Planning application
S.26/0641/DISCON
Beech House Church Street Kings Stanley Stonehouse Gloucestershire GL10 3HW
Proposal
Discharge of condition 3 (rooflight), 4 (internal works) and 5 (schedule of repairs) from S.25/2132/LBC.
As published by the council, reference S.26/0641/DISCON
Timeline
Dates from the published record
-
13 Apr 2026
Received by Stroud
-
27 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.
What happens while it is decided
The process from here
This application is with Stroud for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About conditions applications
How this application type works
This type of application deals with conditions attached to an existing permission, either by supplying the details a condition requires, called discharging it, or by asking to vary or remove one. It does not reopen the principle of the permission itself. Building often cannot lawfully start, or continue past a set stage, until the named conditions are discharged.
Nearby applications
Within 500 metres
-
2014/0969/WIG Decided
8 Beeches Close Kings Stanley Stonehouse Gloucestershire GL10 3LQ
Construct a hard standing at the front of the property.
-
S.14/2893/106R Granted
1-10 Gardeners Way Kings Stanley Stonehouse Gloucestershire GL10 3HD
Request for the Section 106 Agreement associated with S.15807/C to the Removed.
-
S.26/1040/TPO Granted
The Old Rectory Church Street Kings Stanley Stonehouse Gloucestershire GL10 3JA
TPO/0301/A. T1. Robinia - Crown reduction by 4 metres in height & 2.5 metres in radial spread, T2. Copper Beech - Remove existing, outdated, Cobra bracing and replace like for like, T3. Oak - Crown reduction by 2.5 metres in height and 1.5 metres in spread, T4. Horse Chestnut - Crown reduction by 2 metres.
-
2014/0966/WIG Decided
White Lodge St Georges Avenue Kings Stanley Stonehouse Gloucestershire GL10 3HN
New dwelling
-
S.26/0445/TPO Granted
TPO/0301/A 9 Deacons Close Kings Stanley Stonehouse Gloucestershire GL10 3GA
T1. Walnut tree - Fell to near ground level.
-
2013/2613/WIG Decided
Kings Stanley Church Of England Primary School Church Street Kings Stanley Stonehouse Gloucestershire GL10 3HZ
30 min meeting at Ebley Mill (Proposed conversion to one residential unit)
Other conditions applications
In Stroud
-
S.26/1021/DISCON Decided
The White House Cam Dursley Gloucestershire GL11 5JA
Discharge of condition 3 (roof light) from S.26/0203/LBC.
-
S.26/1133/DISCON Decided
Workshop At Home Farm Park Lane Stancombe Dursley Gloucestershire GL11 6AT
Discharge of condition 4 (pre-commencement contaminated land) from S.26/0268/VAR.
-
S.26/0970/DISCON Split decision
Former Cotswold Indoor Bowls Club Merrywalks Stroud Gloucestershire
Discharge of conditions 3 (PRE-COM Soft & Hard Landscaping), 4 (PRE-COM site levels), 6 (PRE-COM Details of windows/door openings), 7 (PRE-COM Construction Management Plan), 8 (PRE-COM Pedestrians), 10 (PRE-COM Surface Water Drainage System), 11 (Pre-Occ Flood Evacuation Plan), 12 (PRE-OCC details of plant & machinery) & 16 (Contamination 1) from S.23/0402/FUL.
-
S.26/0849/DISCON Refused
Land At Colethrop Farm Bath Road Hardwicke Gloucester Gloucestershire
Discharge of condition 12 (contaminated land) from S.15/1498/VAR for parcels R2, R6, R8 and R10b only
-
S.25/1588/DISCON Decided
Land At M5 Junction 13 West Of Stonehouse Eastington Gloucestershire
Discharge of condition 8 (ground and floor levels), 17 (archaeology), 18 (detailed drainage strategy), 19 (SuDS), 21 (CEMP), 22 (landscape and habitat management plan), 23 (ecological design strategy), 24 (arboricultural protection method statement), 26 (tree and hedgerow retention method statement), 27 (external lighting assessment), 36 (construction method statement and construction traffic management plan), 44 (cycle parking), 46 (construction noise management plan) and 53 (employment and skills plan) from S.19/1418/OUT.