Planning application

Parcel 1 & 2 (Phase 4A) Land Off Neil Fox Way City Fields Wakefield

Awaiting decision Wakefield 23/01153/SUB06

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Discharge of Conditions 22 (Estate Roads), 23 (External Lighting), 24 (Footpaths) and 42 (Substation Design) from approved application 23/01153/FUL

As published by the council, reference 23/01153/SUB06

Application record

Reference
23/01153/SUB06
Status
Awaiting decision
Received
3 Jul 2026
Validated
21 Aug 2026

Site history

Applications at this address on the Wakefield register

This site has had 8 applications since 2026.

  • 23/01153/SUB08 Awaiting decision

    Parcel 1 & 2 (Phase 4A) Land Off Neil Fox Way City Fields Wakefield

    Re-discharge of Condition 30 (Boundary Treatments) from approved application 23/01153/FUL

    Submitted 25 Aug 2026
  • 23/01153/SUB07 Decided

    Parcel 1 & 2 (phase 4A) Land Off Neil Fox Way City Fields Wakefield

    Discharge of Condition 3 (S106 agreement) from approved application 23/01153/FUL

    Decided 8 Sep 2026
  • 23/01153/SUB05 Decided

    Parcel 1 & 2 (Phase 4A) Land Off Neil Fox Way City Fields Wakefield

    Discharge of Condition 10 (Construction Methodology - Network Rail) from approved application 23/01153/FUL

    Decided 8 Jul 2026
  • 23/01153/NMC04 Decided

    Parcel 1 & 2 (Phase 4A) Land Off Neil Fox Way City Fields Wakefield

    Non-material amendment to approved application 23/01153/FUL dated 31.01.2025 (Full planning application for 80 residential units (C3), associated car parking, garages; vehicular, pedestrian and cycle access and infrastructure; foul and surface water drainage infrastructure; public open space with play area and landscape and biodiversity enhancements; with vehicular access from Neil Fox Way varied by 23/01153/NMC01 and 23/01153/NMC02 comprising the re-siting of the proposed substation to the turning head adjacent to plot 47 and associated landscape details together with the variation of conditions 2 (approved plans); 27 (overheating); 32 (access), 39 (turning facilities) and 41 (engineering strategy) to insert revised plans.

    Decided 27 Aug 2026
  • 23/01153/SUB04 Awaiting decision

    Parcel 1 & 2 (Phase 4A) Land Off Neil Fox Way City Fields Wakefield

    Discharge of Conditions 14 (Habitat Management and Monitoring Plan), 15 (Piling), 19 (Gas and Radon Protection), 27 (Noise and Overheating), 28 (Noise Mitigation) and 29 (Cycle Storage) from approved application 23/01153/FUL

    Submitted 8 Apr 2026 Conditions
  • 23/01153/SUB03 Awaiting decision

    Parcel 1 & 2 (Phase 4A) Land Off Neil Fox Way City Fields Wakefield

    Discharge of Conditions 4 (Construction Environmental Management Plan), 5 (Construction Environmental Management Plan - Dust), 6 (Control of Construction Site Noise), 7 (Construction Environmental Management Plan - Biodiversity), 8 (Materials and Waste Management Plan), 9 (Soil Management Plan and Earthworks Specification), 11 (Temporary Surface Water Drainage), 18 (Materials - Retaining Walls), 25 (Renewables), 26 (External Materials - Dwellings and Boundary Walls) and 31 (Ecological Mitigation Plan) from approved application 23/01153/FUL

    Submitted 23 Mar 2026 Conditions
  • 23/01153/SUB02 Awaiting decision

    Parcel 1 & 2 (Phase 4A) Land Off Neil Fox Way City Fields Wakefield

    Discharge of Conditions 12 (Foul and Surface Water Drainage), 13 (Flood Routes), 16 (Levels), 17 (Highway Structures), 20 (Tree Protection) and 21 (Tree Pits) from approved application 23/01153/FUL

    Submitted 19 Feb 2026 Conditions

Timeline

Dates from the published record

  1. 3 Jul 2026

    Received by Wakefield

  2. 21 Aug 2026

    Validated

    Checked as complete and ready for consideration.

  3. 28 Aug 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 16 October 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Wakefield took a median of 63 days over the applications it decided in the last year.

What happens while it is decided

This application is with Wakefield for determination, against a statutory target of eight weeks. Over the last year Wakefield's median decision took 63 days. More in our guide to how long planning decisions take.

About this record

The published feed does not state which type of application this is; the register entry on Wakefield's portal will say. Our guide explains the common types.