Planning application
S.25/2313/DISCON
Stroudwater Canal Phase 1B Eastington Gloucestershire
Proposal
Discharge of condition 14 (Construction Surface Water Management Plan) for Phases 1c, 3, 4a, 4b, 5, 7, 8 and 12 from S.24/2311/VAR.
As published by the council, reference S.25/2313/DISCON
Timeline
Dates from the published record
-
2 Dec 2025
Received by Stroud
-
8 Dec 2025
Validated
Checked as complete and ready for consideration.
-
22 Apr 2026
Decision issued: Permission
-
27 Jul 2026
Added to PlanIndex
After the decision
The process from here
The council has decided this application; the published outcome sits in the record above and the decision notice on the council portal carries the detail, including any conditions.
If permission was granted, work must normally begin within three years of the decision. If it was refused, the applicant can appeal within the statutory time limit or submit a revised scheme.
About conditions applications
How this application type works
This type of application deals with conditions attached to an existing permission, either by supplying the details a condition requires, called discharging it, or by asking to vary or remove one. It does not reopen the principle of the permission itself. Building often cannot lawfully start, or continue past a set stage, until the named conditions are discharged.
Nearby applications
Within 500 metres
-
S.25/2466/DISCON Decided
Stroudwater Canal Phase 1B Eastington Gloucestershire
Discharge of condition 32 (flood mitigation) from S.24/1595/VAR. (Site wide).
-
S.25/0252/DISCON Decided
Stroudwater Canal Phase 1B Eastington Gloucestershire
Discharge of condition 7 (canal channel bank design) for Phase 5 and 12 from S.26/0143/VAR.
-
S.24/1947/DISCON Decided
Stroudwater Canal Phase 1B Eastington Gloucestershire
Discharge of condition 43 (construction hours) for Phases 1a, 1c, 3 and 11 only from the application S.19/0291/FUL.
-
S.26/0130/DISCON Decided
Stroudwater Canal Phase 1B Eastington Gloucestershire
Discharge of condition 14 (Construction Surface Water Management Plan) for Phase 10 from S.24/2311/VAR.
-
S.26/0143/VAR Decided
Stroudwater Canal Phase 1B Eastington Gloucestershire
Variation of conditions 21 and 22 to remove drainage requirement for the M5 bridge and amend temporary western site access, remove Eastern access and remove drainage requirement for the M5 bridge from S.24/2311/VAR - Reinstatement of the 'Missing Mile' section of the Stroudwater Navigation and development of associated infrastructure including locks, mooring basin, car parking, cafe and leisure facilities building with combined office and residence for basin manager.
-
S.26/0081/DISCON Decided
Stroudwater Canal Phase 1B Eastington Gloucestershire
Discharge of condition 19 (M5 detailed design) for Phase 10 from S.24/2311/VAR.
Other conditions applications
In Stroud
-
S.26/1021/DISCON Decided
The White House Cam Dursley Gloucestershire GL11 5JA
Discharge of condition 3 (roof light) from S.26/0203/LBC.
-
S.26/1133/DISCON Decided
Workshop At Home Farm Park Lane Stancombe Dursley Gloucestershire GL11 6AT
Discharge of condition 4 (pre-commencement contaminated land) from S.26/0268/VAR.
-
S.26/0970/DISCON Split decision
Former Cotswold Indoor Bowls Club Merrywalks Stroud Gloucestershire
Discharge of conditions 3 (PRE-COM Soft & Hard Landscaping), 4 (PRE-COM site levels), 6 (PRE-COM Details of windows/door openings), 7 (PRE-COM Construction Management Plan), 8 (PRE-COM Pedestrians), 10 (PRE-COM Surface Water Drainage System), 11 (Pre-Occ Flood Evacuation Plan), 12 (PRE-OCC details of plant & machinery) & 16 (Contamination 1) from S.23/0402/FUL.
-
S.26/0849/DISCON Refused
Land At Colethrop Farm Bath Road Hardwicke Gloucester Gloucestershire
Discharge of condition 12 (contaminated land) from S.15/1498/VAR for parcels R2, R6, R8 and R10b only
-
S.25/1588/DISCON Decided
Land At M5 Junction 13 West Of Stonehouse Eastington Gloucestershire
Discharge of condition 8 (ground and floor levels), 17 (archaeology), 18 (detailed drainage strategy), 19 (SuDS), 21 (CEMP), 22 (landscape and habitat management plan), 23 (ecological design strategy), 24 (arboricultural protection method statement), 26 (tree and hedgerow retention method statement), 27 (external lighting assessment), 36 (construction method statement and construction traffic management plan), 44 (cycle parking), 46 (construction noise management plan) and 53 (employment and skills plan) from S.19/1418/OUT.