Planning application
Stroudwater Canal Phase 1B Eastington Gloucestershire
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Discharge of condition 19 (M5 detailed design) for Phase 10 from S.24/2311/VAR.
As published by the council, reference S.26/0081/DISCON
Application record
- Reference
- S.26/0081/DISCON
- Type
- Discharge of Condition
- Status
- Permitted
- Decision
- Granted As published: Permitted
- Received
- 14 Jan 2026
- Validated
- 21 Jan 2026
- Decided
- 13 May 2026
- Ward
- Severn Ward
- Parish
- Eastington Parish Council
- Decision by
- DELEGATED
Site history
Applications at this address on the Stroud register
This site has had 17 applications since 2021: 16 approved, 0 refused.
-
S.26/0130/DISCON Granted
Stroudwater Canal Phase 1B Eastington Gloucestershire
Discharge of condition 14 (Construction Surface Water Management Plan) for Phase 10 from S.24/2311/VAR.
-
S.26/0143/VAR Granted
Stroudwater Canal Phase 1B Eastington Gloucestershire
Variation of conditions 21 and 22 to remove drainage requirement for the M5 bridge and amend temporary western site access, remove Eastern access and remove drainage requirement for the M5 bridge from S.24/2311/VAR - Reinstatement of the 'Missing Mile' section of the Stroudwater Navigation and development of associated infrastructure including locks, mooring basin, car parking, cafe and leisure facilities building with combined office and residence for basin manager.
-
S.25/2466/DISCON Granted
Stroudwater Canal Phase 1B Eastington Gloucestershire
Discharge of condition 32 (flood mitigation) from S.24/1595/VAR. (Site wide).
-
S.25/2313/DISCON Granted
Stroudwater Canal Phase 1B Eastington Gloucestershire
Discharge of condition 14 (Construction Surface Water Management Plan) for Phases 1c, 3, 4a, 4b, 5, 7, 8 and 12 from S.24/2311/VAR.
-
S.25/2109/TCA Granted
Stroudwater Canal Phase 1B Eastington Gloucestershire
Trees to be felled: T1 - 2 x 15m crack willow & 1 x 12m crack willow - bramble scrub. T2 - 2 x 12m crack willow & bramble scrub. T3 - 3 x 10m & 4 x 8m crack willow & scrub. T4 - 12m crack willow 4 trunks from one base.
-
S.25/2078/DISCON Granted
Stroudwater Canal Phase 1B Eastington Gloucestershire
Discharge of condition 14 (Construction Surface Water Management Plan) for Phase 1a from S.24/2311/VAR.
-
S.25/0252/DISCON Granted
Stroudwater Canal Phase 1B Eastington Gloucestershire
Discharge of condition 7 (canal channel bank design) for Phase 5 and 12 from S.26/0143/VAR.
-
S.24/1947/DISCON Granted
Stroudwater Canal Phase 1B Eastington Gloucestershire
Discharge of condition 43 (construction hours) for Phases 1a, 1c, 3 and 11 only from the application S.19/0291/FUL.
-
S.24/1925/DISCON Granted
Stroudwater Canal Phase 1B Eastington Gloucestershire
Discharge of condition 11 (ecology mitigation) from S.19/0291/FUL. (Site wide).
-
S.24/1889/DISCON Withdrawn
Stroudwater Canal Phase 1B Eastington Gloucestershire
Discharge of condition 32 (flood mitigation) from S.19/0291/FUL. (Site wide).
Timeline
Dates from the published record
-
14 Jan 2026
Received by Stroud
-
21 Jan 2026
Validated
Checked as complete and ready for consideration.
-
13 May 2026
Decision issued: Permitted
-
27 Jul 2026
Added to PlanIndex
Related applications
Cases linked to this one on the register
- Application: S.19/0291/FUL (Permitted)
Who's behind it
Company information only, from the register and Companies House
Stroud District Council Applicant
16 applications on PlanIndex · 100% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
20 documents on file for this application
- PERMIT THE DISCHARGE OF A CONDITION
- OFFICER REPORT - WEB
- PROPOSAL FOR TESTING AND MONITORING OF EXISTING STEEL SCOUR PILES,
- GEOTECHNICAL DESIGN REPORT
- CS 451 ASSESSMENT
- GEOTECHNICAL SUBMISSION REVIEW SHEET
- SUPPORTING STATEMENT
- INSPECTION REPORT- SHEET PILES AT M5 CROSSING
- APPLICATION FORM
- PERMANANT WORKS SPECIFICATION & RISK ASSESSMENT
- EXISTING CONDITION GENERAL PLAN
- EXISTING CONDITION PLAN & SECTION
- PROPOSED PERMANENT WORKS GENERAL PLAN
- PROPOSED PERMANENT WORKS PLAN & SECTION
- PROPOSED PERMANENT WORKS
- PROPOSED PERMANENT WORK SHEET PILE ELEVATIONS
- PROPOSED PERMANENT WORKS DETAILS
- PROPOSED PERMANENET WORKS REINFORCED CONRETE
- PROPOSED PERMANENT WORKS JOINT DETAILS
- PROPOSED PERMANENT WORKS RIVER LONG SECTION
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Stroud granted permission on 13 May 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About condition discharge and variation applications
This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Stroudwater Canal Phase 1B Eastington Gloucestershire
Discharge of condition 32 (flood mitigation) from S.24/1595/VAR. (Site wide).
Granted Conditions 9 docs -
Stroudwater Canal Phase 1B Eastington Gloucestershire
Discharge of condition 7 (canal channel bank design) for Phase 5 and 12 from S.26/0143/VAR.
Granted Conditions 8 docs -
Stroudwater Canal Phase 1B Eastington Gloucestershire
Discharge of condition 14 (Construction Surface Water Management Plan) for Phase 1a from S.24/2311/VAR.
Granted Conditions 4 docs -
Stroudwater Canal Phase 1B Eastington Gloucestershire
Discharge of condition 43 (construction hours) for Phases 1a, 1c, 3 and 11 only from the application S.19/0291/FUL.
Granted Conditions 5 docs -
Stroudwater Canal Phase 1B Eastington Gloucestershire
Discharge of condition 14 (Construction Surface Water Management Plan) for Phase 10 from S.24/2311/VAR.
Granted Conditions 3 docs -
Stroudwater Canal Phase 1B Eastington Gloucestershire
Variation of conditions 21 and 22 to remove drainage requirement for the M5 bridge and amend temporary western site access, remove Eastern access and remove drainage requirement for the M5 bridge from S.24/2311/VAR - Reinstatement of the 'Missing Mile' section of the Stroudwater Navigation and development of associated infrastructure including locks, mooring basin, car parking, cafe and leisure facilities building with combined office and residence for basin manager.
Granted Amendments 12 docs
Other condition discharge and variation applications
In Stroud
-
S.26/1509/DISCON Awaiting decision
Bradley House Bradley Green Wotton-Under-Edge Gloucestershire GL12 7PW
Discharge of condition 2 (lighting design strategy) from S.26/1015/VAR
-
S.26/0641/DISCON Granted
Beech House Church Street Kings Stanley Stonehouse Gloucestershire GL10 3HW
Discharge of condition 3 (rooflight), 4 (internal works) and 5 (schedule of repairs) from S.25/2132/LBC.
-
S.26/1193/DISCON Granted
Waterlane House Waterlane Oakridge Stroud Gloucestershire GL6 7PN
Discharge conditions 4 (Ecological Enhancement Plan) & 5 (Precautionary Working Method Statement) from S.25/2170/FUL - Erection of a walled kitchen garden. Rebuild existing boundary wall. Relocation of glass house.
-
S.25/2089/DISCON Withdrawn
Parcel H3 - H5 Box Road Cam Gloucestershire
Partial discharge of condition 19 (cycle path) from S.15/2804/OUT for parcels H3 - H5.
-
S.26/0610/DISCON Granted
Eastington Trading Estate Churchend Eastington Gloucestershire GL10 3RZ
Discharge of condition 5 (lighting design strategy) and 6 (biodiversity enhancement) from S.22/0273/FUL.