Proposal
Discharge of Conditions 4 (Construction Environmental Management Plan), 5 (Construction Environmental Management Plan - Dust), 6 (Control of Construction Site Noise), 7 (Construction Environmental Management Plan - Biodiversity), 8 (Materials and Waste Management Plan), 9 (Soil Management Plan and Earthworks Specification), 11 (Temporary Surface Water Drainage), 18 (Materials - Retaining Walls), 25 (Renewables), 26 (External Materials - Dwellings and Boundary Walls) and 31 (Ecological Mitigation Plan) from approved application 23/01153/FUL
As published by the council, reference 23/01153/SUB03
Application record
- Reference
- 23/01153/SUB03
- Type
- Discharge of Conditions Request
- Status
- Awaiting decision
- Received
- 23 Mar 2026
- Validated
- 28 Apr 2026
- Ward
- Wakefield East
- Postcode
- WF1 4HZ
Site history
Applications at this address on the Wakefield register
This site has had 8 applications since 2026.
-
23/01153/SUB08 Awaiting decision
Parcel 1 & 2 (Phase 4A) Land Off Neil Fox Way City Fields Wakefield
Re-discharge of Condition 30 (Boundary Treatments) from approved application 23/01153/FUL
-
23/01153/SUB07 Decided
Parcel 1 & 2 (phase 4A) Land Off Neil Fox Way City Fields Wakefield
Discharge of Condition 3 (S106 agreement) from approved application 23/01153/FUL
-
23/01153/SUB06 Awaiting decision
Parcel 1 & 2 (Phase 4A) Land Off Neil Fox Way City Fields Wakefield
Discharge of Conditions 22 (Estate Roads), 23 (External Lighting), 24 (Footpaths) and 42 (Substation Design) from approved application 23/01153/FUL
-
23/01153/SUB05 Decided
Parcel 1 & 2 (Phase 4A) Land Off Neil Fox Way City Fields Wakefield
Discharge of Condition 10 (Construction Methodology - Network Rail) from approved application 23/01153/FUL
-
23/01153/NMC04 Decided
Parcel 1 & 2 (Phase 4A) Land Off Neil Fox Way City Fields Wakefield
Non-material amendment to approved application 23/01153/FUL dated 31.01.2025 (Full planning application for 80 residential units (C3), associated car parking, garages; vehicular, pedestrian and cycle access and infrastructure; foul and surface water drainage infrastructure; public open space with play area and landscape and biodiversity enhancements; with vehicular access from Neil Fox Way varied by 23/01153/NMC01 and 23/01153/NMC02 comprising the re-siting of the proposed substation to the turning head adjacent to plot 47 and associated landscape details together with the variation of conditions 2 (approved plans); 27 (overheating); 32 (access), 39 (turning facilities) and 41 (engineering strategy) to insert revised plans.
-
23/01153/SUB04 Awaiting decision
Parcel 1 & 2 (Phase 4A) Land Off Neil Fox Way City Fields Wakefield
Discharge of Conditions 14 (Habitat Management and Monitoring Plan), 15 (Piling), 19 (Gas and Radon Protection), 27 (Noise and Overheating), 28 (Noise Mitigation) and 29 (Cycle Storage) from approved application 23/01153/FUL
-
23/01153/SUB02 Awaiting decision
Parcel 1 & 2 (Phase 4A) Land Off Neil Fox Way City Fields Wakefield
Discharge of Conditions 12 (Foul and Surface Water Drainage), 13 (Flood Routes), 16 (Levels), 17 (Highway Structures), 20 (Tree Protection) and 21 (Tree Pits) from approved application 23/01153/FUL
Timeline
Dates from the published record
-
23 Mar 2026
Received by Wakefield
-
28 Apr 2026
Validated
Checked as complete and ready for consideration.
-
22 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 23 June 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Wakefield took a median of 63 days over the applications it decided in the last year.
Related applications
Cases linked to this one on the register
- Application: 23/01153/FUL (Decided)
Documents
Plans, drawings, consultee responses and the officer's report
49 documents on file for this application
- TEMPORARY SURFACE WATER STRATEGY STAGE 1
- TEMPORARY SURFACE WATER STRATEGY STAGE 2
- TEMPORARY SURFACE WATER STRATEGY STAGE 3
- TEMPORARY SURFACE WATER STRATEGY STAGE 1
- TEMPORARY SURFACE WATER STRATEGY STAGE 2
- TEMPORARY SURFACE WATER STRATEGY STAGE 3
- CONSTRUCTION ENVIRONMENTAL MANAGEMENT PLAN - REMEDIATION & ENABLING PHASE
- CONSTRUCTION MANAGEMENT PLAN
- WAKEFIELD COUNCIL DRAINAGE
- CLADDING MATERIAL STATEMENT
- RETAINING WALLS AND EXTERNAL MATERIALS LAYOUT
- CHARACTER AREAS AND MATERIALS LAYOUT
- BOUNDARY TREATMENT LAYOUT
- WAKEFIELD COUNCIL ECOLOGIST
- BOUNDARY TREATMENT LAYOUT
- APPLICANT RESPONSE TO DRAINAGE COMMENTS
- SUSTAINABILITY & CLIMATE CHANGE STATEMENT
- WAKEFIELD COUNCIL DRAINAGE
- BOUNDARY TREATMENT LAYOUT
- BOUNDARY TREATMENT DETAILS
- CHARACTER AREAS AND MATERIALS LAYOUT
- RETAINING WALLS AND EXTERNAL MATERIALS LAYOUT
- CEMP - REMEDIATION & ENABLING PHASE
- TEMPORARY DRAINAGE CALCULATIONS
- RESPONSE TO DRAINAGE COMMENTS
- TEMPORARY SURFACE WATER DRAINAGE STAGE 1
- TEMPORARY SURFACE WATER DRAINAGE STAGE 2
- TEMPORARY SURFACE WATER DRAINAGE STAGE 3
- CONSTRUCTION MANAGEMENT PLAN
- CHARACTER AREAS AND MATERIALS LAYOUT
- PROPOSED SITE LAYOUT
- BOUNDARY TREATMENT LAYOUT
- RETAINING WALLS AND EXTERNAL MATERIALS LAYOUT
- HIGHWAYS DEVELOPMENT MANAGEMENT WAKEFIELD COUNCIL
- PLANNING CONSULATION OFFICER NOISE
- BOUNDARY TREATMENT LAYOUT
- RETAINING WALLS AND EXTERNAL MATERIALS LAYOUT
- CHARACTER AREAS AND MATERIALS LAYOUT
- CONSTRUCTION MANAGEMENT PLAN
- WAKEFIELD COUNCIL DRAINAGE
- LAND QUALITY WAKEFIELD COUNCIL
- CONSTRUCTION ENVIRONMENTAL MANAGEMENT PLAN ? REMEDIATION & ENABLING PHASE
- HIGHWAYS DEVELOPMENT MANAGEMENT WAKEFIELD COUNCIL
- CONSTRUCTION ENVIRONMENTAL MANAGEMENT PLAN - REMEDIATION & ENABLING PHASE
- CONSTRUCTION MANAGEMENT PLAN
- SUSTAINABILITY & CLIMATE CHANGE STATEMENT
- BOUNDARY TREATMENT LAYOUT
- RETAINING WALLS AND EXTERNAL MATERIALS LAYOUT
- ECOLOGICAL MITIGATION PLAN
- CHARACTER AREAS AND MATERIALS LAYOUT
- APPLICATIONFORMREDACTED
- METHOD STATEMENT AND RISK ASSESSMENT RISK MATRIX
- CONSTRUCTION ENVIRONMENTAL MANAGEMENT PLAN (BIODIVERSITY)
- CONSTRUCTION MATERIAL & WASTE MANAGEMENT PLAN
- TEMPORARY SURFACE WATER STRATEGY
- EARTHWORKS SPECIFICATION & SOIL MANAGEMENT PLAN
- MATERIALS MANAGEMENT PLAN (MMP) FORM
Trade members open them from here.
Open the documentsWhat happens while it is decided
This application is with Wakefield for determination, against a statutory target of eight weeks. Over the last year Wakefield decided condition discharge and variation applications in a median of 102 days. More in our guide to how long planning decisions take.
About condition discharge and variation applications
This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
Parcel 1 & 2 (Phase 4A) Land Off Neil Fox Way City Fields Wakefield
100% historically approved · decision due ~10 Jun
Discharge of Conditions 14 (Habitat Management and Monitoring Plan), 15 (Piling), 19 (Gas and Radon Protection), 27 (Noise and Overheating), 28 (Noise Mitigation) and 29 (Cycle Storage) from approved application 23/01153/FUL
Awaiting decision Conditions 44 docs -
Parcel 1 & 2 (Phase 4A) Land Off Neil Fox Way City Fields Wakefield
100% historically approved · decision due ~16 Apr
Discharge of Conditions 12 (Foul and Surface Water Drainage), 13 (Flood Routes), 16 (Levels), 17 (Highway Structures), 20 (Tree Protection) and 21 (Tree Pits) from approved application 23/01153/FUL
Awaiting decision Conditions Trees 63 docs -
94 Linton Road Wakefield WF1 4HJ
Single storey side extension
Granted Lawful development Extension 5 docsSmall domestic -
16 Malham Square Wakefield West Yorkshire WF1 4HW
First floor extension to side
Granted Full applications Extension 6 docs -
5 Litton Croft Wakefield WF1 4JW
51% historically approved · decision due ~5 Nov
1 Maple Tree - Crown Reduce to achieve a maximum 2metre clearance between the branch tips and the adjacent building. Crown Lift to achieve a maximum clearance of 5metres to the surrounding floor level.
Awaiting decision Trees 2 docs -
146 Park Lodge Lane Wakefield WF1 4HL
Single storey rear extension with a maximum projection of 6.0m, a maximum height of 4.0m and a maximum eaves height of 2.6m
Decided Extension 1 docSmall domestic
Other condition discharge and variation applications
In Wakefield
-
25/00814/SUB01 Granted
The Lodge 475 Barnsley Road Newmillerdam Wakefield WF2 6BN
Discharge of Condition 3 (Materials), Condition 4 (Arboricultural Method Statement), Condition 5 (Chimney) from approved application 25/00814/FUL
-
23/00100/SUB21 Granted
Former Coal Yard, Ferrybridge 'C' Power Station Ferrybridge Kirkhaw Lane Knottingley
Application to Discharge Condition 18 (Biodiversity Retention Enhancement Scheme) for Phase 4 (S278 Highways Works) and Zone B of Planning Permission 23/00100/S7301
-
23/00100/SUB20 Granted
Former Coal Yard, Ferrybridge 'C' Power Station Ferrybridge Kirkhaw Lane Knottingley
Application to Discharge Condition 19 (Landscape and Ecological Management Plan) for works that relate the S278 (highway works) of Planning Permission 23/00100/S7301
-
23/02273/SUB01 Granted
Fir Tree Farm House Hall Lane North Elmsall Pontefract WF9 2DZ
Discharge of conditions 3 (Archaeology Written Statement of Investigation), 4 (Finished Floor Levels), 5 (Materials and Finishes), 6 (Foul and Surface Water Drainage), 7 (Radon Protection Measures) and 8 (Site Investigation and Remediation) from approved application 23/02273/FUL
-
24/00231/SUB26 Granted
Land Rear Of Park Balk Farm Womersley Road Knottingley WF11 0DQ
Discharge of condition 16 (Construction Management Plan) from approved application 24/00231/FUL.