Planning application
26/01289/FUL
146 Park Lodge Lane Wakefield WF1 4HZ
Proposal
Part single part two storey extension to rear, porch to front, summer house and pagoda to rear
As published by the council, reference 26/01289/FUL
Timeline
Dates from the published record
-
20 Jul 2026
Received by Wakefield
-
30 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.
What happens while it is decided
The process from here
This application is with Wakefield for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
26/00918/GPD Granted
146 Park Lodge Lane Wakefield WF1 4HL
Single storey rear extension with a maximum projection of 6.0m, a maximum height of 4.0m and a maximum eaves height of 2.6m
-
11/01660/FUL Granted
16 Malham Square Wakefield West Yorkshire WF1 4HW
First floor extension to side
-
23/01153/SUB04 Awaiting decision
Parcel 1 & 2 (Phase 4A) Land Off Neil Fox Way City Fields Wakefield
Discharge of Conditions 14 (Habitat Management and Monitoring Plan), 15 (Piling), 19 (Gas and Radon Protection), 27 (Noise and Overheating), 28 (Noise Mitigation) and 29 (Cycle Storage) from approved application 23/01153/FUL
-
23/01153/SUB05 Decided
Parcel 1 & 2 (Phase 4A) Land Off Neil Fox Way City Fields Wakefield
Discharge of Condition 10 (Construction Methodology - Network Rail) from approved application 23/01153/FUL
-
23/01153/SUB03 Awaiting decision
Parcel 1 & 2 (Phase 4A) Land Off Neil Fox Way City Fields Wakefield
Discharge of Conditions 4 (Construction Environmental Management Plan), 5 (Construction Environmental Management Plan - Dust), 6 (Control of Construction Site Noise), 7 (Construction Environmental Management Plan - Biodiversity), 8 (Materials and Waste Management Plan), 9 (Soil Management Plan and Earthworks Specification), 11 (Temporary Surface Water Drainage), 18 (Materials - Retaining Walls), 25 (Renewables), 26 (External Materials - Dwellings and Boundary Walls) and 31 (Ecological Mitigation Plan) from approved application 23/01153/FUL
-
23/01153/SUB02 Awaiting decision
Parcel 1 & 2 (Phase 4A) Land Off Neil Fox Way City Fields Wakefield
Discharge of Conditions 12 (Foul and Surface Water Drainage), 13 (Flood Routes), 16 (Levels), 17 (Highway Structures), 20 (Tree Protection) and 21 (Tree Pits) from approved application 23/01153/FUL
Other full applications applications
In Wakefield
-
26/00816/FUL Withdrawn
Former Kings Way Christian Centre Priory Road Ossett West Yorkshire WF5 8QL
Demolition of the former Kings Way Christian Centre and associated land, followed by the erection of a block of 5no. terraced dwellings.
-
26/01336/FUL Awaiting decision
18 Trent Avenue Altofts Normanton WF6 2ST
Single storey extension to rear.
-
26/00911/FUL Granted
Chevet House 1 Lodge Lane Newmillerdam Wakefield WF2 6PX
Erection of two storey side extension with underground basement
-
26/00883/FUL Granted
28 Sowood Lane Ossett Wakefield WF5 0LE
Raising ridge height for loft accommodation with associated front extension and external alterations including bay window to front and Juliet balcony to rear
-
26/00454/FUL Granted
7 John Street Wakefield WF1 4PN
First floor extension to side, dormers to front and raising of roof height to create habitable rooms in roofspace.