works, replacement of roof covering, removal of ductwork, roof plant rearrangement, the installation of a new external door to plant area, minor layout alterations and other associated works.
-
26/07389/NMA Decided
Flat 1 5 Grittleton Road London W9 2DD
Amendments to planning permission dated 04 June 2025 (RN: 25/02022/FULL), NAMELY, amendment of Condition 4 to correct the property address from 9 Aldridge Road Villas to Flat 1 5 Grittleton Road.
-
26/07377/NMA Awaiting decision
60 Ledbury Road London W11 2AJ
Amendments to planning permission dated 2nd October 2025 (RN 25/04018/FULL) for the Partial demolition, refurbishment, and erection of a mansard roof extension to form a new third floor with dormers to front, side and rear elevations; to form 6 flats (Class C3) on upper floors; external plant equipment and ductwork; lower ground floor excavation to increase floor to ceiling height; replacement windows; cycle parking and associated external alterations; use of the part ground floor and lower ground floor as retail and restaurant (Class E). Site includes 60-68 Ledbury Road) NAMELY, An amendment to the basement and ground floor drawing reference numbers; amendment to the description of development, in reference to restaurant and or retail use; and amendments to C
-
26/07375/NMA Awaiting decision
77 Hereford Road London W2 5BB
Amendments to planning permission dated 4th August 2026 (RN 26/03970/FULL) for the Replacement of roof terrace access stair with glazed hatch, new timber decking and front and rear roof railings to roof terrace, with infilling side window of closet wing. NAMELY, Hinged hatch access substituted by sliding hatch.