Planning application
Land North East Of Bury St Edmunds Bury Road Great Barton Suffolk
Relates to DC/19/2456/HYB
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Reserved matters application - submission of details under Hybrid Planning Permission DC/19/2456/HYB (granted at appeal under ref: APP/F3545/W/22/3297751) in relation to Phase 2 - appearance, layout, scale, landscaping and access for residential dwellings (Class C3) and commercial uses (Use Class E) along with associated road layout, car and cycle parking, site-wide landscaping, private and public realm and other associated works. Part discharge of conditions 19 (Noise), 29 (Arboriculture) and 35 (Green Infrastructure and Landscape Strategy) in relation to Phase 2 only
As published by the council, reference DC/26/0903/RM
Application record
- Reference
- DC/26/0903/RM
- Category
- Reserved matters
- Status
- Pending Consideration
- Received
- 15 Jun 2026
- Validated
- 15 Jun 2026
- Ward
- The Fornhams And Great Barton
- Parish
- Great Barton
Site history
Applications at this address on the West Suffolk register
This site has had 30 applications since 2019: 15 approved, 0 refused.
-
DCON(U)/19/2456 Awaiting decision
Land North East Of Bury St Edmunds Bury Road Great Barton Suffolk
Application to discharge conditions 44 (allotments) and 45 (pond restoration and management) of application DC/19/2456/HYB (allowed at appeal AP/22/0031/STAND)
-
DCON(A)/26/0057 Decided
Land North East Of Bury St Edmunds Bury Road Great Barton Suffolk
Application to discharge condition 9 (Implementation of Gain Plan) for application DC/26/0057/FUL
-
NMA(H)/19/2456 Decided
Land North East Of Bury St Edmunds Bury Road Great Barton Suffolk
Non-material amendment to DC/19/2456/HYB - proposed change in wording to condition 23
-
DC/26/0906/VAR Awaiting decision
Land North East Of Bury St Edmunds Bury Road Great Barton Suffolk
Planning Application - variation of conditions of planning permission DC/19/2456/HYB (appeal ref: APP/F3545/W/22/3297751) to enable amendments to the approved drawings for the Phase 1 detailed element (287 dwellings), including layout and associated changes
-
DCON(T)/19/2456 Decided
Land North East Of Bury St Edmunds Bury Road Great Barton Suffolk
Application to part discharge (Part A only) condition 66 (Railway underpass reopening) for DC/19/2456/HYB (allowed at appeal AP/22/0031/STAND)
-
DCON(BGP)/26/0057 Decided
Land North East Of Bury St Edmunds Bury Road Great Barton Suffolk
Application to discharge statutory biodiversity gain plan condition in relation to DC/26/0057/FUL
-
NMA(G)/19/2456 Decided
Land North East Of Bury St Edmunds Bury Road Great Barton Suffolk
Non-material amendment to DC/19/2456/HYB - proposed change in the wording of condition 66 to allow the details of the structural and non-structural details for the underpass to be submitted prior to above ground works
-
DCON(S)/19/2456 Decided
Land North East Of Bury St Edmunds Bury Road Great Barton Suffolk
Application to discharge condition 31 (levels) of phase 1 only of application DC/19/2456/HYB
-
DCON(R)/19/2456 Granted
Land North East Of Bury St Edmunds Bury Road Great Barton Suffolk
Application to discharge condition 15 (fire hydrants) phase 1 only of DC/19/2456/HYB (allowed on appeal APP/F3545/W/22/3297751)
-
DCON(Q)/19/2456 Granted
Land North East Of Bury St Edmunds Bury Road Great Barton Suffolk
Application to discharge conditions 35 (green infrastructure and landscape) and 78 (estate road and footpath phasing) of phase 1 of application DC/19/2456/HYB
Timeline
Dates from the published record
-
15 Jun 2026
Received by West Suffolk
-
24 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 10 August 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
West Suffolk took a median of 56 days over the applications it decided in the last year.
Related applications
Cases linked to this one on the register
-
DC/19/2456/HYB Granted
Land North East Of Bury St Edmunds Bury Road Great Barton Suffolk
Hybrid Application - i) Outline application (with all matters reserved except for access) - for up to 1375 dwellings, access (including two new roundabouts onto A143 and creation of new foot and cycleway links into the site which would include new cycle/pedestrian crossings of the A143 and cycle/pedestrian link through the existing railway underpass), public open space (including buffer to Cattishall and Great Barton) and landscaping; new local centre (which could include the following uses A1; A2; A3; A4; A5; B1; D1; or D2); primary school; and associated infrastructure and works (including access roads, drainage infrastructure and substations), and ii) Planning Application - Full details for Phase 1 of the outline application for 287 dwellings (which are part of the overall up to 1375 dwelling proposal), garages, access roads, parking, open space, drainage infrastructure and associated infrastructure and works.
- Buildingcontrol: BC/26/0686/DOMIN (Initial Notice Accepted)
Who's behind it
Company information only, from the register and Companies House
Agent on file, registered in London
660 applications on PlanIndex · across 83 councils · 95% granted
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itApplicant on file
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
227 documents on file for this application
- GREAT BARTON PARISH COUNCIL - ATTACHMENT 1 - ONYX PLANNING
- GREAT BARTON PARISH COUNCIL
- GREAT BARTON PARISH COUNCIL - ATTACHMENT 1 - PLACES 4 PEOPLE
- ANGLIAN WATER
- DENSITY PLAN
- COMPLIANCE WITH DENSITY PARAMETER PLAN - WRITTEN JUSTIFICATION
- 12 ANGLESEY PLACE - COMMENTS
- VICARAGE FARM HOUSE - COMMENTS
- 14 BLACKTHORN WALK - COMMENTS
- ENVIRONMENT AGENCY
- SUFFOLK COUNTY COUNCIL - LLFA
- SENIOR ECOLOGY OFFICER
- THREE OAKS - COMMENTS
- SUFFOLK COUNTY COUNCIL - PUBLIC RIGHTS OF WAY
- LANDSCAPE OFFICER
- THREE OAKS MILL ROAD - COMMENT
- WASTE MANAGEMENT TEAM
- LANDSCAPE OFFICER
- ENERGY AND SUSTAINABILITY TEAM
- ACTIVE TRAVEL ENGLAND
- NATURAL ENGLAND
- SUFFOLK COUNTY COUNCIL - DEVELOPER CONTRIBUTIONS
- CONTAMINATED LAND AND AIR QUALITY
- SPORT ENGLAND
- ARBORICULTURAL IMPACT ASSESSMENT
- ARBORICULTURAL METHOD STATEMENT
- SHADOW HABITAT REGULATION ASSESSEMENT - PART ONE
- DESIGN STATEMENT - PART ONE
- DESIGN STATEMENT - PART TWO
- DESIGN STATEMENT - PART THREE
- DESIGN STATEMENT - PART FOUR
- BIODIVERSITY METRIC CALCULATION TOOL
- PHASE 2 DRAINAGE STRATEGY - PART ONE
- PHASE 2 DRAINAGE STRATEGY - PART TWO
- PHASE 2 DRAINAGE STRATEGY - PART THREE
- PHASE 2 DRAINAGE STRATEGY - PART FOUR
- PHASE 2 DRAINAGE STRATEGY - PART FIVE
- ENERGY AND SUSTAINABILITY APPRAISAL
- TRANSPORT STATEMENT - PART ONE
- TRANSPORT STATEMENT - PART TWO
- TRANSPORT STATEMENT - PART THREE
- SHADOW HABITAT REGULATIONS ASSESSMENT- PART TWO
- SHADOW HABITAT REGULATIONS ASSESSMENT- PART THREE
- SHADOW HABITAT REGULATIONS ASSESSMENT- PART FOUR
- SHADOW HABITAT REGULATIONS ASSESSMENT- PART FIVE
- APPLICATION FORM - WITHOUT PERSONAL DATA
- PHASE 2 - DRAINAGE LAYOUT SHEET 2 OF 5
- PHASE 2 - DRAINAGE LAYOUT - SHEET 5 OF 5
- PROPOSED PEDESTRIAN/CYCLE CROSSING FACILITIES
- PHASE 2 - DRAINAGE LAYOUT SHEET 4 OF 5
- PHASE 2 - DRAINAGE LAYOUT SHEET 5 OF 5
- PHASE 2 - CATCHMENT AREA PLAN SHEET 1 OF 5
- PHASE 2 - CATCHMENT AREA PLAN SHEET 2 OF 5
- PHASE 2 -CATCHMENT AREA SHEET 3 OF 5
- PHASE 2 - CATCHMENT AREA PLAN - SHEET 4 OF 5
- PHASE 2 - CATCHMENT AREA PLAN SHEET 5 OF 5
- PHASE 2 - DRAINAGE LAYOUT SHEET 1 OF 5
- PHASE 2 - DRAINAGE LAYOUT SHEET 2 OF 5
- PHASE 2 - DRAINAGE LAYOUT SHEET 3 OF 5
- BASIN Y7 SECTIONS
- PHASE 2 - BASIN Y5 SECTIONS
- PHASE 2 - BASIN Y4 SECTIONS
- PHASE 2 - BASIN Y3 SECTIONS
- PHASE 2 - SUDS DETAILS
- PHASE 2 - BASIN Y10 SECTIONS
- PHASE 2 - BASIN Y9 SECTIONS
- PHASE 2 - BASIN 78 SECTIONS
- PHASE 2 - SWEPT PATH ANALYSIS - REFUSE VEHICLE SHEET 1 OF 5
- PHASE 2 - SWEPT PATH ANALYSIS - REFUSE VEHICLE SHEET 2 OF 5
- PHASE 2 - SWEPT PATH ANALYSIS - REFUSE VEHICLE SHEET 3 OF 5
- PHASE 2 - SWEPT PATH ANALYSIS - REFUSE VEHICLE SHEET 4 OF 5
- PHASE 2 - SWEPT PATH ANALYSIS - REFUSE VEHICLE SHEET 5 OF 5
- PHASE 2 - SWEPT PATH ANALYSIS - ARTICULATED AND RIGID HGV
- PHASE 2 - SWEPT PATH ANALYSIS - 4000 GALLON TANKER
- PHASE 2 - CONTOURS AND LEVELS SHEET 1 OF 5
- PHASE 2 - CONTOURS AND LEVELS SHEET 2 OF 5
- PHASE 2 - CONTOURS AND LEVELS SHEET 3 OF 5
- PHASE 2 - CONTOURS AND LEVELS SHEET 4 OF 5
- PHASE 2 - CONTOURS AND LEVELS SHEET 5 OF 5
- BIODIVERSITY GAIN PLAN - POST DEVELOPMENT
- PHASE 2 - DETAILED HARD LANDSCAPING PROPOSALS
- DETAILED HARD LANDSCAPE PROPOSALS
- PHASE 2 - DETAILED HARD LANDSCAPING
- PHASE 2 - PROPOSED HARD LANDSCAPING
- PHASE 2 - PROPOSED HARD LANDSCAPING
- PHASE 2 PROPOSED HARD LANDSCAPING
- PHASE 2 - DETAILED HARD LANDSCAPING
- PHASE 2 - PROPOSED HARD LANDSCAPING
- PHASE 2 - PROPOSED SOFT LANDSCAPING
- PHASE 2 - PROPOSED SOFT LANDSCAPING
- PHASE 2 SOFT LANDSCAPING PROPOSALS
- PHASE 2 SOFT LANDSCAPING PROPOSALS
- PHASE 2 SOFT LANDSCAPING PROPOSALS
- PHASE 2 SOFT LANDSCAPING PROPOSALS
- PHASE 2 SOFT LANDSCAPING PROPOSALS
- PHASE 2 SOFT LANDSCAPING PROPOSALS
- PHASE 2 - LANDSCAPE MASTER PLAN
- PHASE 2 - BUILDING HEIGHTS PLAN
- PHASE 2 - AFFORDABLE HOUSING PLAN
- PHASE 2 - WALKING AND CYCLING STRATEGY PLAN
- PHASE 2 - ACCESSIBLE HOUSING PLAN
- PHASE 2 - PREDOMINANT MATERIALS PLAN
- PHASE 2 - SITE LAYOUT
- PHASE 2 - BOUNDARIES TREATMENT PLAN
- SITE LOCATION PLAN
- PHASE 2 - CHARACTER AREAS PLAN
- PHASING PLAN
- PHASE 2 SITE LAYOUT
- EXISTING SITE PLAN - PHASE 2
- PHASE 2 - PARKING STRATEGY PLAN
- PHASE 2 - REFUSE STRATEGY PLAN
- PHASE 2 - MOVEMENT STRATEGY PLAN
- ILLUSTRATIVE STREET SCENES (B-BB, D-DD)
- PHASE 2 - ILLUSTRATIVE STREET SCENES (A-AA,C-CC)
- SITE PLAN - PROPOSED LOCAL CENTRES
- PROPOSED LOCAL CENTRE SOUTH - FLOOR PLANS
- PROPOSED LOCAL CENTRE SOUTH - FLOOR AND ROOF PLANS
- PROPOSED LOCAL CENTRE NORTH - FLOOR PLANS
- PROPOSED LOCAL CENTRE NORTH - FLOOR AND ROOF PLANS PLANS
- PROPOSED LOCAL CENTRE SOUTH - ELEVATIONS
- PHASE 2 PROPOSED LOCAL CENTRE SOUTH - ELEVATIONS
- PHASE 2 PROPOSED LOCAL CENTRE NORTH - ELEVATIONS
- PROPOSED LOCAL CENTRE NORTH - ELEVATIONS
- PHASE 2 PLOTS 205 206 PROPOSED FLOOR PLANS
- PHASE 2 - PLOTS 161-171,172-182 - BLOCK C - ELEVATIONS
- PHASE 2 - PLOTS 161-171,172-182 - BLOCK C - FLOOR PLANS
- PHASE 2 - BLOCK D - PROPOSED ELEVATIONS
- PHASE 2 - PLOTS 120-130 - BLOCK D - FLOOR PLANS
- PHASE 2 - BLOCK B - PROPOSED FLOOR PLANS
- PHASE 2 - PLOTS 28-36,63-71 - BLOCK B - ELEVATIONS
- PHASE 2 - BLOCK A - PROPOSED ELEVATIONS
- PHASE 2 - BLOCK A - PROPOSED FLOOR PLANS
- PHASE 2 - PLOTS 196,197,203,204,207,208 - CA1 END BRICK TILE - ELEVATIONS
- PHASE 2 - PLOTS 196,197,198,199,200,202,203,204,207,208 - CA1 356 END - FLOOR PLANS
- PHASE 2 - PLOT 201- CA1 356 MID RENDER TILE - ELEVATIONS
- PHASE 2 - PLOT 201- CA1 356 MID - FLOOR PLANS
- PHASE 2 - PLOTS 198,199,200,202- CA1 356 END RENDER TILE - ELEVATIONS
- PHASE 2 - PLOTS 87,187 - CA2 AFF 341 SEMI BRICK TILE - ELEVATIONS AND FLOOR PLANS
- PHASE 2 - PLOTS 153,157- CA2 AFF 242 SEMI BRICK TILE - ELEVATIONS AND FLOOR PLANS
- PHASE 2 - PLOTS 88,152,156,188 - CA2 AFF 236 SEMI BRICK TILE - ELEVATIONS AND FLOOR PLANS
- PHASE 2 - PLOTS 205,206 - CA1 471 DET RENDER TILE - ELEVATIONS
- PHASE 2 - PLOTS 83,84,193,195 - CA2 AFF 352 END BRICK TILE - ELEVATIONS
- PHASE 2 - PLOTS 91,104,151 - CA2 231 DET BRICK TILE - ELEVATIONS AND FLOOR PLANS
- PHASE 2 - PLOTS 27,82,90,103,141,150 - CA2 231DET BRICK TILE - ELEVATIONS AND FLOOR PLANS
- PHASE 2 - PLOTS 85,86 CA2 AFF 463 SEMI BRICK TILE - ELEVATIONS
- PHASE 2 - PLOTS 85,86 CA2 AFF 463 SEMI BRICK TILE - FLOOR PLANS
- PHASE 2 - PLOT 194 CA2 AFF 352 MID BRICK TILE - ELEVATIONS
- PHASE 2 - PLOT 194 CA2 AFF 352 MID BRICK TILE - FLOOR PLANS
- PHASE 2 - PLOTS 154,155,189,190,191,192 CA2 AFF 361 SEMI - FLOOR PLANS
- PHASE 2 - PLOTS 83,84,193,195 CA2 AFF 352 END - FLOOR PLANS
- PHASE 2 - PLOTS 209,210 CA2 232 SEMI BRICK TILE - ELEVATIONS AND FLOOR PLANS
- PHASE 2 - PLOT 107 CA2 361 DET BRICK TILE - ELEVATIONS AND FLOOR PLANS
- PHASE 2 - PLOTS 217,218 CA3 356 SEMI - FLOOR PLANS
- PHASE 2 - PLOTS 217,218 CA2 356 SEMI RENDER- ELEVATIONS
- PHASE 2 - PLOTS 58,105,106 CA2 355 DET BRICK TILE - ELEVATIONS AND FLOOR PLANS
- PHASE 2 - PLOT 61 CA2 354 DET RENDER - ELEVATIONS AND FLOOR PLANS
- PHASE 2 - PLOTS 21,22,96,108,144,147 CA2 354 DET BRICK TILE - FLOOR PLANS
- PHASE 2 - PLOTS 94,95,99,100,213,214,215,216,219,220 CA2 352 SEMI BRICK TILE - FLOOR PLANS
- PHASE 2 - PLOTS 16,17,20,40,221 CA2 341 SEMI BRICK TILE - ELEVATIONS AND FLOOR PLANS
- PHASE 2 - PLOTS 37,97,98,211,212 CA2 242 SEMI BRICK TILE - ELEVATIONS AND FLOOR PLANS
- PHASE 2 - PLOTS 15,18,19,38,39,222 CA2 236 SEMI BRICK TILE - ELEVATIONS AND FLOOR PLANS
- PHASE 2 - PLOTS 50,51,56,57 CA3 235 AFF SEMI BRICK - ELEVATIONS
- PHASE 2 - PLOTS 44,46 CA3 356 AFF END - FLOOR PLANS
- PHASE 2 - PLOTS 50,51,56,57 CA3 235 AFF SEMI BRICK - FLOOR PLANS
- PHASE 2 - PLOTS 50,51,56,57 CA3 235 AFF SEMI BRICK - FLOOR PLANS
- PHASE 2 - PLOTS 52,53,54,55 CA3 AFF 343 SEMI RENDER PANTILE - ELEVATIONS
- PHASE 2 - PLOTS 52,53,54,55 CA3 AFF 343 SEMI - FLOOR PLANS
- PHASE 2 - PLOTS92,93 CA3 361 SEMI RENDER TILE - ELEVATIONS
- PHASE 2 - PLOTS 92,93,142,143,145,146,148,149,183,184,185,186 CA2 361 SEMI - FLOOR PLANS
- PHASE 2 - PLOTS 142,143,145,146,148,149,183,184,185,186 CA2 361 SEMI BRICK TILE - ELEVATIONS
- PHASE 2 - PLOT 45 CA3 AFF 356 MID BRICK PANTILE - ELEVATIONS
- PHASE 2 - PLOTS 23,26 CA3 356 END BRICK TILE - ELEVATIONS
- PHASE 2 - PLOTS 42,43,72,73,77,78,131,132,139,140 CA3 356 SEMI - FLOOR PLANS
- PHASE 2 - PLOTS 41,59,60,101 CA3 354 DET BRICK TILE - ELEVATIONS AND FLOOR PLANS
- PHASE 2 - PLOT 62 CA3 355 DET BRICK PANTILE - ELEVATIONS AND FLOOR PLANS
- PHASE 2 - PLOTS 42,43,72,73 CA3 356 SEMI RENDER PANTILE - ELEVATIONS
- PHASE 2 - PLOTS 77,78,131,132,139,140 CA3 356 SEMI RENDER TILE - ELEVATIONS
- PHASE 2 - PLOT 47 CA3 236 SEMI RENDER TILE - ELEVATIONS AND FLOOR PLANS
- PHASE 2 - PLOT 48 CA3 341 SEMI RENDER TILE - ELEVATIONS AND FLOOR PLANS
- PHASE 2 - PLOTS 74,76,79,81,133,135,136,138 CA3 356 END BRICK PANTILE RENDER TILE - ELEVATIONS
- PHASE 2 - PLOT 45 CA3 356 MID - FLOOR PLANS
- PHASE 2 - PLOTS 49,102 CA3 466 DET BRICK TILE - ELEVATIONS AND FLOOR PLANS
- PHASE 2 - PLOTS 49,102 CA3 466 DET BRICK TILE - ELEVATIONS AND FLOOR PLANS
- PHASE 2 - GARAGE - SINGLE
- PHASE 2 - 158,160 CA1 AFF 356 END BRICK TILE - ELEVATIONS
- PHASE 2 - 158,160 CA1 AFF 356 END - FLOOR PLANS
- PHASE 2 - PLOT 159 CA1 AFF 356 MID- BRICK TILE - ELEVATIONS
- PHASE 2 - PLOTS 24,25,75,80,134,137 CA3 356 MID - FLOOR PLANS
- PHASE 2 - PLOTS ,75,80,134,137 CA3 356 MID BRICK PANTILE - ELEVATIONS
- PHASE 2 - PLOT 159 CA1 356 MID - FLOOR PLANS
- PHASE 2 - PLOTS 23,26,74,76,79,81,133,135,136,138 CA3 356 END - FLOOR PLANS
- PHASE 2 - PLOTS 24,25 CA3 356 MID BRICK TILE - ELEVATIONS
- PHASE 2 - EXCEEDENCE FLOW PATH - SHEET 1 OF 5
- PHASE 2 - EXCEEDENCE FLOW PATH - SHEET 2 OF 5
- PHASE 2 - EXCEEDENCE FLOW PATH SHEET 3 OF 5
- PHASE 2 - EXCEEDENCE FLOW PATH SHEET 4 OF 5 REV F03
- PHASE 2 - EXCEEDENCE FLOW PATH - SHEET 5 OF 5
- PHASE 2 - SWEPT PATH ANALYSIS - FIRE TENDER SHEET 1 OF 5
- PHASE 2 - SWEPT PATH ANALYSIS - FIRE TENDER SHEET 2 OF 5
- PHASE 2 - SWEPT PATH ANALYSIS - FIRE TENDER SHEET 3 OF 5
- PHASE 2 - SWEPT PATH ANALYSIS - FIRE TENDER SHEET 4 OF 5
- PHASE 2 - SWEPT PATH ANALYSIS - FIRE TENDER SHEET 5 OF 5
- PHASE 2 - VISIBILITY SPLAYS SHEET 1 OF 5
- PHASE 2 - VISIBILITY SPLAYS SHEET 2 OF 5
- PHASE 2 - VISIBILITY SPLAYS SHEET 3 OF 5
- PHASE 2 - VISIBILITY SPLAYS SHEET 4 OF 5
- PHASE 2 - VISIBILITY SPLAYS SHEET 5 OF 5
- PHASE 2 - HIGHWAY EXTENT SHEET 1 OF 5
- PHASE 2 - HIGHWAY EXTENT SHEET 2 OF 5
- PHASE 2 - HIGHWAY EXTENT SHEET 3 OF 5
- PHASE 2 - HIGHWAY EXTENT SHEET 4 OF 5
- PHASE 2 - HIGHWAY EXTENT SHEET 5 OF 5
- PHASE 2 - STREET LIGHTING LAYOUT SHEET 1 OF 5
- PHASE 2 - STREET LIGHTING LAYOUT SHEET 2 OF 5
- PHASE 2 - STREET LIGHTING LAYOUT SHEET 3 OF 5
- PHASE 2 - STREET LIGHTING LAYOUT SHEET 4 OF 5
- PHASE 2 - STREET LIGHTING LAYOUT SHEET 5 OF 5
- PHASE 2 - BIODIVERSITY GAIN PLAN
- BIODIVERSITY STATEMENT
- GREEN INFRASTRUCTURE AND LANDSCAPE STRATEGY
- SCHEDULE OF ACCOMMODATION
- PROPOSED RETAIL AND NURSERY INFORMATION
- PROPOSED LOCAL CENTRES - ADDITIONAL INFORMATION
- FRONT COVER - HOUSING TYPE PACK
- NOISE IMPACT ASSESSMENT
- ENVIRONMENTAL STATEMENT OF CONFORMITY
- PLANNING COMPLIANCE STATEMENT AND AFFORDABLE HOUSING STATEMENT
Trade members open them from here.
Open the documentsWhat happens while it is decided
This application is with West Suffolk for determination, against a statutory target of eight weeks. Over the last year West Suffolk's median decision took 56 days. More in our guide to how long planning decisions take.
About reserved matters applications
A reserved matters application fills in the detail held back from an earlier outline permission, judged against that permission rather than the principle of development. More in our guide to planning application types.
Other reserved matters applications
In West Suffolk
-
DC/25/1780/RM Granted
Former Stanton Community Primary School Bury Lane Stanton Bury St Edmunds Suffolk IP31 2AW
Reserved matters application - submission of details under outline planning permission DC/23/1443/OUT - a. the appearance, landscaping, layout and scale - for the construction of seven dwellings, access, parking and new ramped access, b. details reserved by conditions 4 (building materials), 7 (estate road and footpath details), 9 (off-site highway improvements), 12 (cycle storage),13 (bin storage and collection),14 (Construction Management Plan),15 (native species planting),16 (arboricultural method statement), 19 (construction environmental management plan), 20 (biodiversity enhancement strategy), 21 (construction method statement), 22 (lighting for biodiversity), 24 (drainage) and 26 (contamination remediation) of outline planning permission DC/23/1443/OUT
-
DC/25/1990/RM Granted
Land Ne Haverhill English Way Haverhill Suffolk
Reserved matters application - a. submission of details under outline planning permission DC/15/2151/OUT - means of access, appearance, landscaping, layout and scale for 250 dwellings (including 72 affordable) (parcels A14; and A15); allotments (parcel E2); associated internal roads, car parking, amenity and public open space; pumping station and diversion of overhead HV cable; b. including application to partially discharge conditions 4; 6; 7; 8; 9; 15; 28; 30; 37; 38; and 44
-
DC/26/0091/RM Granted
Plot Cedar House 168 Westley Road Bury St Edmunds Suffolk
Reserved matters application - a. submission of details under outline planning DC/22/1540/OUT appearance, landscaping, layout and scale for one dwelling b. discharge of conditions 5, (materials), 6 (Parking/Manoeuvring Details), 7 (Secure Cycle Storage), 8 (Visibility Splays), 9 (soft landscaping), 10 (hard landscaping), 11 (boundary treatments), 16 (CEMP Biodiversity), 17 (Biodiversity Enhancement Strategy) and 18 (lighting design scheme for biodiversity).
-
DC/25/1988/RM Granted
Parcel A9 Land North Of Haverhill Haverhill Suffolk
Reserved matters application - a. submission of details under outline planning permission DC/15/2151/OUT - means of access, appearance, landscaping, layout and scale for 95 dwellings (including 42 affordable) (parcel A9); associated internal roads, car parking, amenity and public open space and diversion of overhead HV cable and b. including application to partially discharge conditions 4, 6, 7, 8, 9, 15, 28, 30, 37, 38 and 44 of DC/15/2151/OUT
-
DC/26/0647/RM Awaiting decision
West Suffolk Hospital Hardwick Lane Bury St Edmunds Suffolk
Reserved Matters Application - Submission of details under DC/22/0593/HYB - the means of appearance, landscaping, layout and scale for new hospital (Class C2), including car parking, associated infrastructure, structural landscape buffer, temporary construction compound and demolition of existing hospital buildings